Krafter på rörsystem vid transient flöde : En jämförelse mellan RELAP5 och Fluent
At Forsmarks Kraftgrupp AB (FKA) forces on pipe systems due to transient flow are frequently calculated as a step to verify their structural integrity. In nuclear industries these forces are often calculated with a one dimensional thermal-hydraulic analysis-code called RELAP5. When calculations regarding more complex geometries are needed, the three dimensional code Fluent is often used. This code is highly time consuming and requires large computational power.This projects aim is to compare calculations of pressure, flow and forces carried out by RELAP5 and Fluent for an arbitrary pipe section during transient flow conditions. This has been accomplished by constructing a simple geometry for which a transient flow is simulated in both programs.
Sambandet mellan saldodifferenser och effektiva materialflöden : Fallstudie utförs på Atlas Copco?s logistikavdelning
Problems arise when the number of products in stock does not correspond with the number of products the information system says the company has in stock. (Sharda & Agrawal, 2012) In order to change that, major changes has to be made when it comes to making continuous improvements and to raise their standards regarding product availability and record inaccuracy (Wild, 2004).The purpose of this study is therefore designed to identify factors affecting the balance differences and what impact it has on the efficiency of Material flow. The demarcation of the work is that Atlas Copco has begun working with Lean and it will not be investigated nor the relationship between balance differences and Lean. The study was based on answering the following questions: What influencing factors can be identified for balance differences? What factors are relevant to the efficiency of Material flow? What kind of impact the balance differences has on these factors?In order to answer the purpose and issues, a theoretical framework has been developed with help of literature studies and an analytical model.
Fältmätning och utmattningsanalys av hjullastarskopa
I denna rapport predikteras livslängden, med avseende på utmattning, för en hjullastarskopa. Två av de mest kritiska svetsarna utvärderas enligt IIW:s (International Institute of Welding) rekommendationer genom nominella spänningsmetoden, hot spot-metoden och effective notch-metoden. Beräkningarna utförs med hjälp av finita elementmetoden. Genom att utföra töjningsmätningar på hjullastarskopan i drift erhålls spänningsdiagram. Dessa uppmätta spänningsdiagram analyseras med rain-flow count-metoden.
VÄRDEFLÖDESANALYS AV PW1000G 30k TEC
The thesis work has been carried out at Volvo Aero Corporation (VAC) in Trollhättan. VAC has entered a partnership as developing and producing partner with engine manufacturer Pratt & Whitney and is currently at the starting phase of producing the turbine rear frame (TEC) to the engine PW1000.The purpose of this study was to create a report on process level that describes the conditions and the potential with PW1000 TEC to reach the product cost calculation taking into account lead times and describe alternative method solutions.The report describes a comparison between the present flow (2012), a flow based on product cost calculation (2016) and a potential flow (2016). The work has mainly been based on acquiring the knowledge and information available to inspect the present flow; this has been done by workshop observations, meetings and gathering of the information that is available on the work site for the PW1000 TEC.The information obtained has been merged into an Excel document, called Roadmap. It serves as a roadmap with current situation as the start and the potential flow for 2016 as the goal. With the roadmap as a tool, assumptions have been taken considering the flow and how it will change, where processes have been eliminated, reduced or marked as a problem..
Dödshjälp i dagspressen : En analys av dagspressens rapportering om Kims öde
A good flow of information in organizations is one of the key aspects of how we define a well-functioning organization. The information flow could be internal as well as external between actors within as well as outside of the organization. In a logistics organization this flow of information is equally important as in any other kind of organization. In this paper we have explored information flows in logistics organizations by applying, boundary spanning and the mobile-stationary divide perspective. In boundary spanning the main goal is to erase or relocate some of the boundaries within an organization, in our case to make the flow of information internally as well as externally better.
Utvärdering av tillverkningsmetoder för svarvbommar
On today?s competitive market, it is difficult to achieve profitability trough high prices on manufactured products. Profitability must be obtained through low manufacturing costs, high quality and short lead times. One of the companies on the market is Sandvik Coromant, manufacturer of tools and chips for metal cutting. This master thesis investigates the methods of manufacturing for boring bars at the manufacturing unit GVH4 at Sandvik Coromant in Gimo, Sweden.
Flow i undervisningen - en studie om lärares uppfattning om begreppet flow
Det här arbetet handlar om flow och hur begreppet samverkar med olika aktiviteter i våra liv. Bakgrunden till flow förklaras inledningsvis i kapitlet om teoretisk bakgrund och sätts senare i relation till inre förändring, socialt samspel, fysisk aktivitet, kommunikation, samt pedagogik. Syftet med arbetet är att ge svar på hur flow kan användas i undervisning. Som metod för datainsamling har jag gjort en gruppintervju med fyra lärare aktiva vid Musikhögskolan i Malmö. Gruppintervjun fungerade som ett vardagligt samtal mellan fyra personer och resultatkapitlet är sammanställt i sex rubriker: Introduktion; Personernas uppfattning om flow; Vägar till flow och hinder på vägen; Gruppflow; Flow, kvalitet och kommunikation; samt flow och undervisning.
Boven i det interna samspelet : En uppsats om kommunikationen mellan sälj- och logistikavdelning på industriföretags påverkan på det interna materialflödet
We have left the industrial society, and instead, we live in a post-industrial knowledge and information society. It is often said that industrial production has disappeared or that it has changed greatly. This means that fewer are employed in the manufacturing sector while the service sector is increasing, resulting in that the boundaries between production and administration decreases. The production goes from mass production to more flexible and specialized solutions. This puts greater demands on the logistics chain that continually need to work to meet customer requirements.
Nitrogen flow in Scania : substance flow analysis on a regional level
In this thesis, the flows of reactive nitrogen (Nr) in Scania were investigated and quantified. The thesis was also intended to form a basis for comparison between the urban nitrogen flow and other flows of nitrogen within Scania. The management of nitrogen in society has disturbed the natural nitrogen cycle. This is linked to a series of environmental problems such as eutrophication, acidification, global warming and smog.
The method used was Substance Flow Analysis (SFA) for Nr. For calculation and flow charts Scania was divided into three subsystems; air, water and society.
Utvärdering och åtgärdsförslag av energianvändning i kontorsbyggnad
AbstractEmbla 5 is an office building which has done a large improvement. The clients of this building has made an order of WSP and the student Anders Kempe to calculate the use of energy for the building, and after that result proposing further measures which can decrease the energy use of Embla 5.The ground for this report is when calculation of the present energy use of the building is stated. To make that information of a number of parameters such as envelope, the heating system and ventilation has been located and set in to the simulation program IDA ICE which calculate the energy use.To improve the energy use further this project has been concentrated to change the system of ventilation. Today the ventilation system is of the kind CAV (constant air volume) and the air flow is dimensioned for after recommendations from BBR and Arbetsmiljöverket in the office spaces. Consider that Embla 5 is an office building where the people only staying for 8-10 hours/day so was the ide to see how much energy saving if the air flow is reduced the time people not being in the building.
En rörig historia : en fallstudie över Secorocs processflöde av DTH-rör
Abstract Title: A messy story ? a case study of Secorocs process flow of DTH-pipes Presentation date: 2010-06-02 Course: Bachelor thesis in businessAuthor: Kristoffer ForsmanAdvisor: Kjell GustafssonKeywords: Management control, process control, lean production, process flow analysisPurpose: The purpose of this bachelor thesis is to develop an overview of the process flow for a specific product, and with the help of this mapping based on a lean production philosophy show possible improvement proposals and how these can lead to a more efficient process flow.Methodology: I have used a case study of Secorocs DTH-pipes and my primary data are gathered through interviews and observations. I have used theoretical framework to establish a process flow analysis. This is to obtain data on process activities and whether they are creating value or not. This leads to a current mapping of the situation in Secoroc on DTH-pipes and then analyzed and suggestions for improvement are developed.Conclusions: That by using the above mentioned mapping of process flow of DTH-pipes, problem areas could be illustrated.
Ökat flöde genom timmersorteringen vid Ala sågverk
Ala sawmill in Ljusne, Hälsingland, has increased its flow through the sawing plant during the last couple of years. The problem now is the sorting plant, as this part of the mill is now slower than the rest. A close analysis of the sorting plant was therefore necessary to be able to increase the flow through. The aim of the project was to find solutions that can lessen downtime and increase flow. The goal was to increase the flow from 650 to 925 logs through the sorting plant per hour.
Torkat bioavfall som jordförbättringsmedel
The main project Dry preservation of source-separated organic household wastes involves a new technique for treatment of biowaste through drying. Investigations are going on to determine how the dried biowaste best can be used to close the natural circular flow of nutrients. The objective of this degree project is to determine if the dried biowaste can be used as a soil conditioner. By restoring the nutrients in the material to the ground, the natural circular flow is closed. A declaration of contents, including the nutrient levels, C/N ratio, pH and the electrical conductivity of the dried biowaste, was constructed and a germination test was done to make sure that the material did not inhibit sprouting.
Arbetsglädje : En kvalitativ intervjustudie om hur fem lärare i grundskolans tidigare år beskriver arbetsglädjens betydelse och påverkan
The goal of this study is to examine what five teacher?s impression of the teacher?s role is in their previous years. How important the ?joy at work? is in relation with the educational progress? And what aspects that contributes to the? joy at work? and what obstacles that stops them. The essay will also go through the concepts of a teacher role, with connection to the theoretical perspectives of Csikszentmihalyi?s Flow and Antonovsky?s Salutogenesis (KASAM).The method I used was interviewing five teachers and I used Larsen?s chapter of ?content analysis? as a basis, I also used Flow and KASAM as theoretical references in my analysis.
Simulering av ett värmesystem i COMSOL Multiphysics : Pipe Flow Module
Syftet med detta arbete är att simulera ett värmesystem i COMSOL Multiphysics, Pipe Flow Module, Non-Isothermal Pipe Flow som innehåller ekvationer och randvillkor för att modellera inkompressibel strömning och värmeöverföring i rör.Data om processen och dess komponenter har samlats in från industrin där arbetet är utfört och i vissa fall modifierats för att bättre beskrivas i programmet.Utifrån insamlad data har en modell byggts upp och två simuleringar har gjorts. En stationär för starten av systemet, den har sedan legat till grund för en dynamisk som simulerar förloppet från start till normaldrift.Tiden det tar för det aktuella fallet att nå drifttemperatur är 16 timmar. En felströmning upptäcktes samt att en av pumparna inte kommer att klara en start från 20 °C..