Sök:

Sökresultat:

5259 Uppsatser om Motor Control and Perception (DAMP) Komplicerat lärande - Sida 23 av 351

Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

MotivationsbefrÀmjande ÄtgÀrder - En studie pÄ Peab ur ett arbetsledarperspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utvecklingen av det colombianska fackföreningsavtalet, Contrato Sindical - en utmaning för den colombianska fackföreningsrörelsen.

Syftet med studien var att ta reda pa? hur man kan fra?mja lek fo?r barn med autistiska symptom som bor pa? korttidsboenden. En kvalitativ intervjuunderso?kning gjordes med sex deltagare och analyserades sedan genom en tolkande fenomenologisk analys (IPA). Fyra huvudteman med tillho?rande tva? underteman var valdes ut.

Patient och brottsoffer. : Om hÀlso- och sjukvÄrdens rÀttsliga möjligheter att lÀmna ut uppgifter om enskilda till polisen vid misstanke om brott.

Syftet med studien var att ta reda pa? hur man kan fra?mja lek fo?r barn med autistiska symptom som bor pa? korttidsboenden. En kvalitativ intervjuunderso?kning gjordes med sex deltagare och analyserades sedan genom en tolkande fenomenologisk analys (IPA). Fyra huvudteman med tillho?rande tva? underteman var valdes ut.

Modeling of a step motor for position feedback in a climate system

Med detta examensarbete vill vi belysa problematiken runt tredimensionell fastighetsbildning. Som objekt har vi anvÀnt oss av ett bergrum pÄ Liljeholmskajen i Stockholm..

Beskrivning av fel och brister pÄ brorÀcken och förslag till förebyggande ÄtgÀrder avseende tillverkning och montering

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Återladdning av borrhĂ„l i BorĂ„s Djurpark. En studie om möjligheter att kombinera solfĂ„ngare med ett befintligt bergvĂ€rmesystem

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

SÀttningsberÀkningar I kalkcementpelarförstÀrkningar. JÀmförelse mellan mÀtningar och berÀkningar enligt AllmÀn teknisk beskrivning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

YttÀckande nivÄkontroll vid byggnation av vÀgar - en analys av mÀtutrustning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utveckling av leverantörsutvÀrderingar i stora byggföretag -En fallstudie hos PEAB

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Att fÀrdas i symbios : ett gÄng -och cykelstrÄk anpassat efter trafikanternas rörelsemönster och behov

The aim of this paper is to examine the layout of public spaces and its effect on human behavior with focus on the relation between pedestrians and cyclists movement patterns in a specific path. The study emanates from the security aspect of pedestrians and cyclists, and builds upon previous theories and empirical studies about perception, security, information design, environmental psychology and behavior. The result shows that individual behavior and movement pattern differs with age, purpose, physical- and other conditions, and layout of the surroundings. A design proposal for improved layout of a path and a node between different oncoming paths has been developed to aid the users? needs, where a separation of walkways and bike lanes forms zones of security for the purpose of better orientation and a better flow between the users..

Föroreningstransport med dagvatten - Utveckling av reningsmoduler för modellverktyget Mike Urban SWQ (Storm Water Quality)

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Att balansera Management Control Systems - En fallstudie av ett litet svenskt IT-företag

This thesis studies the concept of balance in the management control systems (MCS) of a small Swedish company within the IT-sector. The aim is to evaluate the importance of balance and dynamics in MCS and investigate which factors affect them. The frameworks used are Simons (1994) four levers of control, and the five-factor model for balance and dynamics by Mundy (2010). The small IT company - the object of the case study - has grown extensively in the last years and needs to develop more formal MCS without losing efficiency and creativity in their fast-moving industry. The case study reveals that balancing MCS is important also in smaller companies with less formal MCS.

<- FöregÄende sida 23 NÀsta sida ->