Sökresultat:
1207 Uppsatser om Plant composition - Sida 40 av 81
Skogsbränslets fraktionsfördelning
This study has analyzed particel size distribution and needle content in chipped logging residuals (branches and tops) delivered to the district heating plant Ryaverket in city of Borås, Sweden. Two fuel assortments has been analyzed: Chipped logging residuals from pure softwood and from mixed fuel (connifers and broadleaves). The samples has been sieved at Linneaus University laboratory.The study of particle sizes indicates that only 53,2 % of delivered fuel is within the fuels specification (7? 45 mm). The needle content is in this study 12,4 % (dry mass) which is higher than expected..
Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Strategier hos de stora svenska byggföretagen 1992-2006
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Från miljöbistånd till hållbart bistånd : - En historisk studie
AbstractWith this c-composition, I am trying to give a view over what has happened in the political area and the issues that concerns environmental aid. My analyze starts in the 60-ies when the environmental debate took of. It continues trough the 70-ies, 80-ies and ends in 1994 with the report that considers the UN-conference in Rio de Janeiro 1992, ?Sustainable Aid? and what the results of the more and more important issue ?sustainable development? has offered the Swedish government ant there work with environmental aid.The question issue is: At what time in history, did the Swedisch government start to addrsess environmental aid? How did the environmental aid come to be addressed and developed in the political area from the Brundtlandreport ?Our common future? from 1987 to the UN-conference in Rio de Janeiro 1992?The result is that the environment is getting more and more important in the political arena as the knowledge about the escalating crises with the environmental problems are being taken more seriously. The problems with the environment has to be considered together with the rest of the aid- and developing questions like economy and the struggle to reduce poverty in the world.
Projekteringshandbok i praktiken. En studie om hur en projekteringshandbok används och kan förbättras
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Optimerad bildsökning ? Bör vissa egenskaper prioriteras vid sökning efter en viss kategori av bilder?
As the information society becomes increasingly flooded with digital images, the need for efficient image retrieval systems increases as well. To handle the vast amounts of data involved, the indexing process needs to be run automatically, using content-based descriptors extracted directly from the digital image, such as colour composition, shape and texture features. These content-based image retrieval systems are often slow and cumbersome, and can appear confusing to an ordinary user who does not understand the underlying mechanisms. One step towards more efficient and user-friendly retrieval systems might be to adjust the weight placed on various descriptors depending on which image category is being searched for. The results of this thesis show that certain categories of digital images would benefit from having extra weight assigned to colour, texture or shape features when searching for images of that category..
Laddningens påverkan på sprängskadeutbredningen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Uppföljning av räckesreparationskostnader inom Vägverket Region Norr/Sydöst
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ekonomiska konsekvenser för energisparande åtgärder vid ombyggnad. Upprustning av miljonprogrammet
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Mätning och undersökning av elkvalitén i elnätet på reningsverket GRYYAB, Göteborg
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
BRA Metodik - Balanserad ruttanpassning för mjölkrundetåg i JIT-organiserade monteringsavsnitt
This thesis aspires to construct a routing optimization method customized for Volvo Powerstrain?s manufacturing plant in Skövde, Sweden. In order to enforce Volvo?s own understanding and control of there own organization, as well as optimize the utilization of the in-house tow trains, the BRO methodology where created. The methodology where created from observations of the currents working environment, analysis of order data as well as a comparison with two similar producing factories.
Energieffektivisering av flerbostadshus i miljonprogrammet
This thesis has been written with our society?s current energy-situation in mind.Although it only deals with one particular block of buildings, the solutions and suggestions presented herein are quite applicable on other objects of the same type.This thesis is intended to be used as a guideline for energy-preserving projects in general, with an eye to buildings erected during the Swedish ?million-programme? in the sixties and seventies.The paper starts with the acquiring of all necessary blueprints and technical specifications. It then moves on to a thorough description of the buildings in question, and their heating- and ventilation-systems.Followed by this the reader is guided through the successive stages of energy-perseverance measures that are available, and possible. Reasoning around the economic factors concerning all measures is also held.The paper ends with conclusion, and a discussion concerning the delicate issue of the higher return-temperatures possibly reaching the district-heating plant..