Sökresultat:
10246 Uppsatser om Production process - Sida 14 av 684
The wine production in FYROM : does the wine sector have a comparative advantage?
FYROM has a long tradition of producing wine. Wine production in FYROM is one of the greatest contributors of the agricultural share of their GDP. The aim of the thesis is to see if the wine production in FYROM has a comparative advantage compared to other countries that produce wine and if FYROM is able to sustain the advantage in the future. The countries chosen for comparison are Bulgaria, Croatia, France and Italy. The methods used in the thesis are the Balassa Index and Porter?s Diamond of National Advantage.
Design of Production Contracts : an examination of the Findus pea production contract
The Swedish processor Findus contracts approximately 500 pea producers annually to secure the company?s supply of green peas for human consumption. A production contract, which has had roughly the same design for decades, regulates the relation between Findus and the pea producers. Agriculture is typically a risky business. The main sources of risk in agricultural production are production risk and price risk.
Fo?rstudie fo?r automatisering av skateboardtillverkning
This report is based on a thesis that was carried out during spring 2012. The report covers the development of a preliminary study to Performance Sk8. The purpose of the study is to facilitate and contribute inspiration to Performance Sk8 to run an automation project to bring home their production to Sweden from China. The reason is to gain a greater ability to control quality, produce smaller batches and reduce the cycle time to reduce costs.The goal is that the preliminary study shall meet the requirements and wishes Performance Sk8 and other partners defined. The pre study will contain different cost proposals for the automation of selected process and serve as a basis for procurement of the equipment.The pre study has resulted in some proposed solutions to the various steps required to automate Performance Sk8 ?s production.
Slimmade möten, en undersökning av Leans påverkan på mötesprocesser
Lean has been studied intensely since the 1980s and it has been tested and successfully implemented in a wide variety of businesses. This thesis aims to examine the potential effects of a Lean implementation on meeting efficiency, a topic that has gotten little attention in the research community. First, a number of meeting problems are introduced, as they are perceived from the company that is the subject of the study. Second, the potential of introducing Lean in a meeting process is evaluated using the Lean Thinking principles. Third, the wastes that are generated from the meeting problems are identified.
Psykosocial arbetsmiljö : kommunikation och trivsel i industriella arbetslag
Relationships and trust between humans create the psychosocial working environment. This is a basic human activity and is communicated in a continually ongoing process. Conciseness about the value of trust and social capital motivates the need for work, with threats to communication, being conflicts and noise. This can create greater trust in the workplace as a whole, as well in the working team. Scientists are increasingly interested in these social relations in the working environment; there are profits, both for production and in terms of individuals2019 well being, in shifting the focus away from a purely production-oriented, economic perspective.
Stopptids- och avvikelseuppfo?ljning vid la?nga takttider : Fra?n avvikelse till info?rd fo?rba?ttring
High quality within a Lean production system begins with standardised work, which creates stable processes able to generate predictable output. If nonconformity from the standard procedures occurs, routines are needed to analyse, correct and prevent the nonconformity from occurring again. In that way, the nonconformity can be a trigger for continuous improvements toward more stable processes. In takted production lines, where the operator follows a standard sequence with tasks set to be completed within the takt time, a nonconformity leads to downtime in the operator?s sequence, and no value is added.
Optimization of Burner Kiln 7, Cementa Slite
In this report focus is put on the combustion process at a cement plant. Combustion is the
heart of the cement making process and absolutely crucial to have under full control and well
optimized.
The fuel is put into the process through a burner pipe and this burner pipe is modified to
reach a more efficient combustion. The primary target is to enable burning of heterogeneous
alternative fuels and increase the production level. Other positive effects from this type of
optimization is lowered specific fuel consumption and lowered CO2 emissions.
A redundant burner is chosen for the project and overall the project steps are the following:
1. Installing a Jet air nozzle ring in a way so it can move both axially and radially due to
temperature changes.
2.
BIM i planeringsarbetet : Effective planning by using BIM
AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.
Leanorienterad flödesutveckling : av kärntillverkningen på Affärsenhet Cylinder ASSA AB
Business unit Cylinder at ASSA AB in Eskilstuna are having problem with frictions in their Production process. Changes are occurring and older products along with machineries are phased out and transferred to low-cost countries. This opens up possibilities to at a larger extend customize physical flows after production flows. The authors where given the task to analyze the production and find problem areas to improve and to give suggestion on how Business unit Cylinder can work to optimize their production flow.The aim of the thesis work is to come up with suggestions on how to reduce the lead time in production and how the tied up capital can be reduced. In more detail the task included to find problem areas that are counteracting an effective flow, give solutions on new flows for the production of the cylinder core, give suggestions for new stock points for the production and how the production shall be managed and controlled.During the last twelve months ASSA AB has sold over 700 different types of cylinder cores, and the product range is very wide.
Lean Production och Psykosocial arbetsmiljö
Det fenomen som varit föremål för den här studien är psykosocial arbetsmiljö. Fenomenet har undersökts med inriktning på tillverkningsindustrin och organisationsformen Lean production. Studien syftar till att erhålla en djupare förståelse av hur medarbetarna i den här specifika kontexten upplever den psykosociala arbetsmiljön. De frågeställningar som studien ämnar besvara är:-Vad innebär en god psykosocial arbetsmiljö för medarbetarna i organisationen? -Hur upplever medarbetarna den psykosociala arbetsmiljön i organisationen? Studien genomfördes med ett induktivt förhållningssätt.
Svinnoptimering VTIS1
The goals of this Bachelors? Thesis were to establish the production loss through the VTIS1 Pasteur at Arla Foods Linköping dairy and then suggest simple but effective solutions to minimize the losses for each production run. If the timeframe allowed it, some of the solutions would be implemented and tested in full production to determine their impact on economic and environmental savings.The very first step of this project was to establish the statistics over what losses there is in the production pipeline through VTIS1, from milk and powders in mixer tanks to finished and packed products in cold storage. Then, when knowing how much product was actually lost and where, those bottlenecks could be pinpointed and examined more closely. At this stage the focus was switched, from the otherwise complicated and broad manufacturing process, to the VTIS1-aggregate, since early data indicated there were quite substantial losses there.In conjunction with this project Arla Foods purchased an absorption photometer-measuring device (OPTEK AS16) that could be inserted straight into the product stream out of VTIS1, allowing real time measurements of its optical density.
Robotfotboll
SUMMARYInventory of raw materials holds an important role in companies within the manufacturingsector. The inventory works as a buffer that secure the supply of materials to the productionunit. The aim of the inventory is to ensure that the company is able to meet the customers?demands despite fluctuations and variations in the material flow. The size of the warehouseand the layout are physical limitations for the quantity of articles that can be stored.
Marknadsundersökning av grisplättlysat för att ersätta serum i cellodling
High quality within a Lean production system begins with standardised work, which creates stable processes able to generate predictable output. If nonconformity from the standard procedures occurs, routines are needed to analyse, correct and prevent the nonconformity from occurring again. In that way, the nonconformity can be a trigger for continuous improvements toward more stable processes. In takted production lines, where the operator follows a standard sequence with tasks set to be completed within the takt time, a nonconformity leads to downtime in the operator?s sequence, and no value is added.
Eleiko 360°
This report will present athesis on behalf of Eleiko Sports AB and carried out by two students at the InnovationEngineering (University of Halmstad). In this report the project participants willdescribe the project background along with the current product issues andneeds. A clear structure for participants, stakeholders and information flowbetween these parts will be included in this report so that you can clearly seethe areas of responsibility. The report includes a timetable which the grouphas worked along and also methods used. In the development process you will beable to read about how the students in an interdisciplinary way have used themethods and come up with an entirely new product.
Analys av massapumps- och mixerarbete vid Metsä Board Sverige AB, Husums Fabriker : Energibesparingsåtgärder vid blekeri 4 & 5 med jämförelse mot ny utrustning
Husums plant has a selection of different pulp pumps at bleaching plant 4 and 5. The displacement- (HC-pump, Sund Defibrator PTD-60) and centrifugalpumps (MC-pump, MCA 42-200, MCP 30/20) are of interest in this report. The centrifugal pumps are controlled by throttle valves, which result in an energy loss. Chemical mixers are used to mix ClO2 into the pulp before proceeding into a holding tower where the bleaching process occurs.The energy demand of the different positions has been measured or calculated to be used in comparisons against new equipment. Quotations were requested and delivered from Valmet and Sulzer.