Sökresultat:
2105 Uppsatser om Low-energy house - Sida 21 av 141
Ett holländskt fenomen i Värmland : Faktorer bakom och effekter av en holländsk inflyttning
AbstractDuring the last five years there has been a considerable immigration from the Netherlands to Värmland in Sweden. INVA, Invest in Värmland, wanted to highlight this phenomenon and therefore contacted Karlstad University to make a survey about how extensive the immigration is and what consequences it brings for the business life and municipalities in Värmland. We were luckily chosen to perform this research and the main focus in this study has been the following questions:? Why do the Dutchmen choose to buy their house in Värmland?? What are the main reasons for leaving the Netherlands?? What consequences does the immigration cause for the business life in Värmland?? How do the Dutchmen experience the contact with Swedish authorities?To answer the questions we designed a questionnaire that was sent to 200 Dutch house purchasers. The ambition was to survey all the Dutch house purchasers in Värmland, but with the time constrains and the municipalities having problem to find complete data, we limited the survey to 200 households.
Verifiering av beräknad energiprestanda för flerbostadshus byggda år 2007-2009
The building industry consumes approximately 40 % of the total energy consumption in Sweden, where the using stage is dominating with 80 %. There is a lot of work in progress to reduce energy use in the building industry, and the demands from authorities regarding energy use increases. As a part of this work Building and planning department of Sweden has established a requirement that has been applied since 2006, and restricts a maximum energy use for buildings.The requirement includes that an energy simulation must be done in advance to demonstrate that it is possible to meet the demands.Reality is however more complex than an energy simulation program, that frequently underestimates the energy use of buildings. The purpose of this thesisis to study and analyse deviations between estimated and actual energy use in modern apartment buildings. The study includes four apartment buildings in Stockholm, Gothenburg and Jönköping that were built in 2007-2009.
Energieffektivisering av industribelysning : Planering av belysningsanläggning i mekanisk verkstad
In Uppsala, Sweden, Vattenfall has a combined heat and power plant. On the premises there is an engineering workshop with old fluorescent and mercury lamps that need to be replaced. This provides a great opportunity to save energy and money by installing more efficient lighting. The main purpose of this study was to present two functional and energy efficient lighting systems including control system. The lighting systems were designed by investigating the working environment, measuring illuminance and by simulations in the software DIALux.
Incitament för energibesparande åtgärder i den byggda miljön
More efficient energy consumption is essential to secure a sustainable future, not least within the building and real estate sector which answers for approximately 40 % of the EU countries total energy consumption. One part of EU: s work to reduce the energy consumption is the directive on energy performance of buildings which among other things have lead to stricter demands on energy performance in new and renovated buildings.One of the difficulties with making buildings more energy effective is that it often demands big investments and although it results in lower operating costs the extent of these savings and therefore also the repayment time can be difficult to decide beforehand. To make it interesting for property owners and also tenants to invest in energy efficient buildings powerful incentives are needed. Favorable loans to energy efficiency projects are one example of governmental instruments that have been tested in other European countries with good results.Reduced operating costs appear to be the main incentive for property owners to make their buildings more energy efficient. The best result of an energy efficiency project is usually achieved by cooperation between property owners and tenants but in order to make that interesting it is important that both parts can profit from the savings.
Passivhus det långsiktiga valet. En konkret jämförelse mellan konventionellt byggande och passivhus
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Incitament för förbättrat miljöarbete. En studie av miljöarbete I relationen mellan beställare och entreprenör
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Effektivisering : En utredning om åtgärder på en industrifastighet
AbstractDelta Terminal owns an outdated industrial building which they now rent out to businesses. This property currently has a high energy con-sumption and therfore it is desirable to improve the efficiency. In ordet to reduce the energy consumption within the industrial building enve-lope, the heating systems and lighting are being investegated. A good building envelope emits less heat and thus reduces the energy consump-tion. An energy audit is a tool used to determine the energy loss.
OLJEKRISEN 1973 - En studie i politisk ekonomi kring förlopp och effekter i Sverige och Danmark
ABSTRACTThis thesis focuses on the OPEC oil crisis of 1973 and its impact on the Scandinavian countries of Sweden and Denmark. Starting from Walter Carlsnaes theory of energy vulnerability, the concepts of vulnerability and national security are tested on the selected cases and an array of policy alternatives are assessed. Posited available options like oil stockpiling, conservation, renewable energy and international coordination are evaluated as means for ameliorating the vulnerability of the nations. The theory chosen is further expounded with a consensus element to reinforce its explanatory power. The thesis utilizes a wide range of material from parliamentary records to daily newspapers in an attempt to shed some light on the interplay between economics and politics.Sweden and Denmark evince diverging developments despite their common starting point with exceptionally high oil dependencies and can be located on different ends of the energy policy gamut.
Energikartläggning hos RostiGP i Gislaved
In today?s modern age, energy consumption has become a major issue, both from an environmental viewpoint and cost perspective. Because of a rapid technologic change and increased costs of production of electricity, the demand to develop effective methods for energy efficiency industries have grown.The electricity-intensive industries, such as plastic industry, the demand to reduce energy consumption has grown significantly over the past 10 years, which have led to the development of different methods to determine and locate energy-consuming parts in the industry. This also means being able to prioritize and organize activities in the industry.In this study the measurements of voltage, current, power and PF performance on injection molding machines (K-TEC 275 form Ferromatik Milacron in Germany) with a focus to locate, within a machine, various measures that could improve energy use in the plastics industry, in this case RostiGP in Gislaved. These measurements have been carried out with the help of a power quality clamp meter to carry out time logs of the machines for some time during normal word rate.
Smart Control : En reaktion på EU:s ekodesignkrav
The purpose of this thesis is to assist the Swedish energy company NIBE Energy Systems in their studies of adaptive regulation applicable to electrical water heaters. Due to coming energy classifications of these appliances in the European Union, NIBE Energy Systems needs to use adaptive regulation, called Smart Control, to keep their products in the best possible energy class and remain competitive to the market. By using this Smart Control regulation a 2-3 % improve-ment of efficiency can be credited the system. This is a small number, but heavily needed, since the energy classes are based on the idea that the European Union is provided with electricity from coal condensate power resulting in a 40 % maximum efficiency. Furthermore, doing noth-ing will result in some water heaters not being approved to use on the market from 2015 due to low efficiency.
COTS eller in-house : Processen bakom valet av systemtyp
När informationssystem ska utvecklas handlar det om att välja den systemtyp som lämpar sig allra bästa för uppgifterna. Främsta handlar det om att välja mellan COTS och in-house. Idag finns det inga modeller som avhandlar det specifika valet av systemtyp. Detta innebär att valet av system i många fall sker på ren chans.Bristen på modeller och hjälpmedel för val av systemtyp innebär således att det uppstått en kunskapslucka som resultatet från arbetet är tänkt att fylla. I arbetet presenteras en modell för hur valet av systemtyp bör ske, vilken kombinerar befintlig teori inom området samt kompletterar med nytt.
Vivesholm : djurbenen belyser den gotländska medeltida borgens husdjurshållning samt husgrundernas användningsområden
The castle Vivesholm is located about two miles north of Klintehamn on the west side of Gotland. The castle was built around year 1395 and burned down in the end of the 14thcentury. Around the 17th and the 18th century the castle was re-used. However, the emphasis on its use is during the middle ages.This paper aims at getting an insight in the animal husbandry at Vivesholm by analyzing the osteological material. The analysis revealed that bones from sheep/goat were more common than bones from cattle.
Spillvärmeåtervinning
SAPA´s resource of waste heat is the basis for this thesis to investigate the possibility of energy assets in their cooling water and possible uses for it. The energy in the waste water is greater than the current need which has three uses which are (1) heating the factory, (2) converting liquid propane to propane gas and (3) local domestic heating. The average energy load that is available is 1, 7 MW and the average temperature in the cooling water is 41°C. The total energy load at dimensioning out side temperature is approximately 1,6 MW for the three current uses. The temperature is currently too low to be used directly in the existing systems so an upgrade is needed.
Lärares erfarenheter av arbete med elever som far illa
The purpose of this study was to investigate the association between physical activity and perceived stress, energy and musculoskeletal disorders among office-workers and warehouse-workers and also to see if there were any differences depending on work-place and gender. The method that was used to collect data was three different validated questionnaires that measured stress and energy (the Stress-Energy questionnaire), musculoskeletal disorders (intensity and localization of pain, a Pain Drawing questionnaire with a VAS-scale) and physical activity (IPAQ ? the short version). Eighty-eight workers participated in the study. Forty-seven of them were office-workers and forty-one were warehouse-workers.
Utredning av Aktiv designprojektet vid RV40. Inriktning mot utveckling av objektiv kontrollmetod med avseende på framtida funktion
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.