Sökresultat:
3009 Uppsatser om Production layout - Sida 4 av 201
Produktivitetsförbättringar : - förhöjning av produktiviteten vid mekanisk verkstad genom förkortade transportsträckor och standardiserad bearbetning
The aim of this project has been to raise the production efficiency of Daliff Precision Engineering through reduced transportation time and a more standardized manufacturing process. The problem has upraised because of a big and diversified product flora without any standard products and with just small batches ordered. The report also tries to show the work procedure with general analytical methods and be an example of how a similar problem can be resolved. The transportation time is being proposed to be reduced through a change in the layout of the factory. By moving a few manual machines, dispatch and burring to more efficient locations, the total transportation time will be reduced by 55 %.
Tjäna pengar som gräs? :
The producers of grain in Sweden are facing a rough future. The competition is getting harder all the time, in Sweden, in EU and also from the ?world market?. The producers have to be more efficient and have to have bigger units. Many producers might have to look for new alternative production opportunities.
En rörig historia : en fallstudie över Secorocs processflöde av DTH-rör
Abstract Title: A messy story ? a case study of Secorocs process flow of DTH-pipes Presentation date: 2010-06-02 Course: Bachelor thesis in businessAuthor: Kristoffer ForsmanAdvisor: Kjell GustafssonKeywords: Management control, process control, lean production, process flow analysisPurpose: The purpose of this bachelor thesis is to develop an overview of the process flow for a specific product, and with the help of this mapping based on a lean production philosophy show possible improvement proposals and how these can lead to a more efficient process flow.Methodology: I have used a case study of Secorocs DTH-pipes and my primary data are gathered through interviews and observations. I have used theoretical framework to establish a process flow analysis. This is to obtain data on process activities and whether they are creating value or not. This leads to a current mapping of the situation in Secoroc on DTH-pipes and then analyzed and suggestions for improvement are developed.Conclusions: That by using the above mentioned mapping of process flow of DTH-pipes, problem areas could be illustrated.
"Ettan" som kom först : En kvantitativ innehållsanalys av hur en studenttidnings förstasida förändrats genom tiderna
The aim was to explore how the first page of a student newspaper has been changed over time since it was founded in the 1960´s.This thesis explores how the front page of the student newspaper Lösnummer has been changed since it was founded in 1966. It concerns the location and frequency of elements and it is based on theories of layout, the first page and visual communicationIn addition, the thesis develops a new kind of method for determining the location of elements on the type area. The method is based on the hexadecimal number system. It is formed as a grid which is placed on the first page to determine the location of the elements.It concludes that the frequency of elements had its peak during the 1970´s and has ever since decreased gradually. Image placement has gone from being scattered all over the front page to be centered and increase in size. .
Layoutförbättring på KSL Trading AB:s lager för skivmaterial
KSL Trading Inc is a trading company in the Jönkoping area that distributesmaterial for the furniture and interior design industry.The purpose of this report is to analyze the existing material flow andwarehouse layout as well as to identify the issues there are today at KSL?swarehouse for board material. When we identified what kind of problems thatexisted we were able to design a new plan for the material flow and storagepossibilities. The problems we found where:? There is no well-organised warehouse layout? There are no routines to keep the warehouse clean and in order? There is no formed plan how to handle materialTo solve these problems we have used different methods like interviews,observations, calculations and literature studies.
Den brasilianska nötköttsproduktionens framtida utveckling :
To value the risk and opportunity for our production in Sweden it is necessary to understand the marketing development for beef cattle production in the world.
We have chosen to look at the Brazil beef cattle production. They are one of the biggest producers, have good opportunity to develop further and have a big affect at the world market.
The method of our work is to gather information from experts of beef cattle production, located in Brazil. We have also gathered information through studies of literature.
The factors that will have a big influence at the Brazil beef cattle production during the upcoming years is more efficient land use, lower age of slaughtering and extended use of feedlot-system.
Our conclusion is that the Brazil beef cattle will have a sharp increase during the next five years. The amount of pasture will not change during that time.
Integrering av pelletsfabrik med Rya kraftvärmeverk i Göteborg : en teknisk och ekonomisk utredning
Göteborg Energi has a surplus of district heating during spring, summer and fall. The heat surplus is due to a constant production of waste heat from oil refineries and heat from waste incineration over the year. It would be desirable to increase the demand for heat and the uptime for the newly built combined heat and power generation plant, Rya Kraftvärmeverk. One alternative could be to integrate Rya Kraftvärmeverk with a pellet production facility. By producing heat, electricity and pellet in a joint process the energy use can be decreased.
Behov av managementverktyg i mjölkproduktionen :
For the company to work well, it is necessary with a good economy, a high qualitative production and a well working system concerning the environment: the whole cycle on the farm needs to be working. At the same time, debaters about the environmental impacts are also requiring higher demands for the dairy farmers and therefore also the management programs. Management programs for feed evaluation calculations have been more developed over the years. Big amounts have been invested in the new feeding system with NorFor, but no one seems to have asked the dairy farmers what they themselves want to spend their money on, and what they need help with. For the dairy farmers it is necessary that the whole company is controlled in the right way, and much more than just feed evaluation is included in this.
Värmeåtervinning ur spillvatten. En utredning av möjligheterna med spillvattenvärmeväxlare.
This thesis is carried out on behalf of watermixer manufacturer Ostnor AB in Mora.The thesis deals with the area of Article Bound Instructions (ABI) at the company'sassembly department, regarding the layout and management routines involved withthese instructions.In the current situation there are problems with no uniformity in the manner in whichthe ABI is written, then referred to both the civil structure, images and specificityrates in the text.Another problem is that operators do not make use of the ABI that are available inthe current situation, and that there are no clear procedures for who has theresponsibility to write, update and change these ABI.During this work has several people that were identified as key personnel of thethesis held in order to get a handle on how the current situation of the variousobjects of the work looks like, and to examine different desires about the future ofthese should look like from the different subjects perspectives been interviewed.During the work, a number of deficiencies, including that the current program that isused to write the ABI, Lotus Notes, do not possess near the prerequisites for being asimple program to deal with when writing the ABI, which is a condition since wishesare about to put the responsibility for the ABI generation to the departmentsoperators, since their main task is to assemble and do not bother with a program in acomputer.The result of this work has generated new layout and structure of the ABI, designedto be used continuously in the assembly for evaluation, routines regardingresponsibility of the ABI for the Department of Production Engineering (PT),procedures for how the ABI should be written regarding amount of detaileddescriptions in the text and use of pictures.In addition, proposals for further work and improvements has been developed basedon experience during the work and presented at the end of the report..
Att färdas i symbios : ett gång -och cykelstråk anpassat efter trafikanternas rörelsemönster och behov
The aim of this paper is to examine the layout of public spaces and its effect on human behavior with focus on the relation between pedestrians and cyclists movement patterns in a specific path. The study emanates from the security aspect of pedestrians and cyclists, and builds upon previous theories and empirical studies about perception, security, information design, environmental psychology and behavior. The result shows that individual behavior and movement pattern differs with age, purpose, physical- and other conditions, and layout of the surroundings. A design proposal for improved layout of a path and a node between different oncoming paths has been developed to aid the users? needs, where a separation of walkways and bike lanes forms zones of security for the purpose of better orientation and a better flow between the users..
Modulgenerator för Matchade Transistorpar
Detta examensarbete syftar till att implementera en modulgenerator som automatiskt genererar ett matchat differentialpar. Detta för att enkelt kunna generera detta vanlig förekommande byggblock utan att behöva rita om allt från grunden. Modulgeneratorn som konstruerats klarar att skapa upp till 2x2 transistor block matchad layout med eller utan sköld. Programmet skapar med hjälp av indata från konstruktören en skräddarsydd layout som kan användas som byggblock i integrerade kretsar. Examensarbetet är slutfört och har genomgått omfattande testning The aim of this thesis is to implement a module generator that automatically generates a matched differential pair.
Informations- och kunskapsflöde i byggbranschen : En studie av informations- och kunskapsflöde till och från produktionsledare
This report that is written in cooperation with Peab Sverige AB, studies the information and knowledge management from the production support to the production management. The conclusion of this report is that to have a good and functional information and knowledge management it is necessary that the company has a good way of regain and handling experiences from its projects. The way to do this is to develop the managing system on the production management?s terms. It is also critical to find an easy way for the production management to use the system..
Leanorienterad flödesutveckling : av kärntillverkningen på Affärsenhet Cylinder ASSA AB
Business unit Cylinder at ASSA AB in Eskilstuna are having problem with frictions in their production process. Changes are occurring and older products along with machineries are phased out and transferred to low-cost countries. This opens up possibilities to at a larger extend customize physical flows after production flows. The authors where given the task to analyze the production and find problem areas to improve and to give suggestion on how Business unit Cylinder can work to optimize their production flow.The aim of the thesis work is to come up with suggestions on how to reduce the lead time in production and how the tied up capital can be reduced. In more detail the task included to find problem areas that are counteracting an effective flow, give solutions on new flows for the production of the cylinder core, give suggestions for new stock points for the production and how the production shall be managed and controlled.During the last twelve months ASSA AB has sold over 700 different types of cylinder cores, and the product range is very wide.
Produktionsavbrott - förekommer det effekter att lära av?
A large part of the time losses in production in modern manufacturing industry are a cause of unplanned interruptions in production. In this essay we have studied the effects of an unplanned interruption in production. The study was performed during one month on a press production line at Volvo Cars Body Components (VCBC) in Olofström. The effects of the interruptions have been studied on the basis of two perspectives of the environment of the production. The study started at the level of automation and was mainly done as a survey of the unplanned interruptions in production.
Materialgården - En verksamhet med förbättringspotential
Volvo Group Trucks Operations tillverkar motorer, växellådor och lastbilar till koncernens varumärken Volvo, Renault, Mack och UD-Trucks. Powertrain Production är produktionsenheten inom AB Volvo som producerar dieselmotorer och motorkomponenter. I Skövde består Volvos produktionsprocesser av gjutning, bearbetning och montering. Gjuteriet använder metaller och legeringar för att producera färdiga komponenter och delar. Tillverkningsmaterialet förvaras och hämtas från fabrikens materialgård.Materialgårdens tillväxt har skett okontrollerat genom åren.