
Sökresultat:
467 Uppsatser om Low voltage grid - Sida 5 av 32
Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Föroreningstransport med dagvatten - Utveckling av reningsmoduler för modellverktyget Mike Urban SWQ (Storm Water Quality)
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Inventering av bitumenbundna lager med hög stabilitet ?hård asfalt? anpassade för stora hjultryck på industri- och hamnytor
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Effektivisering av dataflödet mellan anläggningsmodell och maskinstyrning - En översikt av flödet från konsult till entreprenör
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utveckling och tillämpning av modeller förkvantifiering av de ekonomiska konsekvensernaav ökad förbrukningsflexibilitet inom eldistribution
One step towards a more sustainable energy system is to create a more flexible electrical grid, where increased demand response among electricity consumers can play an important role. A distribution grid owner can encourage their customers to use electricity more evenly distributed during the day by introducing different types of grid fees such as time-differentiated power tariffs. In this master thesis, the theoretical economic impact of a flattened load profile for a distribution grid owner is investigated. Different factors that impact the distribution grid owner?s economy are identified and two are chosen to be quantified; losses in the grid and the fee to the feeding grid.
Bärighetskontroll av obundna granular material. En jämförelse mellan olika bärighetskontroller samt en alternativ utvärderingsmetod av bärighet med Lätt Fallvikt
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Analys av mellanspänningsnätet i centrala delar av Västerås stad
The dependency of continuous electricity supply is high in the Swedish society today, at the same time no one is willing to pay for a too costly or over dimensioned power distribution system. The owners of the distribution systems are the ones responsible for this balance act of maintaining a high quality of electricity delivery to customers at a reasonable cost.In this master thesis a limited part of the primary distribution system (10 kV), owned by Mälarenergi Elnät AB and located in the city centre of Västerås, was chosen for a deeper analysis of its reliability. Its ability to handle outages of system components (N-1 and N-2 contingency analysis) was investigated to find out potential weak spots and parts of the grid that showed signs of being overdimensioned.The results of the performed simulations showed that in 74 % of the studied N-1 contingencies cases, consisting of outages of a bus bar in a distribution substation, the system could handle this without causing outages in other parts of the grid. For the N-2 contingencies 61 % passed the test. It was also found that one of the two included high voltage substations could alone supply the investigated part of the grid.
Uppföljning av EcoDrivingutbildning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Hantering av småskalig elproduktion : Utveckling av modell för dokumentation och elkvalitetsberäkningar
The interest in small-scale electricity in Sweden has increased strongly in recent years. The interest is noticeable both among politicians to increase the share of renewables in the energy mix, and among electricity consumers to partially replace purchased electricity with self-produced. This has resulted in a significant increase of electricity production in Low voltage grids in recent years, and the trend appears to continue in the coming years. The majority of the new production plants are solar cells, followed by wind turbines, and it is also in these the greatest efforts are made in this paper.Distributed generation is often seen as something positive since it will contribute to reduced transmission losses and reduced voltage drop in the networks, and that it increases the share of electricity from renewable sources. In cases where the grids are not strong enough, or in other ways not adapted to manage the installed production, power quality may be adversely affected.
Vakuumbrytare i småskaliga vattenkraftstationer
This master thesis has been performed at Vattenfall Power Consultant in Gothenburg and Trollhättan for Vattenfall Vattenkraft. In this report vacuum circuit breaker in small-scale hydropower stations with the rated power 4 MVA and below has been studied. Models of the stations are modeled and analyzed in PSCAD/EMTDC to study the high voltage transients that are created after current chopping with vacuum circuit breaker. Vacuum circuit breaker may chop the current before it reaches zero value, which means that high voltage transients can be created. The equipment of the stations can be destroyed by high voltage transients.The purpose of this thesis is to examine the use of vacuum circuit breaker in small-scale hydropower stations and the risk for high voltage transients from current chopping.According to the results there is a risk of high voltage transients after current chopping with small synchronous generators in stations with the operating voltages 0.4 kV and 3.6 kV.
Automation i Distributionsnät
As a part of Göteborg Energi?s work towards a smarter electric grid, the company has chosen to investigate the possibilities of automation in their middle voltage grid. In Europe, there are example cases where these technologies already are installed which many articles on the CIRED conference 2011 proved. Netcontrol Oy in Finland has, together with Tekla, created an automated SCADA system that Vattenfall in Finland today uses. The grid mainly consists of 10 kV open loop fed city grid and this automation is mainly designed for this type of grid.
Laddningens påverkan på sprängskadeutbredningen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Kartering av föroreningskällor i urbana avrinningsområden
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.