Sök:

Sökresultat:

4475 Uppsatser om Lean Project Delivery - Sida 30 av 299

Finansiering av små tillverkande företags tillväxtmöjligheter i revitaliseringsfasen : Finansieringsprocessen

In 2014-2015 a large-scale Ebola epidemic occurred in West Africa. The Swedish Civil Contingencies Agency was given the order to conduct the Swedish response. The purpose of this case study was to investigate the impact on project planning of the three factors: the nature of the crisis, political initiative and developing countries. In this case study the crisis was an epidemic, and the project was initiated by the Swedish Government and conducted in two developing countries. The results were intended to contribute to developed understanding and recommendations for future project managers in similar projects.

Lean inom sjukvåren : Effektivisering av patientflöde

This report describes the planning and the accomplishment of the final diploma workat the study program Mechanical Engineering, Department of Engineering Sciences, Uppsala University. Two students carried out the diploma work at GE HealthcareHusbyborg in Uppsala.The aim of the diploma work was to develop and improve existing processequipment for 11C-radiochemistry in PET. The process equipment was to be dividedinto smaller independent modules to make it more flexible. Part of the existingprocess equipment is an oven that is supposed to perform a specific chemicalreaction. One of the main goals was to study and improve this oven.The work could be divided into three main phases: 1.Present concepts for one module, and interface between different modules.

Passivhus - Vikten av lufttäthet och attityder hos boende

E-Series 450 is a chainsaw designed by Husqvarna AB to the semi-professional user. Husqvarna is a world leader when it comes to chainsaws, trimmers, lawn mowers and garden tractors. The problem in hand can be addressed by the question. ?How easy can we start a chainsaw? The purposehas been to provide a solution to the question above and give Husqvarna a good base of which they can continue towards a finished product.

Lean Logistics: Implementering av Lean och Supply Chain Management i svensk industri

Vårt moderna samhälle är idag beroende av dagliga transporter som både är en stor kostnad för producerande företag och dessutom har en stor miljöpåverkan. Främst eftersom klimatfrågan idag debatteras flitigt men också för att det finns stora incitament för företagen att minska sina transportkostnader kommer vi, med största sannolikhet att se stora effektiviseringar av denna bransch inom en snar framtid. I detta arbete behandlas därför i vilken utsträckning två välkända teorier, Lean och Supply Chain Management, kan användas för att optimera transporterna främst vad gäller kostnad och miljöpåverkan. Efter att ha analyserat ett flertal rapporter som behandlat dagens transporter, transporttyper av olika slag och pågående miljöregleringar samt intervjuer med två svenska industribolag har vi kommit fram till att dessa två teorier inte lämpar sig i alla situationer. Lönsamheten i användandet av dessa två teorier beror på vilken teknisk grad företagets produkter har samt hur stor företagens produktion är.

Projektet att etablera vindkraft : möjligheter och risker med ett förnybart energisystem

This thesis describes the processes of establishing wind farms in Sweden. The workcontains a thorough literature review regarding both the establishing process andproject management, including complex project theory. The main part consists of theexecution of 15 interviews with organizations involved in wind farm establishment.The result of these interviews laid the foundation for a process description identifyingdifferent steps and activities in these types of projects. The outcome was thencompiled in a project model, which includes five phases and four processes.When analyzing the project of establishing wind farms from the theory of complexprojects one discovers that the amount of different requirements and stakeholdersnecessitates a systematical and dynamical project structure. Since projects are in needof different types of competences there are also many consultants and contractorsinvolved.

Systematisk limning av kartong

This report is a documentation of the workflow and the result of a project carried out by twostudents from the Royal Institute of Technology in collaboration with a company. The report isstructured in a chronological order and describes the methods and systems developed in theworkflow. The report shows how the project evolved from a study phase to the various proposals onthe concept solutions.The project aims to develop a systematic way of bonding two different kind of cardboard under fiveminutes. By conducting a general study about glue and its different forms it was possible to obtain abroad knowledge, which helped to choose the right substances to later use in testing on the differentcardboard materials in question. Glues's survey resulted in a list of different substances that wererelevant to the project.

Att reducera ledtiden i en produktion med hög variation och låg volym - En casestudie på Lab.gruppen

Due to increasing product availability and higher demands on fast deliveries, the competition between companies is growing. To be able to satisfy the customers? requests an efficient logistics system with short throughput time is required. By using tools associated with Lean production companies are able to make great improvements in their manufacturing systems and reduce lead times to satisfy customer demands.There are two classifications associated with manufacturing, high variety and low volume (HVLV) and low volume and high variety (LVHV). The general belief is that the concept of Lean production is difficult to implement in a production environment with high variety and low volume due to the concept being adapted to mass production.

Alternativ Start till Motorsåg : Reviderad för allmänheten

E-Series 450 is a chainsaw designed by Husqvarna AB to the semi-professional user. Husqvarna is a world leader when it comes to chainsaws, trimmers, lawn mowers and garden tractors. The problem in hand can be addressed by the question. ?How easy can we start a chainsaw? The purposehas been to provide a solution to the question above and give Husqvarna a good base of which they can continue towards a finished product.

Projektstyrning av IT-projekt : En jämförelse av projektstyrningen av två IT-projekt

Course: Master's Thesis in Business AdministrationPurpose: The purpose with this paper is to give an insight, and to compare, the project management of two IT-projects ? one which product was implemented and put into use, and one, which was implemented but no longer exists on the market. Furthermore also examine the critical success factors that influence the success respectively the failure of the IT-projects. Method: To attain the purpose with our study we have chosen a qualitative method. We have carried out interviews with two of the project managers of the IT-project of the two large companies.Result: A couple of problems occurred within the IT-projects of the large companies.

Att förstå friskvård och hälsa ur ett individperspektiv : Intervjuer med anställda inom verkstadsindustrin

The aim of this qualitative study was to give an deeper understanding of how employees in the engineering industry experienced health education and how they understood and gave meaning to the terms health and health education. The study was based on interviews with eight men and women who participated in a health education project which had been held on their workplace. When the study took place the interviewees were in the age between 28 and 58 years. The results indicate that the employees understood health as a combination of both physical and psychological factors. The positive aspects described by the interviewees based on their experiences from the project were increase physical activities and that the project had helped them to get a better diet.

Den nya generationen KinBag : The new generation of KinBag

This report summarizes a Bachelor Degree Project in Integrated Product Development,carried out during the spring semester in 2007 by three students at the Product Design Engineering programme at the University of Skövde. The project was performed as an assignment for KinBag ab, a sister subsidiary to Kinnegrip ab in Lidköping, who develop,manufacture and market the golf bag KinBag, a bag with an integrated wheel carriage system. The purpose of the project was to redesign the golf bag to attract a target group consisting of golfers aged between 20 and 40.The layout of the project was as follows: The project began with a feasibility study where different problems were identified with the basis of a market research which eventually was summarized in a dynamic specification of requirements. The feasibility study was followed by a generation of ideas which contained everything from sketches to simple mock-ups with an intensive amount of thoughtful brainwork and information gathering in between. This ledto the development of a number of design concepts, both on an overall level and on different parts of the golf bag.

Att överföra en turordningsbaserad spelprototyp till realtid : ett projekt rörande Victorious Skies och dess utveckling

This project details the process of converting and transferring a turn-based paper prototype to a digital real-time format. The projects goals were to see how well the original feeling could be transferred to real-time and how the transition itself went. The project have been completed with the help of the programmer Mikael Gullberg. The practical part of the project was executed between the dates of 25/4 ? 2/5.

Riskhantering i vägprojekt : Effekt, nytta och förbättringar

The aim with this thesis is to study the risk management in construction projects at the Swedish Road Administration, SRA. Furthermore, the aim is to find the effects of the risk management. The theorem of this thesis is that the positive effects of the risk management in construction projects create additional value to the project. These additional values are that the project itself becomes resilient and that the project goals are achieved without any significant disturbances.This thesis shows that the risk management in construction projects do not follow the guidelines set out by the SRA. This is due to a lack of education in the method and a difficult method all together.

Utveckling av Materialförsörjning : En studie av Sandvik Coromants försörjning av stål

This report is a master thesis performed by Adam Lundin at the company Sandvik Coromants production facility in Gimo. The work started in January 2013 and went on for the duration of 20 weeks, which is equivalent to 30 hp. The project was executed at the department GVR10. The scope of the project was to create a base for improvements in the purchasing process of direct material to the production. The background to the project was that the centralized purchasing department has gone through changes and decision was taken to decentralize the purchasing of direct material to Gimo.

Projektuppföljning - En studie av relationen mellan projektuppföljning och organisationsstruktur

This paper aims to examine performance monitoring in project organisations. The number of organisations that regularly performs projects as a key part of their operations grows rapidly, why this topic has become of large interest. Through a theoretical framework developed by Lars Östman in 1977, the performance monitoring system of the Swedish government-owned public utility Svenska Kraftnät is studied closely. The results from this analysis are then linked to an analysis of the organisation's internal structure through Mintzbergs generic organisational structures. Close connections are found between organisational structure and performance monitoring, which leads on to interesting observations about the connection between size of a project organisation and choice of monitoring method..

<- Föregående sida 30 Nästa sida ->