Materialspill i byggnadsproduktionen : Waste of Material in the Construction Industry

This report deals with issues related to construction waste. Building material that has not been built into the project is defined as construction waste. Cost of construction waste amounts to 4-12 % of the total cost of the project. Moreover, cost of construction waste is 1-3 % of the production cost. The aim of this study is to increase knowledge about the main causes of waste within the construction industry.

Akuta effekter av assisterade hopp på kvinnliga idrottares hoppförmåga

Vertical jumping ability is an essential skill in many sports. The aim of this study wasto investigate the acute effects of assisted jumps on subsequent countermovementjump (CMJ) performance by female athletes. Nine healthy, trained female subjectsvolunteered to participate in the study. In a randomized order, they performed oneregular warm up protocol before testing their CMJ baseline value, and one warm upprotocol with an addition of five assisted jumps at 30% body weight reduction beforeanother CMJ test. Elastic cords attached to an overhead pulley system and to aharness around the subjects' upper body were used to reduce the body weight.Significant improvements were noted in jump height, 2.3 cm (7%), positive forceimpulse, 4.7 Ns (2%), vertical take off velocity, 0.1 m/s (3%), countermovement time,0.1 s (12%) and breaking time, 0.1 s (14%), p.

Tilläggsisolering - lönsamt enligt en livscykelkostnadsmodell?

It is found that the properties of the record years of 1965-1975 is leaking a lot of energy andthese properties are facing a major energy efficiency. From the energy aspect, the facade isafflicted with poor thermal insulation which is a big problem. To address this problem addinginsulation is a good alternative to reduce overall energy consumption of a building. Thewindows on these buildings are also a problem from the energy point of view. Therefore,there are many reasons considered for energy upgrading.

Passivhus - lönsamt eller ej? : En jämförelse mellan ett passivhus och ett konventionellt hus

As a result of increased energy prices more and more energy-efficient homes are coveted. An energy-efficient alternative is passive houses, which is characterized by an extremely well insulated building envelope that recovers the heat without the use of radiators or under floor heating. But a passive house requires a higher investment cost than a conventional building project, since it will require more construction materials, training of construction workers, greater land area, and long construction period. But the lower operating cost expects to pay back the higher cost of investment. We therefore question how profitable a passive house is in relation to houses built according to modern conventional building techniques.The aim of our study is to investigate the viability of passive houses compared to convent­ional houses.

Färsk ved till Hallstaviks pappersbruk :

Hallstaviks papermill is an industry plant within Holmen Paper. Hallstavik is a mechanical mill and produce newspaper and journal paper. During year 2000, Hallstavik used approximate 1.200 m3f spruce, either as logs or chips from sawmills. Due to that the production is running continuously the mill also needs raw material at the same rate. At some periods the supply of raw material cannot keep up pace.

Lagerkostnadsarbete i teori och praktik: En fallstudie av lagerkostnader på ett sågverksföretag

This thesis investigates how inventory management is practiced at a Swedish sawmill company, how practice differs from theory in this field and how the company could make more use of this theory. To do this we have performed a study on relevant literature and compared our findings with a field study on Moelven Valåsen AB. Our analysis shows that a large gap between theory and practice exists. We identify several reasons to this, including some sector specific problems when calculating cost rate for timber inventories. Suggestions on solutions to these problems and an example of how a cost rate can be estimated with relatively simple means are presented.

Logistiska lösningar för en lönsam byggprocess

This is a study, the purpose of which is to investigate how the construction company Sefab Bygg AB is able to increase its profitability and render a more efficient production process through logistic solutions. The study is made during one of Sefab´s present projects. The project includes sanitary renovation of 650 apartments in the co-operative Opalen in Norrköping.To find out whether changes of logistic routines are profitable or not, it?s necessary to evaluate the total cost of the changes. A total cost analysis is a mapping of all the costs for a particular material, on one hand for the present situation and on the other after the change.

Traktstorlek före och efter omarrondering i Dalarnas län -frågor kring Lantmäteriets båtnadsberäkning

Land consolidation is a major problem in many countries in Europe. In Sweden, mainly the state of Dalarna, there is a strong consolidation of forestland, probably the strongest in all of Europe. The consolidation is a big obstacle for forest management and ownership questions due to the often long and narrow strips of land. One of the main reasons for land consolidation in Dalarna results from the heritage procedure, were land is divided between all of the inheritors. To improve the consolidation large surveys in the consolidated villages in Dalarna are carried out. Many laws have to be followed due to the survey.

Nyckeltal för ekologiska fotavtryck för stommar i flerbostadshus

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Logistik för stråbränsle :

Summary Today energy prices are rising. As a result biomass fuel is getting more and more interesting. Wood chips is very popular, but also straw from grain production is on the table. Lunds Energi AB project a combined power and heating plant in Örtofta out of Lund. Wood chips is meant to be the main energy source, complemented by straw. In this thesis the transportation of straw for fuel is studied.

It is easier to swallow an elephant in pieces. A way of measuring flexibility and quality. A study of DAS.

Upon marketing the system in Europe and the USA cost savings generated from reduced work force have been prevailing. Since the cost of labour is much lower in the Asia Pacific region other factors have to be stressed. The parameters of flexibility and quality assurance may however cover any initial investment in a production system. Our purpose is to value flexibility and quality in a manufacturing context, applied to DAS, in order to use it in investment calculations. In order to make an adequate estimation of different companies, due to problems associated with acquiring correct figures, the Key Success Factors needs to be examined so that the gathering of numbers can be conducted with more focus.

LCC-analys av FTX-system : En jämförelse av centralt- och lägenhetsplacerat

This report is the result of a thesis conducted at the consulting firm Bjerking AB andis the final part of the Bachelor Programme in Construction Engineering at Universityof Uppsala. The work aims to investigate the costs and how the choice of ventilationsystem affects building projects during a long-term period. This report covers costssuch as investment, maintenance and energy but also how they affect residents andbuilders. Building regulations for energy consumption are expected to be tougher;therefore a comparison of two different heat recovery ventilation systems(HRV-system) was made. One system is based on a centrally placed unit that coversthe whole buildings ventilation through vertical shafts.

Beräkning av optimal batchstorlek på gavelspikningslinjer hos Vida Packaging i Hestra :

This final thesis aim to create a support that can decrease the uncertainty when planning the cable drum flanges lines that produces cable drums in the interval 100 to 320cm in diameter at Vida Packaging in Hestra. The purpose attains through finding an optimal batch size that minimizes the total storage cost and order prime cost, without degenerate delivery capacity to the customer. Through survey the sale and stock balance development during 2005 and 2006 for cable drums in Hestra and give alternative suggestions how to plan the production after installing a new cable drum flanges line. The study also explores different ways of working during product change in existing nailing line, to minimize the order prime cost. Vida Packaging in Hestra is a part of the Vida group, which is Sweden?s largest privately owned sawmill group with seven sawmills placed all around southern Sweden.

FN och EU ? två aktörer inom det konfliktförebyggande området - en studie av FN och EU: s konfliktförebyggande åtgärder i Makedonien

Conflict prevention is a term which has gained much influence during the last decades. To prevent conflicts from occuring have both humanitarian and economic incentives as the cost for war are much greater than the cost of acting preventive. To act in this matter has been regarded a priority for the United Nations during several years, and the European Union have also expressed a wish of playing a more active part. The essay compares the actions taken by the international organisations in Macedonia, a country which headed toward a violent conflict. The UN acted through the mission UNPREDEP and the EU through the mission of Concordia.

Byggkostnader inom mjölkproduktionen - jämförelse av olika stallstorlekar och byggnadstekniska utföranden

Investment costs for eight different type housing systems for dairy cows has been calculated in order to compare the building costs as a function of herd size, shelter type and automatization. A commercial calculation programme for building was used and complemented with prices of equipments specific for dairy cow building. Herd sizes were 120, 250 and 400 cows. The milking equipments were automatic milking system (AMS), parallel parlour with 32 stalls (2x16) and rotary parlour with 24 stalls. Shelter was either insulated equipped with automatic cable driven scrapers on solid alleys, automatic feed wagon on rails, or uninsulated with manual manure handling and a tractor driven mobile mixer wagon on a drive-through feeding table. Building cost per cow or per kg milk was calculated using an average life time and 6 % interest rate and annual milk yield is 9 500 kg/cow and year. Structure effect 3-4 % higher for an insulated structure than in an uninsulated for 400 and 120 herd respectively. This is much lower compared to what is normally argued.