Sökresultat:
10239 Uppsatser om Performance measurement system - Sida 42 av 683
Prognostisering av höga grundvattennivåer med Chalmersmodellen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Konstruktion och penetrationstestning av VoIP-system
VoIP-system inom fo?retag blir mer vanligt. Sa?kerheten bo?r da? beaktas fo?r att undvika hot som riskerar konfidentialitet, integritet och tillga?nglighet. Denna rapport visar resultat fra?n tva? olika VoIP-systems sa?kerhet med hja?lp av praktiska penetrationstestscenarion i labbmiljo?.
Optimering av UA-Värde : Förbättring av en containerkonstruktion
Envirotainer builds containers that are specialized in transporting of temperaturesensitive products these containers are customized for airplanes. The containers arethen leased to other companies, most often to pharmaceutical companies.Envirotainer are based in Lagga, Knivsta. It is also here where the production of thecontainers is held. The container RAP T2 was designed in the early 80ies. The RAPT2 contains a fleet of about 1220 containers spread all over the world.
Design av system för distribution av larm
Inom styr- och reglerteknik är hantering av larm en viktig fråga, speciellt då fastighetsbranschen mer och mer börjat automatisera driften av fastigheterna. Det finns ett antal system på marknaden som erbjuder larmdistribution via en mängd olika transportsystem. Syftet med projektet är att undersöka om det finns alternativ till dessa som erbjuder mer flexibilitet, samt att designa en prototyp till ett system som använder denna alternativa metod. Två befintliga system analyserades och en kravspecifikation baserad på analysen upprättades. Utifrån denna designades en prototyp som sköter distributionen över Internet och en enkel implementation av en del av designen har gjorts.
Balanced Scorecard utifrån ett hållbarhetsperspektiv : En studie av statliga företags hållbarhetsrapporter och dess möjlighet till integrering med ett Balanced Scorecard
Today, companies work with issues concerning Corporate Social Responsibility (CSR). A higher demand from customers and other stakeholders as well as an extended legislation are great reasons. Framework and guidelines for sustainability reporting has been developed which includes indices that companies are able to report. Though, for a long term work with sustainability a functional system and internal tool is necessary. Balanced Scorecard, BSC, is a useful tool and efforts have been made to integrate BSC and CSR with purpose to establish the work with sustainability in a more concrete and clear way.
Automatisk trimning av drivsystemreglering från MATLAB
This master thesis covers the development of an automatic tuning process for the existing speed controller for drive systems. The drive systems are resonant two-mass systems where a motor is used to drive a load connected by a shaft. The developed method relies heavily on system identification and the construction of a complete mechanical model of the process. With this approach, the common problem with poor load speed control that derives from measuring only the motor speed can be addressed and solved for a majority of such processes.The automatic tuning method has along with general test functions been implemented in a complete tool for automatic tuning, testing and performance evaluation and reporting for drive systems..
Testsystem för utredning av integrerad styrning för RC-helikopter
AbstractThis report is about the creation of a test system for development of a control system for a off the shelf RC-helicopter, which can be bought for about two thousand SEK. The test system consists of both electronics for controlling the helicopter and mechanical constrainer. The constrainer is used for mounting the helicopter so that it won´t crash.A circuit board including processor and sensors was manufactured. This was used for doing test of the different control algorithms. In this way were we able to analyze the quality of the sensors chosen, and what other sensors that could contribute to the control of the system.Basic helicopter control have been studied and presented in the report.
Relationen mellan prestationer och ersättning
The thesis handles the principal-agency problem between shareholders and the Chief Executive Officer. The purpose of the thesis was to examine the link between CEO compensation and corporate performance measured as a change in Market to Book ratio. Data was collected from corporate annual reports between the years 2000 ? 2008 and the study covers 39 Swedish companies from the Stockholm Stock Exchange Large Cap list. To examine whether there is a link between the CEO´s compensation and firm performance, we performed a regression analysis, and no significant relation is found.
Mot mer flexicurity?
Since the 2006 election, the debate surrounding the Swedish labour market policy has intensified. There has been a discussion about a need for change towards a more flexible labour market. An example of this is on the other side of the strait, in neighbouring Denmark. Their flexicurity model, ?the golden triangle?, is characterized by a flexible labour market, generous unemployment benefits and active labour market policies.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Bostadsbyggande i Skövde fram till år 2025
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.