Sök:

Sökresultat:

3277 Uppsatser om Profitable and maintenance plan - Sida 2 av 219

Driftkostnadsanalys i väginvesteringsprojekt

During its lifetime, a road goes through a number of different stages; pre-study,inquiry of the road, work plan, documenting stage, building stage and operatingstage. The operating stage is the one that takes the longest time and costs themost. Those have a tendency of becoming unnecessarily high because the projectengineers don?t always take the management and maintenance prerequisites intoconditions.To decrease the management and maintenance costs, the Swedish RoadAdministration SouthEast has been in need of a work procedure that makes theroaddesign engineers take the management and maintenance of the road intoconsideration. This shall be achieved by a checklist where the most commondesigns that lead to increased management- and maintenance costs are compiledand listed.Through interviews with project leaders in management, the most commonproblems have been identified, analyzed and summarized under the headlineswinter-road, vegetation, road equipment and road designs.To elucidate the problem from several points of view, interviews wereimplemented with project leaders in investment and roaddesign engineers.

Långsiktigt spårväxelunderhåll - Förutsättningar och möjligheter

Due to their complexity and heavy wear from rail traffic, switches are a sensitive part of the railway infrastructure and moreover expensive to maintain. Furthermore, increasing railway traffic not only accelerates the wear rate but also obstructs the necessary maintenance measures. This paper examines the opportunities for a transition to a long-term maintenance strategy in the Swedish railway network. It contains a study of the maintenance strategy of Banverket, and also analyses statistics of errors in the railway infrastructure. The survey was completed utilising interviews with infrastructure managers, maintenance contractors, planners of railway operations and the Banverket material service department.

Inkongruenta styrmodeller: En fallstudie av reparation och underhåll i ett industriföretag

In theory, the management control of maintenance functions is described as problematic due to the nature of the work performed in the unit. The purpose of this thesis is to examine these predicted problems in practice. Further,the thesis aims at identifying how these control problems may affect the relationships between the maintenance department and its internal customers. A case study has been conducted in one of Sweden?s largest industrial companies to investigate the said control problems in practice.

En fallstudie om kompetensförsörjning : Hur ser kompetensförsörjningen ut på fallföretaget och på vilket sätt skulle ett webbaserat verktyg avsett för detta gagna företaget?

This essay contains material of how the competence maintenance works on a chosen company and how a web based tool developed for its use can help companies with competence insur-ance. As competence maintenance is a major factor to have a long term profit it´s necessary to be aware of the company?s future needs in the competence sector. This essay describes the company?s competence maintenance occupation needs taken from internal documents; it also identifies the need for competence maintenance and presents multiple areas of possible im-provements.

Strategisk/taktisk vägplan :

The purpose of this thesis was to create a strategic/tactical road access plan. This was done by designing an analytical method which gives the road manager a template to create long-term road access plans. The analytical method will help to identify and appraise roads to be upgraded and give information when it is time for building new roads. The study method involved developing an analytical method. The method was comprised of five main parts: the harvest plan, analysis of the road network, transport costs, quality and storage costs and finally, identification of investment alternatives.

Detaljeringsgraden i dagens detaljplaner, en studie av femtio planer för nyexploatering av större bostadsområden

In this report a study is carried out with the aim to identify added values of EPC projects implemented in schools in order to increase the interest of EPC projects on the market. The report examines how the planned maintenance, supervision, maintenance and corrective maintenance is affected, how insurance premiums and terms are affected, the indoor environment and how the tasks of the operating staff is changing. A literature study of energy savings, energy use in schools, maintenance and insurance as well as how energy efficiency improvements are related to the Swedish environmental objectives has been made. Visits were carried out in Ludvika, interviews were also carried out with operation technicians and local strategists in Ludvika as well as employees of insurance companies.Schools often have neglected maintenance and problems with ventilation and indoor environment. Schools also have a large energy saving potential due to their low utilization, mainly because they are empty parts of the year.

Skapa ett equalized underhålls/planeringsprogram samt minimera driftstopp

This report is a thesis on requests from Sandvik Mining and Construction (SMC) in autumn of 2012. The goal of this work was to study the feasibility of creating and implementing an Equalized preventive maintenance program in SMC maintenance operations and reduce downtime for preventive maintenance (PM). To investigate whether this was possible, the authors studied the current procedures for the PM. The authors have collected and analyzed all relevant information within the maintenance department reporting system as well as through interviews determined whether it is practical to introduce a Equalized PM programs. The authors had also studied the possibilities to entrust part of the maintenance work to the operators of the machine cells.

Projekt Pet Shop

This essay presents a business plan for the idea of a Pet Shop in Stockholm. The initial purpose of the essay was to investigate weather the company would be financially profitable or not. During the process we encountered problems and pitfalls that we felt contributed to the fact that our business idea is yet not realized. Therefore the second purpose of describing the process that an entrepreneur goes through when starting a new business came about. Besides the business plan for Pet Shop we present a selection of the theories that we found relevant for our situation, among others behaviour of entrepreneurial teams, network theory and execution.

LÖNSAMHETSKALKYL AV FUKTSÄKERHETSANSVARIG VID RENOVERING : En fallstudie av ett projekt där ByggaF-metoden har använts

The so called ?ByggaF-method? is a relatively new Swedish method to stop moisture from being built into a building. The method should prevent damages on buildings as a result of mould growth and moisture. The purpose of the method is to include moisture control in the entire constructionprocess, from the projecting phase and all the way to the management phase. Up until now, there is no proof if the method is profitable or not and no studies have been made on the topic.

Systemutveckling med avseende på systemförvaltning

This final year project is dedicated to investigate the problem domain of system maintenance management. The purpose is to find problems in the system maintenance management of today. Whether there is any problem that can be elicitated in the requirements engineering?s phase that could help to obtain more maintenance management friendly systems and if it is not possible to obtain more maintenance management friendly, what else can be done?It has been learned that there are many problems today in the problem domain and the most great ones are the system documentation, stress and a systemknowledge lack among developers, system managers and system users.The requirements that have been found for this problem is good documentation, and use of simple solutions in the creating of the system..

Miljöledning för underhållsteknik : Vilken miljökompetens behöver underhållspersonal?

The purpose with this article is to give examples how to remain and in a long run develop a higher interest in maintenance activities and knowledge. First reason is the changed age-distribution with more number of older employees among maintenance personnel staff and second reason is demand for education due the increasing demand in environmental responsibility.In spite of there is a lot of knowledge of maintenance in national organizations of interests it will not be used in a sufficient extent in many companies. This knowledge is an important base to use to re-built the missing or loosed skills in companies. The national organization UTEK is involved in European projects to validate knowledge of maintenance. Lost of or bad maintenance activities will always affect on the environment.Establish a network between companies is a good way to exchange information in their common business areas.

Klassificering av processutrustning - en grund för riskbaserat underhåll

In this report a systematic working procedure for risk classification of processing equipment from a maintenance point of view is described. How this system has been worked out is also an important part of the report. The classification system is adapted for use in complex processing plants. Preemraff Göteborg has been subject for the underlying study and application of the system.The system aims to give a good overview of the maintenance related risks at the plant. Furthermore, the analysis result is a good motivation for the suggested maintenance activities and as motivation for extended or decreased maintenance resources in total.

Upphandling av underhåll av tekniska anläggningar

The aim of this thesis is to investigate the procurement of maintenance at SvK. Byunderstanding the process that has led to the current procurement strategy; providesuggestions to how the procurement of maintenance can be improved to ensure thequality of future maintenance of the national grid.A god client can be associated with a number of qualities, ?acquisition competence?.Vinnova describes acquisition competence as the ability to plan, formulate,communicate and monitor. Different businesses and industries have different needsand opportunities and operate in different economic structures which requireadjustments in their acquisition competence. A number of areas have been identified,called areas of focus, where clients can adjust their competences to their markets.The areas of focus are competition, competence/quality, control and communication.By defining the need of acquisition competence for SvK and identifying problems, anumber of suggested strategies have been proposed.

Underhållskostnader för tröskor :

Costs of maintenance on combines are a subject of interest thus it constitute a large investment and cost for the individual farmer. Therefore it is important to have up to date knowledge and the right facts to be able to do reliable calculations on one of the largest investments for a farmer. The aim of this study was to compare costs of maintenance on combine/threshingmachine with the computer program for advising environmental issues in agriculture, STANK. Interviews took place and data were collected by handing out questionnaires to 20 farmers. A similar study conducted by Neuman (2003) investigated costs of maintenance and compared these with STANK. The results of this study have also been compared and examined related to data from SLA - Skogs och Lantarbetsgivarförbundet. The result shows that 18 out of 20 combines were given a higher cost of maintenance when using STANK compared to the numbers in this study.

Tillståndsbaserat underhåll till sjöss : Vad föranleder den begränsade användningen av tillståndsbaserat underhåll (CBM) till sjöss?

Today, maintenance is a big part of the daily life on board ships. It is also one of the bigger expenses a shipping company has and without any loss of quality tries to run as economically advantageous as possible. In the hunt for economical savings the shore-based industry has subsequently applied the use of condition based maintenance, CBM, were a component is maintained according to its actual state. This leads to a reduction of maintenance costs since no parts are unnecessarily replaced. However, within the maritime sector a periodical maintenance is still the most commonly used maintenance system.The purpose of this paper is to chart the factors that are the reason for the low implementation of CBM on board the Swedish merchant fleet's ships.

<- Föregående sida 2 Nästa sida ->