Sök:

Sökresultat:

67 Uppsatser om Overhead crane runway - Sida 4 av 5

Akuta effekter av assisterade hopp på kvinnliga idrottares hoppförmåga

Vertical jumping ability is an essential skill in many sports. The aim of this study wasto investigate the acute effects of assisted jumps on subsequent countermovementjump (CMJ) performance by female athletes. Nine healthy, trained female subjectsvolunteered to participate in the study. In a randomized order, they performed oneregular warm up protocol before testing their CMJ baseline value, and one warm upprotocol with an addition of five assisted jumps at 30% body weight reduction beforeanother CMJ test. Elastic cords attached to an overhead pulley system and to aharness around the subjects' upper body were used to reduce the body weight.Significant improvements were noted in jump height, 2.3 cm (7%), positive forceimpulse, 4.7 Ns (2%), vertical take off velocity, 0.1 m/s (3%), countermovement time,0.1 s (12%) and breaking time, 0.1 s (14%), p.

En vindkraftparks inverkan på Gävle Energis elnät

The effects from a planned wind farm on the grid utility Gävle Energis electrical grid have been studied. The wind farm is planned to be built in the forest 15 km north of Gävle and will have 23 turbines with rated power from 2 to 2.5 MW, resulting in a total installed power between 46 MW and 57.5 MW. The grid connection will be made at 70 kV. The aim of the analysis was to determine what effects the wind farm would have on the power grid in the form of electrical disturbances (flicker etc.), need for new investment and raised operational cost. To allow the connection of the wind farm technical solutions (new lines, power stations and grid reinforcements) have been constructed.

Anslutning av givare och ett dSPACE-system till en hydraulisk kran

Det här rapporten är en del av mitt examensarbete för högskoleingenjörsexamen i elektroteknik vid Växjö Universitet, MSI. Arbetet är en del av ett större projekt kallat Kranstyrningsprojektet som bedrivs av Växjö Universitet, Rottne Industri med flera, vars syfte är att underlätta för förare att kontrollera den kran som finns på Rottnes skotare. För projektet har det använts en laborationskran och nu har önskemålet varit att det till kranen ska installeras ett nytt styrsystem från dSPACE. Dessutom vill man att nya givare ska sättas på kranen och kopplas till dSPACE. Man vill även ha en manual för att nya studenter ska kunna använda systemet.

Realisering av en modulär skogsmaskin - En skalmodell

Wood for commercial use is harvested from forests using forest machines like harvesters which folds, branches and cuts trees and forwarders which transports logs to a landing area for further transport to a processing facility. Future forest machines have to be much gentler to the machine operators and forest soil than today's machines. Hence new machine solutions must be developed and tested. A practical way is to develop a physical scale model which can be used as a test-bed to incorporate different types of solutions for suspensions, cabin damping, tires and tracks, crane and overall architecture. The aim of this project was to develop such a 1:5 scale model of a forest machine, named as ?Skogbil.A scaling strategy was employed to arrive at important scale dimensions and specifications ofSkogbil which would be comparable to the full scale model.

Produktivitet vid stubbskörd :

Stump harvest could be found in the late 1970?s and the early 1980?s. And now when the prices on energy are high it has become an interesting topic again. This work has been conducted within Holmen Skog?s stump harvest testing in Norrköping.

Träning och manuell behandling för att minska impingementliknande symptom i skuldran hos idrottare? : En systematisk litteraturstudie

AimThe purpose of this study is to investigate whether there is scientific evidence that exercise and/or manual therapy can improve function, in terms of increased mobility and strength on shoulder impingement-like symptoms among athletes. Another aim is to investigate whether these interventions can reduce shoulder pain.MethodA systematic review was conducted in the databases PubMed, CINAHL, PEDro and Amed. A total of thirteen articles were selected for further review and compilation. They were then graded for level of evidence according to the PEDro scale and the Swedish Council on Technology Assessment (SBU).ResultsThe systematic review shows that there is strong scientific evidence that acupuncture and heat can reduce pain in athletes diagnosed with supraspinatus-tendiopathy. There is limited scientific evidence that exercise increases strength, limited scientific evidence that stretching increases mobility and insufficient scientific evidence that a combination of treatments, with both exercise and stretching, reduces pain and increases function in overhead athletes.ConclusionsExercise and manual therapy can reduce pain and/or improve function in terms of increased mobility and strength in athletes with shoulder impingement-like symptoms.

ABC och ekonomisystem : En studie av Volvo Construction Equipment Components AB

The accounting information system comprises budgeting, accounting, and costing. The accounting information system has, traditionally, constituted an integrated system where the different elements collaborate. If ABC is introduced this order is disturbed, since ABC is based on another logic which cannot easily be integrated with budget and accounting. ABC, therefore, is usually used parallely to the conventional costing method. There are, however, companies that have taken its ABC one step further by letting it replace the old costing model and integrate it with the accounting information system.

TOMO Hugglink

Tomo Hugglink (TOMO Skog) is an innovation for harvest and transport of biofuels. The system consists of a truck, a chipping unit and crane mounted on a link and a wood chip trailer. The system works in such a way that the chipping unit is disconnected and placed on the site and wood chips are loaded directly into the wood chip trailer.The aim of this study was:- To examine the performance of the TOMO Hugglink system under different conditions such as the size, placement and quality of the pile.- To calculate the cost per raw ton for two vehicle combinations at different transport distances and to examine the effect of a reduction in set-up time and an increase in load weight.- To identify possible improvements with the TOMO Hugglink system.A time study was conducted within the thesis work to make it possible to determine production and time consumption. In the subsequent economic analysis the cost per tone at different transport distances was calculated for two different lorry concepts. Furthermore the effect of a reduction in set-up time and an increase in load weight was calculated.Under current conditions the utilization of the chipper is low and only 29 % of the total system time is occupied by chipping.

Implementering av realtidsvideolänk med MPEG- och wavelet-teknik

At Saab Aerosystems, situated in Linköping Sweden, there is a presentation and manoeuvre simulator simulating the fighter jet JAS-39 Gripen. This flight simulator is called PMSIM. In this thesis we study how to transfer sensor images generated by PMSIM to other simulators or desktop computers. The transmission is band-limited so some kind of image coding must be used. Because of this the greater part of this thesis is concerned with image coding.

Rullarmering - Ett rationellt sätt att armera

This is a degree project performed at Halmstad University in Sweden on the subject carpet ofreinforcement. This project is developed in association with Celsa Steel Service in Halmstad.The purpose of this report is to investigate how much time that can be saved if carpet ofreinforcement is used instead of the traditional way to work with reinforcement and seewhat kind of parameters that is important between the choices. We are also going to seehow this product affects the situation for reinforcement workers from an ergonomic point ofview.Carpet of reinforcement is made by straight reinforcement?s bars that are welded togetherwith steel bands. These rolls are made at a factory with a machine that welds together thebars in determined centre distance, with desired dimensions after the constructionengineers? blueprints.

Kliniskt datainsamlingssystem med beslutsstöd - Användarutredning och gränssnitt för Sahlgrenskas akutintag

 Extra high requirements are made on all systems in health care that they are functional and usable,´something, however, that is not always the case. At Emergency Admissions at Sahlgrenska University´Hospital many systems are in use at the same time and it happens that much overhead is caused by having to fill in the same information in different places. In addition, data that is gathered is to a large extent saved in free text format, which means that it cannot be used in a larger context such as research, quality control or for decision support. Data is saved in the patient file only for the treatment process of the individual patient.A data collecting system with decision support functionality could be a first step towards reducing Emergency Admissions? costs and patients? waiting times by providing a structured method of data collection.

Adaptiv varvtalsstyrning vid användning av en lastbils kraftuttag

Med ett växande fokus på ett långsiktigt hållbart samhälle som tar ansvar för miljön strävar fordonstillverkare efter att sänka energiförbrukningen på sina fordon. Detta arbete behandlar hur man kan sänka bränsleförbrukningen för lastbilar med påbyggnader. En påbyggnad kan t.ex. vara en kran, en lastväxlare eller en betongpump. En metod för att sänka energiförbrukningen är att sänka det varvtal som lastbilens dieselmotor arbetar vid.

Realisering av returer vid rundvirkestransport med lastbil : hinder, möjligheter, vinster och vinstdelning

Holmen Skog, region Norrköping, is located in an area with good potential for backhauling because a large number of geographically scattered mills. However, despite these factors there are many difficulties preventing the realization of this potential. The purposes of this study were twofold. First, from a hauling contractor perspective, to calculate backhauling profits and suggest a profit sharing scheme. Second, to identify and quantify obstacles and possibilities for realization of backhauls.The study required the use of three different types of methods.

Leveransproblem : Ett problem vid strukturerad produktion

When building large buildings, such as compartment buildings, there is a number of deliveries arriving on the construction site daily. In order to receive these deliveries without disturbing the rest of the work going on JM often books a fixed unloading time. When doing that they can be prepared when the delivery arrives. Making sure there is a suitable unloading area, someone to meet the delivery and when needed proper machines, such as a tractor or a crane, to help unload bigger deliveries. The person receiving the delivery is supposed to make an acceptance control where they check the delivered goods making sure nothing has been damaged in transport and that they have received what they were supposed to receive.

Verktyg för värdering av miljöpåverkan vid investeringar i det svenska elstamnätet

During the period 2009-2013, investments in the Swedish national grid increase by a factor of ten compared to previous years. In order to fulfil their mission to manage the national grid in a safe, efficient and environmentally sound way, Svenska Kraftnät (Swedish National Grid) needs to take all these perspectives into account while planning new investments. To compare and relate perspectives of technology, economy and environment the same yard stick must be used. That yard stick is commonly money. A problem arises however as environmental issues are difficult to price.The purpose of this master?s degree project was to develop a tool for evaluation of environmental impact related to investments in the Swedish national grid.

<- Föregående sida 4 Nästa sida ->