Sök:

Sökresultat:

1903 Uppsatser om Metal contaminated building - Sida 11 av 127

Kvarteret Domherren: Urban Building : Bostad, kontor, butik & mötesplats

Projektet går ut på att radikalt öppna upp kvarteret. Öppna upp husets bottenplan till allmänheten, skapa en större offentlig plats, en mötesplats, samt tillföra butiker och studentbostäder. Dessutom skall husen kommunicera denna nya tillgänglighet..

Kartläggning av order- och leveransprocessen för höghastighetsseparatorer hos Alfa Laval Tumba AB

The project description is to draw an extension or annex to the existing Nationalmuseum building from 1866.The annex is designed to complement Nationalmusems activities and contain internal and public functions. Artentering the building must not be crossed by public visitors. Art and staff must be able to seamlessly move betweenthe extension and the main building. The new building includes a public study room for scholars working withthe collection of art on paper, workshops, conservation studios, art spaces and warehouses. Additionally, theannex is designed to host a large number of office spaces.With the renovation of Nationalmuseum they intend to open up the today built in south atrium.

BIM för Hållbart Byggande

The purpose of this study is to facilitate sustainable building by the use of BIM. The goal is to determine which aspects of sustainable building, which can be analyzed mainly with BIM tools, but also other aids.The study is based on literature studies and interviews. The literature review examines aspects important for sustainable building by studying environmental certification systems applicable in Sweden, as well as the BIM tools available on the market to analyze these aspects. The literature also includes the concepts of BIM and sustainability in order to provide a clearer view of its meaning. The interviews have brought the study's overall understanding of the industry and guidance on the subject.The results are presented in a table, where the aspects relevant to sustainable building are listed.

Maskinduglighet på planlaserskärare

Lars Höglund AB is one of Scandinavia?s most qualified manufacturers of sheet metal products and provides custom designed products of very detailed precision. One of the main methods of manufacturing is laser cutting. When Lars Höglund AB signed up a new customer, with high demands in tolerances for the products, Lars Höglund AB thought it would be necessary to know the capability of the laser cutting machine. Also the process of how to retrieve this capability was interesting. The capability will be researched for the following elements: Cutting right angles in squares with a corner radius of 1 mmCutting corners which are not right angleCutting of circles with constant radius Measurements were made on 150 pieces of sheet metal details, which had been cut out by the machine.  The data from the measurements where later used to study the capability.

Inventering av förorenad mark på LKAB´s industriområden i Kiruna, Svappavaara och Malmberget :

The county administration asked LKAB to make an inventory of possibly contaminated sites caused by their mining activity. The inventory should be performed according to the MIFO model, a method from SEPA which is used to assess a contaminated site. The first phase involves collection of information through interviews and site inspections and in phase 2 a general survey with field sampling is conducted. LKAB started the work with the first phase of the survey during 2003. During this project the information collected in Phase 1 was evaluated and 16 of the sites were chosen to proceed to MIFO Phase 2 (six sites in Kiruna, and 5 sites respectively in Svappavaara and Malmberget). The sampling of these 16 sites was performed during week 27 2004.

Inventering av förorenad mark på LKAB's industriområden i Kiruna, Svappavaara och Malmberget

The county administration asked LKAB to make an inventory of possibly contaminated sites caused by their mining activity. The inventory should be performed according to the MIFO model, a method from SEPA which is used to assess a contaminated site. The first phase involves collection of information through interviews and site inspections and in phase 2 a general survey with field sampling is conducted.LKAB started the work with the first phase of the survey during 2003. During this project the information collected in Phase 1 was evaluated and 16 of the sites were chosen to proceed to MIFO Phase 2 (six sites in Kiruna, and 5 sites respectively in Svappavaara and Malmberget). The sampling of these 16 sites was performed during week 27 2004.

Grönområde kontra bebyggelse : grönområdenas förändring i Älta, Nacka kommun

This essay shows how natural areas in Älta, a part of Nacka municipality southeast from Stockholm, been changed quantitatively and qualitative as a result of the increased housing construction in the area. Three issues are discussed. Namely: how has Ältas green areas been changed in sizes and quality in line with the settlement's expansion, what is the reason or the reasons to building of different types of accommodations, what has been and is the operators in connection with building of the different types of accommodations?The essay shows that the green areas has been decreased with over 2 km from 1901 to 2000 and in addition to these areas of approximately 1,1km been converted to a planned green structure. Älta has during the years gone through four eras of building types an era of small family houses ? an era of building one million houses on a national scale ? an era of terrace houses ? an era of sporadic building of different housing types (one family houses, pair houses, terrace houses and small blocks of flats).

Att förebygga och undvika fuktskador i byggnader

Efforts to achieve a moisture proof construction process have proved to be considerably complicated, despite the knowledge and awareness that now exists within the moisture field. Materials, documents, templates and checklists are designed to be accessed but are not used anyway. This may be because such effort has not been prioritized and properly requirements have not existed from the commissioner of a building.This report illustrates how the commissioner of a building project can achieve a moisture proof building process by increasing knowledge, moisture proof planning, and implementation of security moisture routines. Proposals are given on how the commissioner of a building project can work to consistently bring a moisture proof building process in all stages. The difficulty with regular moisture proof efforts, the authors believe is mainly due to the following points:      Many different design solutions.      Lack of experience feedback.      Lack of communication.      Financial incentives.      Attitudes.The interviews in the report have conducted with the help of a qualitative analysis, while the survey has been done using a quantitative analytical method.

Posthuset blir hotell En studie av Centralposthuset i Göteborg och dess omvandling

This essay in Art History treats the former Central Post Office in Gothenburg, Sweden, and its recent transformation into a luxury hotel. The magnificent original building in neo-classical style, inaugurated in 1925, has been supplemented by a twelve stories high tower in postmodern style containing hotel rooms and suites, creating a complex architecture. The approach of this essay is that of ?lived architecture?, that is, how people experience and act in relation to the building. It is argued that the history of the building is rewritten in the marketing of the hotel and the management?s concept of creating a comfortable ?mini-world?for its guests.

Standardisering av snöröjningsplan : Instruktioner, råd och tips för snöröjning av tak med stora spännvidder

The Swedish winters 2009/10 and 2010/11 were rich in snow and many roofs collapsed, mainly largespan frames. Investigations were made and the amount of snow was not the primary cause, insteadthere were several other causes. One of these was that in some cases roofs were shoveled in anunfavorable manner which affected the load patterns negatively, so causing the roofs to collapse.Most people lack the knowledge of how shoveling will affect the roof. Had there been an increasedunderstanding regarding shoveling, some roofs could have been prevented from collapsing.Through both qualitative and quantitative research in the form of interviews and calculations thetheoretically best ways to shovel a selection of roof types is presented in the report. The roofstructures covered are 3-compartment, continuous and Gerberspliced metal roof decks.

Tillbyggnad, Nationalmuseum

The project description is to draw an extension or annex to the existing Nationalmuseum building from 1866.The annex is designed to complement Nationalmusems activities and contain internal and public functions. Artentering the building must not be crossed by public visitors. Art and staff must be able to seamlessly move betweenthe extension and the main building. The new building includes a public study room for scholars working withthe collection of art on paper, workshops, conservation studios, art spaces and warehouses. Additionally, theannex is designed to host a large number of office spaces.With the renovation of Nationalmuseum they intend to open up the today built in south atrium.

Vägen till produktionsanpassade arbetsinstruktioner

The purpose of this thesis was to investigate the need of working instructions in Derome Träteknik ?s industrial house-building factories. Furthermore we wanted to determine an appropriate way for developing working instructions adapted to the conditions in a certain production environment. In the construction industry today prefabricated building elements are frequently used. With this come repetitive work tasks that need to be carefully planned.

Glava glasbruk : En undersökning av föroreningar i mark- och vatten samt ansvaret för dessa enligt miljöbalken

The Swedish industrial society has left several areas with contaminated soil and water which today is of danger for the environment and human health. One of these areas with contaminated soil and water is the region where the former Glava glassworks operated during 1859 to 1939. The main object in this study has been to study the responsibility for the contaminations according to the Environmental Code. The method used is a qualitative content analysis of relevant literature to answer the following questions:What types of contaminations can be found in the area of Glava glasswork and what health issues can these cause?What kind of activity has been conducted in the area that have caused the contaminations in soil and water?According to law, what are the responsibilities for the contaminations in soil and water at Glava glassworks?The contamination in the region has been confirmed to originate from the glasswork due to the environmental engineering survey made in the area in 2009.

Implementera BIM i produktionen : Vilka produktionsparamterar krävs i en BIM-modell för att produktionsledare ska kunna tillämpa BIM som verktyg till sina arbetsuppgifter?

Detta examensarbete syftar till att exemplifiera vilka informationsparametrar som är nödvändiga för att Building Information Management på ett bättre sätt ska kunna implementeras i produktionsfasen. För att uppnå detta mål har vi analyserat utvecklingen och nyttjandet av Building Information Management genom tre olika datainsamlingsmetoder; litteraturstudie, observationer och intervjuer.  I detta examensarbete har vi fördjupat oss i för- och nackdelar samt hur Skanska Sverige AB kan tillämpa Building Information Management som hjälpmedel i arbetsberedningar. Denna fördjupning har lett till att vi kan analysera vilka produktionsanpassade informationsparametrar som en produktionsledare behöver i sin tjänsteroll för att dra nytta av Building Information Management.Vi anser att användandet av en BIM-modell kompletterar produktionsledarens ledaregenskaper, vilket gör det lättare för denne att nå fram med informationen till yrkesarbetarna, då visualiseringen underlättar förståelsen inför aktiviteten. I denna rapport kan läsaren ta del av de slutsatser vi kommit fram till..

Bergkyla och bergvärmeutredning för industrilokalen Rödbergsmyran 5 i Umeå, Västerbotten.

Grubbe Ventilation AB is a sheet metal and ventilation company who provides design, installation, service, and repair of ventilation. The company is expanding their business by building a new facility in Umeå, Västerbotten. The property is designed to be used for both office and industrial work.Grubbe Ventelation AB has not yet decided upon wish system which is to be established to provide the building with heating and cooling. The consulting firm Umeå Projekt Team has therefore been asked to investigate the possibilities to invest in geothermal- heating and cooling.If the investigation of a geothermal heating- and cooling system would provide favorable results it would be a very appropriate alternative that provides energy at low costs and are an environmentally friendly option as the energy comes from stored solar energy in the ground is provided by stored solar energy in the ground.The facility ´s heating and cooling consumptions are calculated in the program BV2 and the result indicate a heating demand of 185 000 kWh per year due to thermal transmittance, transmission losses, heating of warm water and a cooling requirement of 5500 kWh.Three different systems of geothermal heating and cooling were tested in the computer program Energy Earth Design. The results show no difference in the dimensioning of the drill hole if merely heating were to be used or both heating and cooling were to be established.

<- Föregående sida 11 Nästa sida ->