Sökresultat:
882 Uppsatser om Pre heating of wood chips - Sida 11 av 59
Utvärdering av Hultdins prototyp för portabel bro (drivningsbro) :
Stronger demand has been put on forestry to show environmental considerations during harvesting. This is especially for crossings of brooks with sensitive elements and great care should be observed when they are to be crossed during harvesting by logging machines. For that reason Hultdins has constructed a portable bridge that can be used for those occasions. The bridge has been developed in accordance with wishes from SCA forest, since they have a great deal of brooks in their forests and in private forests from where they buy part of their wood supply.
The aim for this report is to investigate if this portable bridge can be of interest for the forestry market. The research has been made at SCA skog in Medelpad and Norrskog in Medelpad.
Högtempererat borrhålslager för fjärrvärme
The district heating load is seasonally dependent, with a low load during periods of high ambient temperature. Thermal energy storage (TES) has the potential to shift heating loads from winter to summer, thus reducing cost and environmental impact of District Heat production. In this study, a concept of high temperature borehole thermal energy storage (HT-BTES) together with a pellet heating plant for temperature boost, is presented and evaluated by its technical limitations, its ability to supply heat, its function within the district heating system, as well as its environmental impact and economic viability in Gothenburg, Sweden, a city with access to high quantities of waste heat.The concept has proven potentially environmentally friendly and potentially profitable if its design is balanced to achieve a good enough supply temperature from the HT-BTES. The size of the heat storage, the distance between boreholes and low borehole thermal resistance are key parameters to achieve high temperature. Profitability increases if a location with lower temperature demand, as well as risk of future shortage of supply, can be met.
Sammankoppling av fjärrvärmenäten i Nyköping och Oxelösund : miljö- och systemkonsekvenser
District heating covers most of the residential areas and industries in the twoneighbouring Swedish municipalities Nyköping and Oxelösund. In Nyköping,Vattenfall AB Värme produces heat in a bio-fuelled CHP plant. In Oxelösund,waste heat and use of waste gases from the steel production at SSABOxelösund is the basis in the district heating system.This report examines the environmental consequences of a connection betweenthe two district heating systems. A broad system approach is used and the focusis on environmental effects in the system.A system analysis has been performed on the result of simulations of differentheat and electricity production alternatives. The alternatives simulated wereone where Vattenfall Nyköping covers the base load in the joint district heatingsystem and two where the power plant at SSAB Oxelösund supplies the heatbase load.The conclusion in this report is that the consequences of connecting the twodistrict heating systems can be both positive and negative, depending onsystem boundaries and on the environmental focus.
Fjärrstyrd undervattensfarkost
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Optimering av B-stolpe
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Kan detektorer förebygga tågurspårning?
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Hunnebergs Gård ? en förstudie av möjliga verksamheter
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Modellering och verifikation av hjulupphängning för ett ultralätt elfordon
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Solenergi : en lönsam investering för ett lantbruk?
A possible way to reduce pollution and slow down the process of global warming is to increase the usage of renewable energy sources. One of these renewable energy sources is solar power. With the aid of solar panels and solar cells the energy from the sun can be transformed into both heating and electricity. The requirement to use the sun in this fashion is a suitable surface, for example a big roof, an angle between 40-60 degrees and that the surface should be exposed to the south. Almost every farm meets these requirements.
Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Beräkning av energianvändning i svenska småhus
An energy calculation model for Swedish houses that is fast, flexible and user-friendly has been developed within the framework of this thesis. The model also provides a set of actions which may be investigated in the model based on savings and payback period. Energy use in a house depends on the technical conditions, such as building envelope and heating systems, which outdoor climate the house is exposed to and who lives in the house. Energy use for a house can be divided into heating, hot water and household electricity. There are several methods to calculate the energy use of a house. This report summarizes the methods that may be suitable for a fast and user-friendly calculation model.
Företags informationsförmedling i en bostadsköpprocess
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Utformning av förfrågningsunderlag vid totalentreprenader
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Studie av Karlskogas fjärrvärmenät för att sänka returtemperaturen
A district heating plant has the advantage that it can take advantage of the waste heat from industries and use of cheap fuels to produce heat. But for the long term is competitive requires that energy is also saved in district heating plants. One way to save energy in a district heating system is to increasing cooling to the return temperature. This leads to less power needed to drive the distribution pumps, and that more energy could be extracted from the same amount of fuel by an improved flue gas condensation.In Karlskoga the return temperature into the district heating plant is high. They would therefore reduce the return temperature in order to extract more energy from the flue gases.
Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.