Sök:

Sökresultat:

3613 Uppsatser om National building - Sida 6 av 241

Församlingshem, Bankeryd

This report presents a thesis project at the School of Engineering, Jo?nko?pingUniversity, where the task has been to develop a proposal for a parish communitycentre for the Swedish church?s parish community in Bankeryd.Background1 st of November in 2004 the parish in Bankeryd appointed a special commissionof inquiry called Framtidsgruppen (Future Group), to analyse the parishcommunity?s different activities during the past 5 years and analyse the futureactivities and needs for the upcoming 5-10 years. This analysis would underlie theneeds of building a new centre for the parish community.Implementation, results and conclusionThe main focal points which this report is concentrated on has been to develop abuilding that is well suited for the activities, well adjusted for disabled persons andthe building shall be appealing in an architectural point of view.Based on the information provided from the parish community, studies ofliterature, reference objects and discussions with the contact person at the parishcommunity and the instructor of this project, the programming has beendeveloped. The building?s programming has been the source for the continuedwork with floor plans and the building design..

Go Down Arts Centre : Nairobi, Kenya

The Go Down Arts Centre is a proposal for a new building to an existing organisation in Nairobi, Kenya. The proposal relates to the scale of the city by making a statement on a future urban path, and by welcoming the city in to the building. The proposal houses both activities affiliated to Go Down, such as studios and rehersal rooms, as well as opportunities for the visitor to meet and interact with the culture produced at Go Down, both in formal and informal settings. The building is closed to its surroundings, apart from a grand entrance towards the urban path. There, the city passes through the building to an inner courtyard, where the communication to all the rooms and activities takes place.

Nyutveckling av bakdörrar vid Sapa Building System AB

Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.

Värdering för markåtkomst vid järnvägs- och motorvägsbyggnation : en fallstudie av intrångsvärdering i området mellan Örebro och Arboga

The purpose of this work has been to investigate if there are any differences in the valuation process at infringements when highway and railway are built. The work has mainly been concentrated on the negotiation process in which The National Railway Department (Banverket) and The National Road Administration (Vägverket) try to get agreements with the land owners. The agreement includes compensation for infringement effects that affects the landowner?s property. The National Road Department uses the road law (Väglagen) when a highway shall be built.

Klimatskärmens funktion : En jämförande analys av projekterade nybyggnationer i Östra Salabacke, ur ett energi- samt fuktperspektiv

The design of the building envelope affects the energy consumption of a building. As the energy requirements for new buildings are becoming more demanding, the performance of the building envelope must be improved. Energy efficiency and durability are important attributes to consider.This report includes investigations of the building envelope, moisture and passive solar energy. It is based on the analysis of two different buildings with different designs. These buildings stand as reference for two of the companies who are working on a new, climate smart, residential area in Uppsala, Sweden.Studies and analyses on energy consumption and moisture transportation were made.

Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad

The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling

The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..

Mer hyresrätter åt folket! En studie om Hallands hyresbostadsmarknad. : - Att skapa lönsamhet för hyresrätter

A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.

Byggnadsminnesförklaring : ett långsiktig hållbart skydd?

There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.

Nationella prov - stöd eller hot? : Några gymnasielärares uppfattning om de nationella provens betydelse

The purpose of this study is to analyse the significance of the national assessment in highschool education, including what the teachers express about the new instructions currently coming from the Swedish National Agency of Education, concerning a more central control of grading the national assessments. This study also covers the teachers individual responsibility when it comes to grading the national assessments. The purpose of the national assessment is to secure that grading and the education level in the country is equal. This is a qualitative study useing the method of a group discussion intervju (focusgroup intervju). Five highschool teachers took part in the discussion with questions that had been decided beforehand.

Energiåtgång under tillverkning och produktion av byggnadskomponenter

This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.

På väg mot ett hållbart resande? : En fallstudie kring den lokala kollektivtrafiken i Umeå tätort

Sustainability and the traffics impact on the environment have become increasingly central within spatial planning. For many years, planning has been focusing on building new roads - this has resulted in increased use of automobiles, which many believe is unsustainable in the longer term. Therefore, authorities at national, regional and local level want to increase the use of alternative transport modes ? such as walking, cycling and traveling by bus.The thesis intends to study if the Municipality of Umeå?s policies for sustainable development have led to an increased use of public transportation. The use of public transport in Umeå is also compared with developments at national level, in order to see if there are differences in the level and trend.

Energi och klimatanalys O-huset på Campus i Halmstad

AbstractThe indoor environment affects the human performance. Noise pollution, poor lightning and coloring are some of the factors that affect our work performance. The human is also affected by the air change and temperature, these factors are in most buildings possible to adjust and through this make economic savings. To find out about the indoor environment in the O-building a questionnaire was handed out, measurements/surveys and an interview was also made. 108 questionnaires where handed out to employees and students.

Hotell- Stockholms skärgård

The hotel is located on Skatholmen in the archipelago of Stockholm, Värmdö county. The hotel building has an open structure characterized by hospitality and the nature outside. The rooms have stunning views of the island landscape and lush forest. With biodiversity and valuable nature in mind, the building has been designed with a structure that should not be too intrusive in the surrounding landscape. The building is meant to blend into the dark silhouette of the island and to give a light footprint on the topography of the landscape.The use of well-chosen materials and similar design, both in plan and facade, creates a consistent building despite the building's somewhat playful expression.

<- Föregående sida 6 Nästa sida ->