Sök:

Sökresultat:

1615 Uppsatser om Pairwise comparison - Sida 19 av 108

Förhöjda havsnivåers påverkan på trafiksystemen. En analys av riskläget i Göteborgs innerstad

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Samverkansanalys mellan påle och kohesionsjord. Studie av FE-programmet PLAXIS 3D FOUNDATION

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kartering av föroreningskällor i urbana avrinningsområden

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Tillämplig lag för arv och testamente

AbstractSweden applies two different private international statutes to establish which country´s domestic law that is applicable in a certain situation regarding succession and will with connection to two or more states. The first private international law is the one used in relations between Sweden and the other Nordic states. The other private international law is the one used between Sweden and all other states than the Nordic ones. A proposal for a Regulation that regulate jurisdiction, applicable law, recognition and enforcement of decisions and authentic instruments in matters of succession and the creation of a European Certificate of Succession has been prepared by the Commission and was published in October 2009. This regulation will, if it enters into force, modify the situation in Sweden for applicable law on a situation regarding succession and will.

Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Värdeskapande i Leveraged Buyouts i jämförelse med noterade företag

The purpose of this thesis is to study the difference in value generation and its drivers between leveraged buyouts and listed companies. The primary objective is to observe if differences exist. A secondary objective is to understand the differences and attempt to provide an explanation based on earlier research on Private Equity. A selection of large Swedish LBO-transactions, carried out between 1998 and 2012, are analyzed and their value generation drivers subject to comparison with a weighted index of companies listed on the Nasdaq OMX Stockholm. A clear difference in value creation is observed, both in size and composition.

Vadå språkutvecklande arbetssätt? : En studie av tre olika klassers undervisning med fokus på språkutvecklande arbetssätt

In a municipality in the county of Stockholm there is a preparatory class which accepts newly arrived children from other countries. In the preparatory class the education is focused on teaching students the Swedish language so that they eventually, after about 3-4 -terms, can be transferred to a "regular" class.For students with a different native language, it takes about 5-7 years longer to learn the knowledge-based language that is used in school (Gibbons 2009: foreword). This requires education in school to be linguistically developing.The purpose with this essay is to gain knowledge on how pedagogues can work in a linguistically developing manner with students who have Swedish as their second language. The comparison between education in a preparatory class and education in two regular classes at two different schools is also part of that purpose.What is the education considering linguistically developing work methods like in the preparatory class and the" regular" classes? Are there differences and similarities between the preparatory class and "regular" classes education when it comes to linguistically developing work methods? Which part of the education is adapted to a linguistically developing perspective that fits students with Swedish as a second language?Theories as the socio cultural theory, the proximal zone, and Jim Cummins model, concerning among other things language and knowledge development, is brought up and linked to the study of differences and similarities between schools.

Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 19 Nästa sida ->