Sök:

Sökresultat:

1088 Uppsatser om Laboratory tests - Sida 53 av 73

Comparison of three IVC systems for mice, with focus on growth and nest building in juvenile mice

Today the individual ventilated cage system (IVC-system) is the most commonly used system when housing rodents. IVC systems are designed to control both supply and exhausted air at cage level, as well as temperature and relative humidity in the cages. This creates an optimal environment for the mouse and at the same time a protection against the risk of cross-infection between cages and the outside environment. The aim of this study was to evaluate the health and welfare for two different strains of laboratory mice (NMRI nude mice and C57BL/6NCrl mice) in three different kinds of IVC-systems; Arrowmight, Allentown and Tecniplast. 108 mouse pups from each strain (in total 216 mice) were selected after weaning at an age of three weeks and tested during 5 weeks.

Kylning och torkning av ett högtryckskompressorinlopp

Examensarbetet utfördes på University of Florida vid Department of Mechanical and AerospaceEngineering i deras Energy and Gas Dynamics Systems Laboratory. Laboratoriet forskar på enny gasturbincykel som producerar kraft, värme, kyla och vatten. Cykeln är kallad High PressureRegenerative Turbine Engine (HPRTE) och kombinerat med gasturbincykeln är ettabsorptionskylsystem (VARS). Kylsystemet drivs av spillvärme från avgaser som cirkuleras igasturbinen, den producerade kylan används för att kyla ned högtryckskompressorinloppet.Syftet med det här examensarbetet är att undersöka möjligheten till att kyla ned inloppet tillkompressorn till temperaturer långt under fryspunkten för vattnet i den fuktiga gasen. Om gasenskall kylas till nivåer under fryspunkten måste vattnet föras bort från gasen.

Produktivitetsarbete i anläggningsproduktion ? en fallstudie av ett entreprenadföretags möjligheter och hinder

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Passiva filtersystem för rening av lakvatten från avfallsupplag

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Flytta hus. En studie av metodval för tre flyttobjekt i Kiruna stad

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Solhus i Bahrain Kylning av enfamiljshus med el från solceller

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Analys av energilagringssystem portfolio för Volvo hybrid konstruktionsmaskiner

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Betongens yta: porbildning vid gjutning av brokantbalkar med lutande yttersida

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Fuktsäkerhetsprojektering ? från ankommande virke till nyckelfärdigt hus

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Inträngning av Silica sol i berg. Geologins inverkan på injekteringsresultatet

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Brokonstruktion i Tibet- Ett led i att förbättra infrastrukturen i området Sichuan

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Identifiering av onödigt arbete. En studie vid två specifika projekt

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Energisnålt stenhus : Förslag på utformning av enfamiljsvilla i Vejbystrand

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Undersökning av kunskaps- och informationsflöden i Passivhusprojekt: med avseende på lufttäthet

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

System för statusbedömning av byggnader. Förslag innehållande förundersökning och konceptbeskrivning

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

<- Föregående sida 53 Nästa sida ->