Sökresultat:
416 Uppsatser om Optimering v värmeåtervinning - Sida 16 av 28
Optimering av driftläggningar i Fortums nät
Future emission legislation puts great emphasis on increasing the efficiency of the engine, thereby reducing fuel consumption. The tribological contact between cylinder liner and piston ring is where an great amount of energy is lost due to friction, and by reducing these losses an reduction in fuel consumption can be achieved.The aim of this thesis was to evaluate the tested piston ring coatings against a plasma sprayed cylinder liner and rank these combinations of materials for friction and wear resistance. The coatings that were tested was Cr + Al2O3, (Al,Cr)N, two types of CrN and WC / C.The experimental tests were performed with a so-called pin-plate, where used oil with addition of an acidic mixture of sulfuric and nitric acid to mimic the acidic condensate formed when exhausts recirculate, were added with a continuous flow. The results were then analyzed by weighing, studies by optical microscopy and scanning electron microscopy (SEM) and profile measurements.The results from each material combination were that the plasma coated cylinder liner wears too aggressively in order to yield a ranking of the piston ring coatings based on the parameters of friction and wear resistance. It is therefore proposed that an alternative coating on the cylinder liner should be developed, lacking the large abrasive wear on piston rings and that can withstand the corrosive environment resulting in engines equipped with EGR.
Höghöjdsanpassning av BvS10 : Konceptstudie för optimering av överladdningssystem
This report relate a concept study that consider a number of different proposals to improve the overcharging system in BAE Systems Ha?gglunds tracked vehicle series BvS10, to maintain sealevel power at extreme altitude.At high altitude the power losses beacuase of the air density that decreases, which results in less fuel can be burned. The decreasing of air density also gives rise to fatigue failure of the turbocharger unless power is reduced.The proposals shall be as required by BAE Systems Ha?gglunds economically sustainable and defensible from a packing perspective. That means the selected solution must have a reasonable price tag and at the same time a minimal impact on adjacent components.The basis for this thesis is based on benchmarking of both the auto industry as the flight industry, to find inspiration and tips for improvement.Some of the concepts have after gathering facts and calculations been excluded while other solutions has been considered as workable and thus interesting for BAE Systems Ha?gglunds.Initially the current turbochargingsystem was analyzed in order to determine the starting point and thus be able to fix the current problems surrounding high altitude driving.
Vad motiverar strokepatienten?
Stroke är en av vår tids stora folksjukdomar och medför i regel en plötslig och omskakande förändring både för patienten själv samt för närstående. Rehabiliteringen efter en stroke innebär återuppbyggnad och anpassning av fysiska, sociala samt emotionella aspekter av individens liv. Sjuksköterskans förmåga att motivera patienten är grundläggande för optimering av stroke-patientens rehabiliteringsmöjligheter. Syftet med föreliggande studie var att kartlägga strokepatientens motivationsfaktorer till rehabilitering samt undersöka hur sjuksköterskan använder sig av motivation i omvårdnads- och rehabiliterings-arbetet. För att undersöka ämnet utfördes en litteraturstudie baserad på kvalitativa forskningsrapporter.
Optimering av påstorkning : Från behov till färdig konstruktion
This thesis describes the redesign ofequipment designed for drying bags thatis used in Fresenius Kabis´manufacturing of their nutritionmedicine in Uppsala. The need of thistask arise during the start of thedevelopment of a new packaging line werethis equipment were meant to be used. Anevaluation of the bagdryers capacity andcapability was necessary.The work started with gathering ofinformation from suppliers of the usedcomponents and from the responsibleengineers for this equipment. Aneducation to learn how the equipmentworked and how to operate it were taken.That was followed by the creation of astudy plan were the tests were plannedto test different parameters effect onthe drying result and to see if thebagdryer managed to handle the bags ofthe correct format in the pace that theequipment should be designed for.The test results detected a need ofdesigning a unit with a function thatholds the bags in place while passingthrough the dryer in order to attainhigh quality results. The results werelater used for optimization of thedesign.
Responsiv hantering av bilder : Vad är en bästa lösning för responsiv hantering av bilder på olika enheter?
Med responsiv webbdesign skapas en design som sedan dynamiskt anpassar sig till olika enheters skärmbredder, utan att specifika designer måste skapas för att få en anpassad layout till varje specifik enhet. De senaste åren har användandet av mobila enheter för surf på webben ökat och kraven som ställs på det mobila surfandet ökar med detta. Ett problem som uppstår med mobila enheter är att de trots sina små skärmar, använder samma högupplösta bilder som skapats för större skärmar. Detta medför att, trots omskalning av bilder för att responsivt anpassa bilden till enheten, så laddas en onödigt stor bild ned till enheten. Detta kan exempelvis p.g.a.
Optimering av antal flygplanssäten : Modellering med avseende på yta, intäkt och efterfrågan
Vid införandet av säten är det viktigt att ta hänsyn till passagerarintensiteten, det vill säga hur tätt sätena ligger. Den kritiska mätvariabeln står för avståndet mellan en punkt på ett säte och samma punkt på nästa säte. Mätvariabler som har små värden, det vill säga korta avstånd betyder fler rader och därmed högre vinst. Överblivet utrymme är ett dyrt slöseri då skillnad mellan vinst och förlust för en viss flygning kan vara så liten som mindre än en kostnad för ett säte.Syftet med detta arbete är att ta fram en matematisk modell som hittar den optimala sätesfördelningen mellan klasserna i ett flygplan. Den modell som skall ställas upp ska maximera intäkterna och ytanvändningen för ett flygbolag samt möta efterfrågan.
Optimering av ett kösystem på IKEA Kungens Kurva
Detta arbete har undersökt hur många betjäningsstationer avdelningen Byten och Återköp på IKEA Kungens Kurva behöver för att nå en förväntad kötid inom nio minuter. Arbetet är uppdelat i en kvantitativ del samt en kvalitativ del.Den kvantitativa delen av arbetet besvarade den matematiska frågeställningen där kön var modellerad enligt ett M|M|c-�system med Poissonfördelade ankomstintensiteter samt exponentialfördelade betjäningsintensiteter. Resultatet var baserat på data från januari 2015. I första hand reglerades antal betjäningsstationer för att nå en förväntad kötid under nio minuter. I andra hand reglerades betjäningsintensiteten, om kötiden ännu inte uppnåtts. Den kvalitativa delen av arbetet baserades på ett teoretiskt ramverk gällande Customer Relationship Management samt intervjuer med Avdelningschefen och Kundrelationschefen på IKEA Kungens Kurva. Arbetets slutsats baserades på resultat från både den kvantitativa och den kvalitativa delen av arbetet.Det matematiska resultatet presenterar antalet öppna betjäningsstationer som krävdes timme för timme under vardagar respektive helger för att nå en förväntad kötid under nio minuter. Slutsatsen är att i de fall där den förväntade kötiden var strax över nio minuter kommer detta inte påverka kundrelationen, så länge en god betjäning ges, medan det matematiska resultatet bör tillämpas om den förväntade kötiden är långt över nio minuter. .
Visuell planering enligt Lean : Optimering av samordning i syfte att höjakvaliteten i grundläggningsprojekt
Construction production always contains different disciplines whose priorities andinterests can be very diverse. Good communication and coordination are essential tominimize misunderstandings and achieve good quality in the end result. This makesplanning a central part of the production management. In a world where conditionscan change as often as daily, being well prepared increases the opportunities to stayflexible and decrease negative effects of the changes.This study has been done in association with Skanska Foundations district North inStockholm in order to investigate how visual planning can be used in the productionmanagement to optimize the coordination and the quality.The history of Lean started at Toyota, but the concept are now spread over theworld and are used wide outside of the car industry nowadays. What?s challengingabout Lean in foundation projects is to embrace a long-term perspective and invest insolutions that are profitable in the longer term, instead of solve problems by onlytreating the symptoms.A holistic perspective is crucial in order to truly understand Lean.
Optimering av OTEC-system
Ocean Thermal Energy Conversion, OTEC, is a sustainable energy conversion technology that is not yet commercialized. OTEC is a technology that utilizes the temperature difference in oceans between the warm surface water and the cold water at 1 000 m depth to run a Rankine Cycle. This technology can produce electricity and provide synergies like fresh water, air conditioning and aquaculture. A simulation program for three alternative OTEC systems has been created in order to decide which OTEC system is most profitable; closed, open or hybrid system. In this simulation a production cost analysis is performed in order to investigate and decide which one of the three systems that has the lowest production cost. The production cost analysis also analyzes if the profitability is affected by the size of the facility. After these analyzes, the most profitable of the three different OTEC-systems is expanded by an installation of solar collectors in order to see if the thermal efficiency is improved. The result shows that the most profitable system varies with the size of the facility.
Optimering av kemikaliedosering i Rosviks avloppsverk
Vid rening av avloppsvatten använder man ofta olika typer av fällningskemikalier för att rena vattnet på bland annat fosfor. Innan man definitivt väljer fällningskemikalie bör man alltid genomföra fällningsförsök för att fastställa om man kan uppå önskade resultat. Helst ska kemikalieåtgång och kostnad bli så låga som möjligt. Efter småskaleförsöken är det även bra att testa i full skala för att se om de resultat som uppnåtts i labbet även uppnås i reningsverket. Rosviks reningsverk är ett av många små reningsverk i Piteå kommun och är dimensionerat för att ta emot avloppsvatten från ungefär 2 100 personer.
Förenkling av det dagliga underhållet hos Electrolux professionella torktumlare
Projektet initierades genom ett önskemål ifrån Electrolux om en förenklad luddhantering hos dess torktumlare för den professionella marknaden. Detta då den nuvarande lösningen erfordrar underhåll med korta intervaller och oergonomiska och otympliga moment för användaren. Syftet med projektet var således att ta fram en konceptlösning, vilken förenklar det dagliga underhållet av luddhanteringen i jämförelse med den nuvarande konstruktionen.
Metodologin som använts under projekts gång har genomsyras av tre
produktutvecklingsmetodologier, vilka författarna kommit i kontakt med under deras studietid på högskolan i Halmstad. Då inget konstruktionsprojekt är det andra likt har författarna valt att arbeta efter ett
egenkomponerat angreppssätt, specifikt för just för detta examensarbete. Författarna har under projektet fortlöpande valt ut de faser, steg och verktyg från ovanstående metodologier, som ansetts bäst passa in i det ögonblicket för att komma fram till ett så bra resultat som möjligt.
En algoritm för linjära optimeringsproblem
Denna uppsats behandlar en algoritm som löser linjära optimeringsproblem. Algoritmen bygger på en liknande idé som simplexalgoritmen men i denna kan startvärdet även vara en punkt inom tillåtet område eller på randen till detta område. Det behöver inte nödvändigtvis vara en hörnpunkt, vilket simplexalgoritmen kräver. Under algoritmens gång kommer iterationsvärdena att ligga på randen till det tillåtna området för att slutligen hamna i ett hörn. Därefter går iterationsvärdena från hörn till hörn tills slutligen optimum har nåtts.
Distributionsekonomisk optimering av dagligvaruhandelns lokalisering : förstudie till ett forskningsprojekt
The structure and performance of grocery distribution in Sweden has changed profoundly since the second world war. Increasing access and usage of the private car, in combination with an accommodating town planning has enhanced the exploitation of scale economies within distribution firms. There is, however, some ambiguity concerning the overall efficiency of the distribution system when the costs associated with travelling and purchasing performed by households are treated as an integrated part of the total distribution cost function. The purpose of this master thesis is to develop the foundation of a spatial optimisation model, which defines the most efficient distribution system. The underlying idea is that the optimal localisation and size of grocery stores is a function of economies of scale within the firms weighed against distributions costs within the households, such as transportation costs.
Simulering och offline programmering av transfersystem
Verktygsavdelningen inom Gestamp Hardtech har en lång erfarenhet av utveckling, konstruktion och tillverkning av prototyp- och serieverktyg som sedan används i produktion i Luleå, Haynrode Tyskland, Mason USA och Kunshan Kina. Arbetet kännetecknas av ett tvärfunktionellt tänkande vilket medger ett minimum av ledtid genom användning av gällande datasimuleringar, utveckling,konstruktion samt tillverkning. När en simulering utförs kan olika produktionsstrategier utredas och ger även möjlighet till att se konsekvenser av konstruktionslösningar på verktyget.mSimulering kan ske på befintlig linje eller innan en investering i en ny produktionslinje ska göras. Genom simulering kan problem som annars leder till störningar i produktionen upptäckas. Resultatet av detta examensarbete är ett verktyg i form av två simuleringsmodeller i CAD-systemet I-DEAS NX12.
Förstudie till flödesackumulering på Astra Tech
Syftet med arbetet var att undersöka möjligheten för optimering av produktflödet. Företagets produkter transporteras på ett transportband till en gemensam process. Det nuvarande flödet till processen är inte optimerat vilket resulterar i att processen körs ineffektivt. Ackumulering av produkter innan processen ska därför undersökas som en lösning till problemet.Fyra olika ackumuleringsförslag har analyserats och jämförts: hängande bansystem, palleteringssystem, depalleteringssystem och kombination av bansystem och palleteringssystem.Förslagen har blivit bedömda och jämförda utifrån följande parametrar: yta, investeringskostnad, flexibilitet, arbetsbelastning, arbetsmiljö och tid. Hängande bansystem fick det högsta snittvärdet och valdes därför för fortsatt analys med stöd av simulering.