Sök:

Sökresultat:

1026 Uppsatser om Medieval residential house - Sida 29 av 69

Om stenar kunde tala : arkeologiska rön och bebyggelsehistorisk kontext av kvarnstensbrottet Östra Utsjö i Malung

This paper deals with village history around millstone quarry Eastern Utsjö in Malung, Sweden, in the hope of finding deposits that could date the quarry, in that the quarry in the current situation is dated only by the millstone fragments outside the resort. My purpose was to conduct a discussion on the quarry alone can be dated by deposits outside the resort. I have used FMIS RAÄ:s fornsök and a lot of literature to identify village history. The results showed that it is not possible to date the millstone quarry from village history, but through deposits outside the resort of Malung, which have been found around Mälardalen, Sweden through archaeological excavations, and derived from the millstone quarry Eastern Utsjö, can put an age on the quarry..

När kropp möter stad - ett existensiellt utforskande

Rapportens syfte är att arbeta fram förslag till en hållbar förnyelse av bostadsområdet Gulsparven i Trollhättan, på uppdrag av AB Eidar Trollhättans bostadsbolag. I dagsläget har området energirelaterade problem och är i behov av upprustning. För att komma fram till goda lösningar har litteratur- ochinformationsstudier, intervjuer med erfarna personer samt inventeringar av området gjorts. Förslagen åskådliggörs i form av ritningar samt 3D-vyer.Fyra förslag till förnyelse har tagits fram med olika grad av åtgärder, där två av dem kräver en omprövad detaljplan. Generella åtgärder, vilket gäller i samtliga förslag, är betydelsefulla lösningar för att växa mot rollen som ett hållbart bostadsområde.

Säker meddelandehantering mellan Citect SLADA och PLC

Rapportens syfte är att arbeta fram förslag till en hållbar förnyelse av bostadsområdet Gulsparven i Trollhättan, på uppdrag av AB Eidar Trollhättans bostadsbolag. I dagsläget har området energirelaterade problem och är i behov av upprustning. För att komma fram till goda lösningar har litteratur- ochinformationsstudier, intervjuer med erfarna personer samt inventeringar av området gjorts. Förslagen åskådliggörs i form av ritningar samt 3D-vyer.Fyra förslag till förnyelse har tagits fram med olika grad av åtgärder, där två av dem kräver en omprövad detaljplan. Generella åtgärder, vilket gäller i samtliga förslag, är betydelsefulla lösningar för att växa mot rollen som ett hållbart bostadsområde.

BOSTADSUTVECKLING & SOCIAL HÅLLBARHET : JM AB:s projektutveckling och dess sociala effekter

This report tries to discuss the concept of social sustainability; what it means and how residential development can be made more socially sustainable. This is done by interviewing several and various representatives in JM AB, the municipality of Uppsala and residents of Åriket to explore how JM AB as a housing developer and the municipality are working with issues regarding social sustainability and what the residents in one of the new housing projects themselves think of these issues. The result of these interviews will be compared and analyzed with the prospect of finding common variables and hopefully ways of improvement.This will result in our own recommendations of areas of improvement either by broad initiatives or specific actions to increase the social sustainability. Areas such as meeting places, sustainable functions and joint efforts between different parties. During the work on the report we come in contact with several other areas of interest that we are not able to process ourselves and therefore recommend them for future studies..

Att anpassa ett småhus till prefab

Prefabricering eller platsbyggt hus? Många ställer sig den frågan. Vad finns det för fördelar respektive nackdelar med prefabgentemot platsbyggt hus? Vilka ritningar behövs och hur går man tillväga?Detta examensarbete är en framtagning på hur man anpassar ett småhus till prefabricering.Platsbyggt hus är ett hus som byggs på plats. Material fraktas dit, förvaras och kapas.Den vanligaste byggmetoden för byggande av hus.Prefabricering av hus är däremot ett hus som byggs i en fabrik eller industri.

Kostnadsuppföljning avproduktionskalkyler

Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.

Hur följs kraven på tillgänglighet vid nybyggande av bostäder? : - En studie av utvalda bostadsprojekt i tre närliggande kommuner

The purpose of this study is to find out how housebuilding meets the demands of availability for people with some sort of disability. The rules and demands of availability are stated in Boverkets byggregler, BBR and the Swedish standard, SS 91 42 21:2006 (publ.5). The projects in this study are compared to the rules and demands of BBR and SS 91 42 21:2006 (publ.5). The rapport studies three different house projects in three different municipalities and the result shows that only three of these nine projects meet the demands of availability for disabled people..

PlusTak

Today´s roofing of dwelling houses is a very time consuming procedure, which includes a lot of different steps on the construction site. Not only does it cost a lot of money, but often do problems with rot and mold occur in the attics of houses today. The use of prefabricated modules has seen a great breakthrough in the field of construction of dwelling houses; at least when it comes to foundations and walls, where this type of approach makes the construction process way more efficient. What no one previous has succeeded to develop is a corresponding system for roofs that meets the demands of a dwelling house. Accordingly the goal of PlusTak has been to come up with a proper module system for roofing of dwelling houses, where the roofing is completed to meet the demands of the Scandinavian market. During the project a lot of effort has been put into customer contacts and the usability of the product, as well in the manufacturing process as on the construction site. This development has gone hand in hand with several practical tests and tryouts.

Prefabricerade passivhusväggar

Background: The most energy efficient houses today are so called passive houses. These houses achieve high energy-efficiency partly by having well insulated walls. U-value describes the amount of heat transfered through a building element, the more insulation, the smaller U-value. A typical passive house wall have a U-value of 0.10 W/m2,°C. The passive houses are primarily made as small family houses and not as a block of apartments.

Borrie kyrka - En byggnadsarkeologisk undersökning

AbstractThe church of Borrie lies about 10 km north of Ystad in the southern of Sweden. Though thechurch is one of the smallest in Scania it holds a very complicated history.In this essay all relevent material concerning the church of Borrie is presented. The materialdoes not only concist of literature, but also photographs. The purpose of this investigationwas to use this material to sort out and explain the history of the church of Borrie.The problem is presented in the following points:1. Is it possible to do a building archaeological analysis with photographs of the churchas the main material?2.

Identitesskapande med hjälp av externa designers

Outsourcing är ett begrepp som blir allt vanligare i företag. Ett vanligt argument för att man väljer att outsourca vissa delar av verksamheten, är att det ger en möjlighet till att fokusera på kärnverksamheten och därmed uppnå större konkurrenskraft. Studien syftar till att undersöka hur externa designers kan skapa en visuell identitet på produkten, samt vilka faktorer är viktiga då externa designers ersätter en in-house designavdelning. En kvalitativ fallstudie har genomförts på DUKA, Axcent of Scandinavia och Gant. I dessa fall har alla på något sätt kontrakterat ut antingen hela eller delar av sin designverksamhet.

Är BIM lönsamt vid projektering av ett småhus?

This report brings up the question - ?Is BIM profitable when planning a single-family home??.The methodology for finding the answer to this question is firstly to state the definitions of BIMand the company that is projecting by using the BIM-model. The answer is then obtained byanalyses of the factors of profitability with respect to: time, opportunity of revision, problemvisualization, preference adjustments and energy. A BIM-model has been made simultaneously asthe writing has proceeded to get a perception of how a BIM-model really matters for the analysis.The analysis shows that the answer for the question depends on further factors. The factors thatare mostly discussed are the company?s intentions and the complexity of the house.

Att anpassa ett småhus till prefab

Prefabricering eller platsbyggt hus? Många ställer sig den frågan. Vad finns det för fördelar respektive nackdelar med prefabgentemot platsbyggt hus? Vilka ritningar behövs och hur går man tillväga?Detta examensarbete är en framtagning på hur man anpassar ett småhus till prefabricering.Platsbyggt hus är ett hus som byggs på plats. Material fraktas dit, förvaras och kapas.Den vanligaste byggmetoden för byggande av hus.Prefabricering av hus är däremot ett hus som byggs i en fabrik eller industri.

Ny Falkenberg ? En skenföreteelse? : Om Falkenbergs svaga urbaniseringsprocess och dess roll som stad i Hallands medeltid

This essay deals with the weak and unstable urbanization process of the town Falkenberg. The aim has been to explore how a new town could be established just a kilometre away from the town (Old) Falkenberg and what kind of meaning the town had in relationship to the towns Halmstad and Varberg. This was made through the study of the political situation in Denmark and Sweden during the 15th century and through a comparison of the town churches. The archaeological material of Falkenberg is very small and thus I had to trust the available historical literature about the town.Not much of the oldest history of the town is known, but a conflict between the landed aristocratic family Thott and the king Kristian I in Denmark has been interpreted as a reason to the establishing of the town. In conclusion the survey showed that the king probably established New Falkenberg in purpose to limit the trading possibilities of Thott and to, at the same time, increase his own power in the district.

De sjukaste överlever : en osteologisk undersökning av nio gravlagda individer från karmeliterklostret i Ny Varberg

Osteological analysis was carried out on skeletons from nine graves from a medieval cemetery in Ny Varberg, Varberg, Halland. The graves originate from a monastery and a church, dating back to the fourteenth and fifteenth century. The main aim with this thesis has been to study health through the presence of pathologies and skeletal changes. Further aim was to compare the results from the present study with theresults from Torsten Sandbergs analysis of the same material from 1964. This comparison later showed coincidence.

<- Föregående sida 29 Nästa sida ->