Sökresultat:
2413 Uppsatser om National Grid - Sida 4 av 161
Värdering av innemiljön i Hamnhuset med metoden EcoEffect
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Motivationsbefrämjande åtgärder: En studie på Peab ur ett arbetsledarperspektiv
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Produktivitetsarbete i anläggningsproduktion ? en fallstudie av ett entreprenadföretags möjligheter och hinder
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Fuktsäkerhetsprojektering ? från ankommande virke till nyckelfärdigt hus
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Solhus i Bahrain Kylning av enfamiljshus med el från solceller
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Betongens yta: porbildning vid gjutning av brokantbalkar med lutande yttersida
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Brokonstruktion i Tibet- Ett led i att förbättra infrastrukturen i området Sichuan
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Energisnålt stenhus : Förslag på utformning av enfamiljsvilla i Vejbystrand
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Inträngning av Silica sol i berg. Geologins inverkan på injekteringsresultatet
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Passiva filtersystem för rening av lakvatten från avfallsupplag
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Undersökning av kunskaps- och informationsflöden i Passivhusprojekt: med avseende på lufttäthet
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Flytta hus. En studie av metodval för tre flyttobjekt i Kiruna stad
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Identifiering av onödigt arbete. En studie vid två specifika projekt
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Analys av energilagringssystem portfolio för Volvo hybrid konstruktionsmaskiner
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Ny stamstation i Yttermalung för anslutning av vindkraft : Nätstudie av olika utföranden i normal- och reservdrift
Since 2004, wind power has had the largest installation of new capacity compared to other energy sources in Sweden. Accommodating new wind power may require strengthening or rebuilding of the existing grid in areas where the grid is already loaded to maximum capacity. This master thesis examine the possibility of a new 400/130 kV substation in Yttermalung, Sweden, with a connection to the two neighboring regional grids in Dalarna and Värmland owned by Fortum. This substation would provide a new connection point to the Swedish transmission system as well as an interconnection of the two, currently separated, regional grids. Different expansion scenarios where a substation with and without series compensation or a phase shifting transformer (PST) to control active power flow were studied.