Sök:

Sökresultat:

3359 Uppsatser om Keywords: Cost controls - Sida 28 av 224

Den kollektiva missuppfattningen. En studie om missuppfattningar om färdmedelsalternativen bil och kollektivtrafik, för boende i Hjuvik

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Besparingar inom Barn- och utbildningsnämnden : en jämförande studie mellan Landskrona och Kristianstad kommun

Title: Besparingar inom Barn- och utbildningsnämnden.Seminar date: 29th of May 2009Course: Degree thesis in Business Administration, bachelor thesisAuthors: Amela Smajlovic and Sten SundfeltAdvisor: Leif HolmbergPurpose: Our purpose is to explain the cost-saving process that many municipality organisations face because of the global financial crisis.Limitations: We have limited our study to the municipality of Landskrona and Kristianstad.Method: Our study has a qualitative approach. By using open interviews we have been able to get an open dialog with our respondents.Theory: We have compared with different theories, such as Rombach?s budget-theory and Wildavsky?s role theory.Empirics: The material is based on interviews and conversations with key figures in different levels of the organisations in Landskrona and Kristianstad.Conclusions: The success of a cost-saving process depends on the engagement, awareness and how inclined to changes the persons in the organisations are. Has everybody the willingness to take responsibility fore the organisation and the changes that the surrounding world claims?.

Kartering av föroreningskällor i urbana avrinningsområden

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Specialpedagogens vardag : vision och verklighet

In this essay I follow the traditions of the continental didactics and use phenomenology and hermeneutics to examine how I, as a Special Educational Needs teacher, can develop my skills in making teachers adopt a more inclusive approach. The teachers and I have often got different agendas; I seek to change the teaching in order to fit the students, whereas the teachers wish for me to help the students manage the prevailing teaching practice. Traditionally this has been a task for the remedial teachers. In Sweden there is a difference, however a lack of clarity formally as well as practically, in the definition of these two professions, which indeed makes my assignment ever so challenging. One of the tools I have often applied is to plan and teach together with the teachers, to function as a role model.

En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Riskmodell för kabelsträckningar i mellanspänningsnätet i Sverige

The society of today is largely dependent on electricity and the dependence does not show any signs of declining. Reliability of supply will become increasingly important in the future and it is therefore important to investigate factors affecting the failure rates in electrical components.Sweden was hit by several severe storms during the 00?s. As a result of this many overhead lines in forests were cablified. In urban areas underground cable systems have been the norm for many years.

Volymsrapportering vid terrängtransport av virke

This report is a B.Sc. Forestry thesis work at the school for Forest Management, SLU. The work was an assignment from the forest owners? association Mellanskog. The aim of the work where to investigate the economical result of removing undergrowth trees before first thinning, and a follow-up of the contractors and their compliance with Mellanskog standards. This thesis work was divided in three parts: The first was to find a relation between the net volume from the first thinning and the cost of cleaning undergrowth trees. Secondly there was a follow-up in the field, to investigate whether the contractors have done the undergrowth cleaning according to Mellanskog?s directives.

Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Mjölkintäkt minus foderkostnad i mjölkproduktionen : en jämförelse mellan besättningar med fullfoder och separat utfodring

There are various arguments for using total mixed rations (TMR) or not. Cows can easily become fat and thus poorly utilize the feed while it can be stated that TMR also has a positive effect on cows? health and wellbeing as the rumen environment is more constant than when separate feeding is applied. Studies do show that that especially low yielding cows kept in groups get fatter when fed TMR. The overfeeding implicates higher feeding costs. This study included 10 herds where 5 had TMR and 5 hade separate feeding of forage and concentrates.

Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 28 Nästa sida ->