Sök:

Sökresultat:

1594 Uppsatser om Plant site - Sida 51 av 107

Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Föroreningstransport med dagvatten - Utveckling av reningsmoduler för modellverktyget Mike Urban SWQ (Storm Water Quality)

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Mätningar och undersökning av elkvaliteten i elnätet på reningsverket GRYAAB, i Göteborg

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Inventering av bitumenbundna lager med hög stabilitet ?hård asfalt? anpassade för stora hjultryck på industri- och hamnytor

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Effektivisering av dataflödet mellan anläggningsmodell och maskinstyrning - En översikt av flödet från konsult till entreprenör

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Konstruktion av turbinmodell för kaplanturbiner

Denna rapport beskriver arbetet med utvecklingen av en ny modell för kaplanturbiner. Utvecklingen bygger på två kopplade differentialekvationer som under arbetets gång anpassats och implementerats i turbinmodellen.Modellen beskriver hur vattenflöde och turbinmoment påverkas av avvikelsen från den optimala kombineringskurvan för vinklarna på turbinens ledskena och löphjul, och är anpassad för ett referensaggregat med tillgängliga provdata. Även övriga enheter i vattenkraftaggregatet modelleras och sätts samman med frekvensregulator och elnät för att simulera aggregatets reglerstabilitet i önätsdrift.Verifieringen av turbinmodellen sker genom försök att återskapa de befintliga verkningsgradskurvorna med hjälp av modellen. Resultatet visar en god följning av de verkliga kurvformerna, dock med något lägre maximal verkningsgrad.Verifieringen av önätmodellen sker genom att prova stabiliteten i nätfrekvens och turbineffekt vid stegpålastningar. Resultatet ger en stabilare reglerstabilitet än i verkligheten, men uppfyller ändå förväntningarna på en fungerande modell.This report describes the development of a new kaplan turbine model.

Trygghetsskapande design av Mörby stadspark :

The purpose with this thesis is to investigate how to design a urban space so that it is experienced safe and how to implement this at an actual site. Knowledge on the subject has been gathered through litterature studies and interviews with experts. Through an analysis of the site with surroundings and studies of projects with similar problems, practical actions have been observed. Part taking in the municipalities planning process has given insight in the projekt as an whole and the interests of different parties. There are many different opinions about what the word safety means. It is a feeling depending on situation, that is affecting our daily behaviour.

Arsenikförorenad mark efter träimpregnering : fastläggning, spridning och efterbehandling

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utformning av utskovskanaler och nedströmsslänter : En jämförelse av energidissipation vid överströmning av fyllnadsdammar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Effektivisering av kvävereduktionen i en konstruerad våtmark avsedd att behandla avloppsvatten

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Anpassade energisystemlösningar för passivhus - med hänsyn till byggnadens värmekapacitet

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Miljöanpassade tjänsteresor. En kvalitativ studie av privata aktörers resepolicy

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Hör träbränslena hemma i växthusen? :

With the elevated oil prices of today it is necessary to look for other heating alternatives. If the oil price continues to develop in the same way it has done the last years it will soon be impossible for many producing garden companies to survive. The purpose of this diploma work is to compare three different fuel options in order to find the most economic one considering the conditions of Katrinebergs Handelsträdgård AB. In relation to oil it is profitable to change to any of the three alternatives: wood chips, wood pellets and grain. The most profitable option is to change to wood chips. This alternative has a payoff time less than three years and after that the annual saving compared to the oil is relatively high. The annual cost is 65 % of the cost of the oil alternative.

Duo - ny skola på Hälsingehöjden

A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.

<- Föregående sida 51 Nästa sida ->