Sök:

Sökresultat:

435 Uppsatser om Prefabricated-wooden-houses - Sida 13 av 29

Stomme i småhus ! : - En teoretisk studie av olika bärande vägglösningar !

This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.

Standardiserad tillverkning av nätstationer

AbstractAbetong in Falkenberg manufactures, among other things, small prefabricated concrete buildings for housing various installations, such as electric transformers.The aim of this dissertation is to reduce the time needed to design such buildings, by way of finding a number of standardized buildings. Standardized in such a manner as to incorporate both the needs of the manufacturer (Abetong) and its customers.To analyze the needs of the parties the work has included a market survey and calculations on the strength of these buildings.One survey was a letter questionnaire to all of Abetong?s customers who have, in the past, ordered these types of building. The aim of the questionnaire was to establish how the customers want these buildings designed.Another survey conducted was an inventory of all of Abetong?s previous projects where these types of building were manufactured.

Återvinningsstationer på Lidingö : attityder och lokalisering

When the producers? responsibility for packaging was introduced in Sweden in 1994 the industry set up public recycling stations to facilitate the collection of the waste material. In order to establish recycling stations at suitable locations the municipalities assist the industry?s service organization for operation of the recycling stations, the Package and Newspaper Collection Service (Förpacknings- och tidningsinsamlingen, FTI). The objectives of this thesis are to improve the service of the public recycling stations within Lidingö town and to increase the accessibility to these stations for the inhabitants of Lidingö.

3-D handlingar, GPS-styrning och VA-moduler- En ny metod för framtida anläggningsprojekt

Ground construction has to a large extent been dominated by traditional meth-ods during the last 50 years. Although the construction has been changed meanwhile innovations are not accepted. In collaboration with NCC Ltd Region South, I have examined a modern con-struction methodology that has been developed by NCC for future large pro-jects. The method is divided into two central phases. Phase 1 is? Single Pro-duction? which is a preliminary period for ground constructions to come.

Dagligt liv i Dalarnas medeltid - Ett försök att se dagligt liv och social struktur i ett gränsland

This paper deals whit the problems concerning social organisation in the county of Dalarna in middle Sweden during the Middle Ages 1050- 1528. This paper also deals whit the every day ife in Dalarna during the same period. In the paper archaeology, ethnology, history and osteology is used in order to create a so accurate as possibly picture of every day life at the farm, the villa and the keep. Each environment is compared to each other in order to try to see the social structure of the county. The geographic frame for the paper is the part of Sweden above the border zone of Limes Norrlandicus, or lower Norrland.The results presented in the paper shows that Dalarna most probably had a flat social organisation in the meaning that the every day life and its artefacts was much the same in all the environments.

Modulbyggd förskola - Framtiden?

In 1999 the childbearing increased, which in combination with the closure of a number ofpreschools led to the shortage and reduced capacity in available places for youngchildren. The lack of places in preschools has led us to try to find a solution to theproblem and in order to solve the problem we have interviewed personnel of preschoolsin Halmstad. The persons we met were asked to list advantages and disadvantages oftheir preschool and also to come up with innovative solutions and new ideas of how todevelop a satisfactory preschool. This was the basis for us when we drew our drawingsand our main objective was to find a new template for the development of pre-fabricatedpreschools.When drawing a new and modern preschool a number of considerations have to be made,first of all the main objective for the children is play and playtime, a second objective issound reduction and laws about sound reduction. Another consideration is how toconstruct the building and which method to be used, for instance should industrialtechniques be considered and pros and cons be listed.The main disappointment amongst the preschool personnel was that they had noinfluence in the planning stage of the new development of the preschool.

Högt hus i Chongqing/Kina - ett bostadsprojekt

This is a project showing a proposal on how a high-rise building gains qualities similar to middle rise houses of 7-9 stories. The closed, isolated and often anonymous life in the high building opens up through gardens. The resident meet the outdoor environment on the balcony, or has direct access to a garden.Instead of moving in a closed core, the resident will meet the climate and outdoor conditions as soon as he or she leaves the apartment.The project consists of two parts, where the first is presenting a building proposal, the second is expanding the knowledge through background research. The topics are history concerning the skyscraper and the skyscraper globally, closing up with the situation in China..

Smarta prefabmoduler för småhus i betong

This report examines the possibility of developing a modular system for concrete homes that cancontribute to greater diversity of today's market. The issue was whether it ? from a competitive pointof view ? is possible to produce smart prefab modules that customers themselves can combine to avilla. The report addresses the question how the modules and wall panels should be designed for thegreatest variety of floor plans.With regard to what is asked of the customer interviews where held for the purpose ofunderstanding concrete's popularity and elements of high value in their homes today. The answersfrom the interviews laid ground for four prototype homes which were made to demonstrate how theelements can be combined to achieve different types of houses..

En marknadsundersökning om regelvirke : kvaliteter och kunduppfattningar

Today there is a widespread opinion that the woodmarket and the forest industry are dominated by a traditional way of thinking and not adapted to the customers of today; a lot of products are produced purely on routine. Also, there is a demand for improving the quality of sawn woodproducts. AB Karl Hedin wants to sort this out by increasingly adapt their products to the demands of the market, i.e. through introducing a short wallstud of standard length, "Hedinregeln". At tirst, the wallstud will be produced in lengths of 2,70 m and of guaranteed quality.

Social hållberhet genom medborgardialoger : exemplet Husby

Understensho?jden is Stockholm's largest eco-village which was built in the early 1990s with the vision of enabling ecological living for people. However the ecovillage is no longer considered as environmentally friendly because of its relatively high energy consumption, and non-updated energy system. The purpose of this study is therefore to investigate how Understensho?jden should reduce their energy consumption and upgrade its energy system by using Blower-Door, IR-camera and Design Builder.

Konceptbyggande med standardelement

Syftet med examensarbetet är att hjälpa ett företag med att införa standardlittera för deras prefabricerade betongelement som ingår i deras Konceptet. Införandet av standardlittera ska resultera till att återfinna och gruppera deras betongelement i CAD-systemen. We did our thesis project at one of the most prestigious Swedish construction companies. We have examined the possibilities of doing sandwich elements to standard elements which would increase the degree of industrialization. The company has developed a concept that is based on a more refined process of industrialization.

Energieffektivitet och kvalitet på inomhusluft i radon förorenade bostadshus

To build a sustainable future should we first understand that; every aspect of our daily lives can affect the environment. It?s important that we take responsibility for understanding how we impact the environment and change our actions accordingly. The worlds total energy consumption equivalent to 80 million MWh / year. This corresponds to about 220 million MWh / day.Energy consumption is one of the main reasons for increased greenhouse gases when the reduction of this consumption has a great demand worldwide.In order to prevent the energy that consumed the buildings must be energy efficient but there is a conflict between radon ventilation and energy conservation in a building, given that ventilation can consume as much energy (currently 29-59% of energy-efficient houses use), especially in a cold climate as in Norway.

Hydd- och huskonstruktioner från förhistorisk tid : En kronologisk översikt från stenålder till tidigmedeltid i östra Mellansverige.

This thesis is a chronological survey over the hut and house remains from the Stone Age to the Early Middle Ages in Eastern Central Sweden. The thesis also contains a test which I have conducted to see which investigation method had the best results in identifying house remains at an archaeological site. I subsequently discuss the result of this test, what it represents and also what may be done differently in order to get other types of results..

Möjligheterna för Casabona-systemet

Abstract New methods, techniques and tools for the building industry are constantly being developed and improved and launched on the market. The problem in the building industry development is not that the products are not good enough. The problem is instead that the existing construction companies do not choose to use these innovations, instead they continue to employ the technologies they already possess and master. This leads to the fact that the construction industry is, in the public eye, beeing seen as a conservative industry. AquaVilla is a company that basically produces houseboats.

Utvecklingsanalys av installationssystems montering vid industriellt träbyggande : Värme, vatten, ventilation, el och avlopp

The industrialized timber housing process is capable nowadays to build multi-storeyhouses since fairly new changes in the Swedish regulations where made after theadmission of the European Union in 1994.The industrialized process moves parts of the construction process into a highlyeffective factory where 3D-volumes of the building are prefabricated beforetransportation to the building site for assemble.The assembly process is relatively effective compared to the completion of thebuilding service system and this is therefore the main focus in this thesis. This thesisattends problems with completion of the building service system, and thereforedemarcates from other aspects, such as technical and economic aspects, of thebuilding service system.The degree of completion of the flats differs from completion of the connectivepassages, for example hallways, in a way that suggests a need for further investigation.This thesis includes analysis of the possibilities to increase the prefabricatedconnective passages, to the extent of containing building service systems.An increase of the prefabrication of the building service system has a greatdevelopment potential, even though some restraining factors need to be solvedbefore implementation.This thesis was made in collaboration with two of Sweden?s leading companies on themarket of multi-storey industrialized timber housing, Moelven ByggModul AB andLindbäcks Bygg AB..

<- Föregående sida 13 Nästa sida ->