
Sökresultat:
3466 Uppsatser om Production flow - Sida 12 av 232
Implementering av Lean genom TAK och SMED
This graduation work is a result of implementing Lean Production using OEE and SMED at Enics Sweden AB in Malmö. Enics doesn?t have an established improvement concept and therefore should this work serve as an introduction to possibly start with Lean Production. A result in this report is that an OEE value has been identified within a common order at Enics. Other results are that an implementation of a Lean-board has been implemented and furthermore, within SMED, a flag that indicates changeover..
Geotermisk fjärrvärme i Gunsta
Gunsta is situated about 10 km east of Uppsala. Today there are plans to establish 1000 new households in Gunsta before year 2030. The required energy for heating houses and water would be distributed via a district heating system, which also includes 200 existing residences. The annual required energy, according to this study, would be 16.2 GWh with a maximal peak effect of 6.9 MW.
To meet this need, the study suggests a system with heat pumps to upgrade the 31?C water from a 1.8 kilometre deep borehole.
Förbättring av utnyttjandegrad i robotcell
When a company in the manufactory industry makes costly investments, it's important that these are used as much as possible. The company in this case claims that their invested robot cell, with CNC machine isn't used enough. The questions here are: How can we improve the use of the robot cell? Which products are appropriate for the production in the robot cell? As a method to come to a conclusion, an analysis has been made over the manufactured products. And also interviews with machine operators and the production management.
Mätning av abrasivflöde för vattenskärningsmaskiner
The content of the following report is the summarized result of three students
thesis at Blekinge Institute of Technology in co-operation with Water Jet
Sweden AB.
This report will give the reader a description of principles how to measure the
abrasive mass flow in a waterjet cutting system.
The work began with a visit to Water Jet Sweden AB to get a closer look at the
problem. When the analysis of the problem was done the criteria were defined in
the form of demands and desires. The main task of the criteria was to guide the
search for the solution. The work proceeded with an extensive search for
abrasive flow meters along with obtaining information about flow measurement in
general. When the search for abrasive flow meters resulted in nothing all the
efforts were concentrated on finding a principle of measurement that could cope
with the criteria.
Vaktelproduktion för ägg och kött
The aim of this study is to review the commercial quail production for eggs and meat in the world. Another aim is to review the potential for increased production. Globally the quail production is very small, except in China where it is the second largest poultry industry. The production globally is small despite the quail's rapid growth, early sexual maturity and its high feed efficiency. The quail is also used as a laboratory animal and can be reared to be released in hunting areas.
Utvärdering av substrat för biogasproduktion
The purpose of this study was to evaluate the different substrates that enter the digestion on Sundet wastewater treatment plant for production of biogas.This work have done an analysis of data about the biogasproduction from January 2012 to feburari 2013, this showed that the food substrates has a greater gas production than internal sludge.Through laboratory test the VS, TS and COD values for all the substrates used in the biogas production could be determinded. But the COD-method was less optimal for analysis of fat and food, therefore it optimized the method for fat but due to time constraints, this could not be done on the food substrates..
Ledtidsreducering ur ett värdeflödes-perspektiv
This case study is performed within the production of Sherwin-Williams, Bellö. The purpose is to increase the understanding how a value stream can function more efficient, from a lead time perspective. With the analytical model that is build up on known theories, the purpose have been fulfilled. Mapping of value and non value time for four products thru their respectively process reveals wastes, which is, waiting, transport and movement, incorrect processing and set-up time that in it self create transport and movement. Thru identified wastes that causes loss in lead time suggestions of improvement has been proposed.
Ståndortsanpassning och produktionspotential för björk i Gävleborgs län
Large amounts of birch-timber are imported to Sweden, from particularly the Baltic States, since the domestic production can?t support the pulp industry. The goal of this study was to show the potential of birch and the area?s most suitable for birch production. The study was limited to Gävleborg County.
Using site characteristics, site index (SI) for birch was estimated on all National Forest Inventory plots in Gävleborg County.
Produkthantering vid tillverkning av roterande verktyg
AB Sandvik Cormorant?s production unit in Gimo has identified a need to examinethe handling of products between operations with the purpose of generatingproposals of improvement for the product handling.The aim of this project is to study the existing manufacturing process and givesuggestions for improvement. The proposals should reduce the manual handling ofproducts, decrease the risk of damaging the products during the manufacturing andform a basis for increased traceability. Based on a mapping of the manufacturingprocess and the problem description, a specification of requirements has beencomposed.The mapping of the manufacturing process suggests that a change of the currentsystem is required. The company is recommended to decide how the producthandling between operations should be performed as guidelines for the productionteam.
Översvämningsrisker längs Funboån
Flooding events are no longer rare, floods occur all over the world. Accordingly, it is vital for the society and different authorities to work with flood mapping. To meet the goal of Uppsala kommun to map the risks of floods in Uppsala län, a map of the different areas around Funboån which are inside the area of risk for flooding have been developed.In the work, cross sections and the water flow have been measured. Moreover, an echo-sounding have been carried out in Funboån to map the bottom topography. From the bottom map and laser scanned data covering the study area, a terrain model was created.
Hur mår svensk filmmusik? : En kvalitativ studie av svenska filmkomposito?rers fo?rutsa?ttningar i det nutida produktionsklimatet
This thesis examines Swedish composers' modes of work and production within the Swedish film industry. It starts off with a historical overview treating live music in early silent film, the conversion to sound and the Swedish production climate until present time. The analysis consists of contemporary empirical studies; interviews with people writing music for film, TV and commercials. The musician's perspective is in focus but directors and other film workers are heard as well. The situation for female composers in a male-dominated industry is also discussed.
Effektivisering av marina containerflöden : en fallstudie på Bertling
Logistics is an important concept in the organizational context in which the planning of flows, services and products are treated. Logistics handles supplier management, supply of materials, production and distribution. The distribution of goods can be managed with different types of transportation depending on price and time aspects. The lowest transport cost for larger amount of goods is by maritime shipping. A common carrier used in transportation of goods is a standardized ISO- container.
Uppbygnad av ett logiskt flöde vid produktionsövertag
The situation at Plastal AB is following; the plant in Simrishamn has not capacity enough but the plant in Kristinehamn has unused capacity. My task with this master thesis is to build a logistic flow between this two plants, optimize purchase quantities and ensure delivery safety.The production of the Intermediate Section (LS) will be divided between the plants. The LS will be produced in the following way; the injection moulding process will be done in Simrishamn and the assembling and lacquering processes in Kristinehamn, The reason to divide the production is to ensure delivery safety. Plastal AB can not move the whole production of the l.S because the two plants have different processes (moulding res. injection moulding).When the 1.5 has been transported to Kristinehamn following moments are included in this order; lacquering, welding and assembling.
Effektivisering av produktionsflöde : Införande av ny teststrategi
Ericsson AB in Katrineholm is a part of the Section Business Unit Network in the Ericsson Group. The plant's main task is to produce printed circuit boards in small volumes with a high product mix and focus on delivery and cost effectiveness. At the factory they produce printed circuit boards in the Module department.The Module department has for a long time had a high output of non-approved circuit boards in their production. This has led to a growing stock of non-approved circuit boards on the company?s repair department.The purpose of this thesis is to investigate how Ericsson in Katrineholm can increase the outflow of approved articles in their test process in the Module department.
Del projekt inom ClampCal - Utvärdering av mätmetoder för temperatur, viskositet och densitet samt röregenskaper
The dissertation were performed on SP, Technical Institute of Sweden.
The dissertation were carried out on the measurement technical department, this dissertation is a part of a bigger project, project ClampCal.
One of SP?s returning assignments are flow-measurement. When flow-measurement is performed, the flow has to be stopped so that a meter can be installed in the pipes where measurement is going to take place. At every stop there is time delay in the flow which causes the customers to loose money. This is why SP wanted to find a better solution so that measurement can be done without any stops in the flow.
Usage of a so-called Clamp-on meter was considered, but since the measurement uncertainty is too large it takes some investigation on the parts where the largest uncertainties occur and thus find a solution that can diminish the uncertainty as much as possible.
The parts that were considered to have an opportunity to reduce measurement uncertainties were the fluid temperature, its characteristics and the pipe geometry and its characteristics.
For the fluid temperature a Pt100-sensor with four different radii for various pipes was used.