Sök:

Sökresultat:

370 Uppsatser om Numerical simulations - Sida 6 av 25

Energihushållning och varsamhet för äldre byggnader : Chefsbostaden i Strömsholm, ett timmerhus från 1900-talets början

This report is the result of a degree project in building engineering, at an advanced level. The project evaluated a building from a technical and historical point of view, and focused on its energy consumption, particularly the energy used for heating. The building in question was a small apartment building in Strömsholm, Sweden. It was made in 1902, from vertical logs, a not so common form of the traditional log house. The goal of the project was to evaluate if the energy consumption could be reduced in accordance with building preservation regulations, that is without damaging any of the building?s cultural or historical values.The building was surveyed with the help of archive and literature studies, interviews and inspections.

Energieffektivisering av flerbostadshus från rekordåren. Analys av åtgärder med fokus på ytterväggar

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Kundnytta vid grusvägsunderhåll ? Trafikantens syn på drift och underhåll av grusvägar i driftområde Trollhättan

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Förslag till ny multihall i Mölndal. Användning av BIM vid projektering i tidiga skeden

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Effektivisering i byggproduktionen - Studier av arbete från ställningar, liftar och arbetsplattformar

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Projektledning inom affärsutveckling för fastigheter: En studie om idé- och identifieringsfasen bland fastighetsföretag

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Kvantifiering av föroreningstillskott från dagvatten inom skyddsområdet för Göta Älv : en simuleringsstudie med modellen SEWSYS

The river Göta Älv reaches between Vänern and Gothenburg and is the main raw water source for Gothenburg that supplies about 700 000 people with water. To protect and maintain a high water quality, continuously samples and water analyses are made throughout the river. In 1998 a protection area was founded between surte and Lärjeholm where the raw water intake is. This was made to increase the awareness of the importance to protect the water. However, there is a lot of contribution of untreated stormwater to Göta Älv within the protection area.Göteborg Water and Sewage Works commissioned this thesis where two areas, Tagene industrial area and Kärra residential area, with untreated stormwater outlets within the protection area are studied.

Hårdhetsvariation i grundvatten längs Badelundaåsen mellan Leksand och Avesta

Water hardness indicates the concentration of calcium and magnesium ions in water. Water with high concentrations of these ions is described as hard water and water with low concentrations is described as soft water. Water that is too hard or too soft can lead to technical and economical problems. In collaboration with Midvatten AB, groundwater hardness in the Badelunda esker between Leksand and Avesta has been mapped, and an attempt has been made to explain the variations. For this purpose, different GIS programs, such as ArcView, ArcInfo, IDIRISI, and one geochemical modelling program, PHREEQC, has been used.

Problem med att få besiktningsanmärkningar åtgärdade. Felaktiga inställningar och attityder fördyrar våra byggprojekt

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Arbetsgång för optimering av antal jord-bergsonderingar - med avseende på bergytans nivå inom ett område

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Fluidrörelse- och värmetransportsmodellering i götugn

The purpose of this thesis for Sapa Heat Transfer is to examine a furnace in which aluminium is pre-heated before hot rolling. The project is modeled in a computer environment in which the air flow in the furnace and the heat transfer to the aluminium solids are included. The computer environment and its governing equations, as well as boundary conditions and generalizations, are presented and explained.The simulations are based on two models. The first model has an asymmetric solid placement, which is how it looks in today's ovens. It is validated against collected data.

Kollektivtrafikanalys av Frihamnen Göteborg. En studie av olika utbyggnadsscenarier och dess transportbehov vid en färdig utbyggnad av Frihamnen år 2040

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Arbetsberedningar i syfte att öka delaktighet och tillvaratagande av kompetens bland yrkesarbetare -Utvärdering av ett nytt arbetssätt för Skanska Region Hus Göteborg

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Modellering och simulering av det evaporativa bränslesystemet i en personbil

This thesis work has been performed at the department of diagnosis and dependability at Volvo Car Company, Torslanda. The background of this project is based on interest in ascertaining how different factors possibly can affect a diagnosis method, which has been developed to find leaks in the fuel tank and evaporation system. According to the OBD II requirements leaks with an orifice diameter larger or equal to 0,5 mm, must be detected. The idea of the diagnosis method is to create an over pressure in the system with an air-pump. The current through the pump is measured and correlates to the power consumed by the pump.

TILLFÄLLIGA EFFEKTTOPPAR I FJÄRRVÄRMEN : Kan man med hjälp av lagrad värme undvika att de uppstår i betonghus?

Climate and environmental issues is now high on the agenda. We live in a generation that must try to solve some major environmental problems. Buildings and habitations account for approximately 40 % of Sweden's total energy today. To reduce this figure, as needed, more research in the field of energy efficiency is required.This thesis concerns the heating of buildings. The load on district heating is heavy during certain times of the day.

<- Föregående sida 6 Nästa sida ->