Sök:

Sökresultat:

2129 Uppsatser om Mechanical construction - Sida 4 av 142

"Jag ska också göra chokladbollar" : En undersökning om hur tillgången till konstruktionsmaterial påverkar barn i förskolan

The aim of this study was to investigate and compare the availability of construction materials affect children's constructions and play. Observations were made when the children were allowed to play and build with very little and much of the material play-doh dough in preschool. The study is aimed at children aged 3 ? 5 years. Interviews were also conducted with educators in departments where the children spent time to give support to this study.The result shows that the children create as many designs of any material amount.

Konstruktion av specialmaskin för orientering och positionering av nyckelämnen

The thesis in product development ? mechanical design includes 15 credits and was carried out during the spring of 2014 at Semcon in Eskilstuna. The task is to construct a special machine for positioning and orientation of a key blank found in six different shapes, the construction is a part of a larger machine for encoding the key blank where a pick- and-place device or robot pick up the key blank and deliver it further in the process. The entire construction is designed for ASSA OEM Gothenburg.In order to accomplish the project the first step was to analyze the existing solutions to similar problems on the market in a current situation analysis to create an understanding of the problem. This was followed by a flow analysis and a functional analysis to get a deeper understanding of the problem and structuring the machine's process flow and its features.

Leverantörsrelationer : - i byggbranschen jämfört med ett företag i produktionsbranschen

Study objects: JM, Folkhem and ABB.Purpose: The purpose with this study are to examine how the supplier relations are in the construction branch and compare that result with how the supplier relations are for ABB a production company.Theoretical: The theoretical chapter illustrates important and relevant parts of supplier relations, purchasing and supplier strategies to give good overview. The theoretical review will combine information from different fields to consent with the research problem.Method: A case study has been made on three different companies, one of the companies was active in the production industry the other two were active in the construction industry. Data was mainly collected through semi structured interviews on each of the three companies.Conclusions: The size of the company decided which point of view the company had on purchasing, traditional or modern view. All three companies had a centralized purchasing organization but the construction firms were more decentralized than the production company. The reason was that the construction firms were dependent with more flexibility when every construction project is unique..

Säkrare byggarbetsplatser : En rapport om arbetsmiljö i allmänhet och fallolyckor i synnerhet

In Sweden there are 299 000 working in the construction industry. The construction industry is one of the industries where most accidents occur every year. During the last ten years there have been 111 death accidents in the construction industry and 48 of them were falling accidents. That means, in average, one death accident every month.Falling accidents gives serious injuries to the persons who are affected by them. It is anticipated that this report will investigate the factors beyond the falling accidents and also to present proposals that can decrease the number of falling accidents in the future.To secure a healthy and safe construction site it is of great importance that both the employers and the employees cooperate towards the same goal.

Effektivisering av byggproduktion med VDC och förstärkt verklighet : Streamlining construction work with VDC and augmented reality

Virtual Design and Construction (VDC) is currently used more and more within construction design and planning as well as construction as a streamlining tool aiming to improve communication and decrease the number of construction defects. VDC is constantly developing, but what comes next? The augmented reality (AR) technology is currently not used within construction in Sweden but should be considered as the next step in line regarding the integration of reality and digital information. Using this technology design can become reality even before it?s actually built.The purpose of this study has been to carry out an inventory of the existing AR technology and its shortcomings, and also to identify possible applications within the construction phase.

FÖRBÄTTRAD MONTERING OCH DESIGNAV BAGAGELUCKA

This thesis includes a mechanical engineering design work performed incollaboration between ÅF and Halmstad University. The work is done by FredyOlsson?s methods of Principle- and Primary Construction and David Ullman?stheories of Design for Assembly.The group was commissioned by ÅF to produce a concept to narrow down theassembly time of today?s luggage doors by reducing the numbers of adjustmentoptions. They also wanted it to be easier to mount the assembly by making itpossible to adjust the door in a closed position. Today luggage door takes, with its10 adjustment possibilities, around 4 hours each to assemble and ÅF wanted anassembly time around 10 minutes per door.Initially a preliminary study was made where the group began reviewing today'sconstruction and mounting of rails and doors on buses.

Situationsanpassat ledarskap för byggproduktion

A large cost at the construction sites today is the labour cost of the workers. But unfortunately the worker potential is not used to full. It is not unusual to take into a count with a work-­?place-­?additional-­?time of 50% in some cases. By increasing the workers' motivation and responsibility for their tasks may reduce the time considerably, which also increases the potential for greater gains in construction projects.By using the situational leadership may the workers level of maturity develop entirely.

Dragleksak för Playsam

The report is a project in cooperation with the Swedish toy company Playsam. The assignment was to design a new toy to their range of products, a pull along toy in shape of a snail with a mechanical function. The research phase contains studies and analysis of the company, its identity, product range and its customers. The research phase includes all the information needed to complete the project. A number of concepts were presented for evaluation by the company.

Framtagning av typgodkända formkonstruktioner : Med inriktning mot traditionell väggform

This diploma work was conducted in collaboration with the Swedish civil engineeringconstruction company Skanska Construction in Stockholm. Their interest is todevelop a number of type approved form constructions which can be used during theconstruction of concrete walls. Skanska focuses on improving safety on their projectsand both supervisors and workers have a need for approved form constructions inthe current situation.The study is focused on safety and the purpose is to facilitate the preparation beforethe form work can begin. By studying the literature of the subject and conductinterviews with employees at Skanska Construction, the understanding of the issueand knowledge will be increased.Literature studies, interviews together with production and design have been thebasis for a successful study. The work has resulted in three types of approved formconstructions to Skanska Construction and the drawings can be used of employees atthe company.

Inneluftsventileradekryprumsgrunder : en utvärdering av två tillverkare

This Diploma work investigates internal air ventilated crawl-space in respect to construction and damp. The Diploma work assumes from a general description of crawl-space and general dump problems in ground construction. An internal air ventilated crawl-space is a construction where you take the ventilation air from the building and bring it down to the crawl-space and lets the air circulate before it passes through a retaining aggregate on the way out from the crawl-space. In this matter you get a worm space under the building and a lot less dump problems in form of · Ground damp · Build damp The ground dump reduces through draining around the building, different layer of gravel between the ground and the building and ventilation of the crawl- space. The build dump reduces through ventilation of the crawl-space as fast as possible.

Framtagande av riktlinjer för arbetsplatsbesök enligt nya Plan- och bygglagen

A new site- and construction-law came into effect in May 2011. The new law, PBL2010:900 implies several different changes of the law. These changes concern bothconstructors, people working in municipality and county councils and other peoplethat in some way are related to the building sector. Except from the change in orderof the chapters and the renewed and modernized language, the law has now beenextended with a few new phases.According to the new law a certificate has to be issued to start and finish theconstruction; the construction consulting has changed name into technical consultingand the protocol for the controls has to show what the control is being compared to.This diploma work concerns control visits on construction sites as related to the newlaw. The reason why visits on construction sites are now implemented in the law isbecause the government saw a lack of trustworthiness in the old law.

Utveckling av handtag till spolarvätska

Title Becoming involved in the planning process - from the construction workers perspective.University/Institution Halmstad UniversityKeywordsEmpowerment through participation, construction workers involvement in decision making in the planning process, knowledge management and communication in the planning process, partnering, human resource managementAimThe aim of this bachelor thesis is to provide knowledge and examine how construction workers perceive involvement in the planning process of partnering projects, what they can contribute and what they get out of the planning process.Methodology The study was conducted with a qualitative approach in the form of semi-structured interviews.          The interview studie consist of 10 interviews with construction workers who are specially educated in participating in the planning process at the company ByggDialog AB.ConclusionAll respondents are positive to be involved in the planning process. The main advantages they can see is that they are able to influence technical solutions and methods that will be used later on in the production. Therefore it is important to consider when construction workers should be involved in the planning process so that they get the chance to influence in this decisions.When it comes to the decision making the construction workers should be involved in the decisions that are related to their tasks in the production such as technical solutions, choice of methods and materials. Their main duties and working hours should be in the production.Involvement in planning does not automatically mean that the construction workers are involved in the decision making, it is up to them how much they participate.

Trä som fasadmaterial ? behandling och beständighet

Since prehistoric time man has used wood to build their environment. The material?s availabilitycombined with its good mechanical properties has often made it the material of choice. Like allmaterials exposed to natures degradative processes the properties of wood decreases over time.Rot, UV radiation and attacks by insects and pests damage wood if not protected. Since we wantwhat we build to consist, optimizing our building materials durability is of great interest.Techniques and methods for increasing the endurance of wood have been developed in severaldifferent places and for a long time.

Mekaniserad plantering med Eco-Planter i södra Sverige :

This report is a thesis work for a B.Sc. in Forestry exam at the School for Forest Engineers, SLU. The work was an assignment from Södra Skogsägarna and the aim of the work was to investigate the economical and biological output after mechanical planting with Eco-Planter compared with traditional manual planting. Eco-Planter is a tool for mechanized planting, fixed at the end of the boom on a conventional harvester. The study confirms that manual planting is less expensive under normal conditions. However, the differences between mechanized and manual planting are not that big and with technical development and/or increased labor costs together with an improved work organization the system with Eco-Planter could be competitive. The biological output, e.g. planting result and survival rate, seems to be quite good.

Analys ac konstruktionsprocessen inom FTC

This thesis work was made to optimize the writing of the construction specificationsat FKA. These construction specifications are created before each plant modificationsthat is started because requirements from the Swedish radiation safety authority(SSM) and internally on Forsmarks nuclear group as constructions / implementationdocumentationThe study was done through seven interviews of two people at three different groupsinvolved in the construction specification and an interview from the group accreditedverification. The four selected groups were selected through an extensive analyticalwork resulted in an elimination matrix where these four groups was considered to bemost involved with the construction specification.The questions asked to these individuals were based on the instructions and sampletext that are described in the construction specification. To ensure the quality of thethesis were to limit itself to the chapters that were considered most relevant toimprove. The analysis revealed a number of points that should be improved, partlyinto the routines when writing the construction specification and when ether sampletext or suggestions should be changed and complemented.

<- Föregående sida 4 Nästa sida ->