Sök:

Sökresultat:

3 Uppsatser om MIUU - Sida 1 av 1

Gradering av vindkraftslägen i Lerums kommun med hänsyn till infrastruktur och läge

The aim of this master thesis was to find and grade suitable sites for wind turbines in the rural district of Lerum at the reguest of Göteborg Energi. The rural district of Lerum consists of very complicated terrain which was the reason why we picked Lerum.The assignment was achieved by using the software program ArcGIS and its attendant tools. In step 1 an overall analysis was made in order to sort out the least suitable sites. Step 2 consisted of a 3D analysis in ArcScene together with a more precise analysis in ArcMap. As result we found two interesting sites, which met our demands and specific constraints.

Skogs påverkan på vindkraftsproduktion - en fallstudie av vindkraftverk vid Andersfält.

The purpose of this master thesis is to investigate how nearby forests affect the energy production in wind turbines. To reach the purpose a case study is performed on three wind turbines sited on a field in a north-south line at Andersfält in the municipality of Halmstad, Sweden. Approximately 100 meters south of the southern wind turbine a forest is situated. The case study is divided into three sub studies where the difference in energy production, the affect of the forest and a wind meteorology model, WAsP, is studied. The result show that the forest have a significant influence and that the WAsP-model gives an incorrect result of the energy production in wind turbines sited near a forest..

Vindkraftsetablering i skog

This thesis assignment at C-level is focused on calculation models and prediction methodswhish can be used in the stage we call ?prospecting? of possible windmill locations. Thelocation is southeast of Halmstad at the Farm ?Stjernarpsgods?. The rapport has two mainareas directed towards this task.