Sökresultat:
913 Uppsatser om Infant-feeding-plans - Sida 49 av 61
En studie av sex ISA-system
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
On the hunt for improvements : possibilities of increasing welfare in captive cheetahs through hunting enrichment
The cheetah (Acinonyx jubatus) is one of the big feline species kept in zoos worldwide. The wild populations are quite small and therefore the captive population make up an important part of the total population of the world. Although life in the wild is not always easy and a captive environment provides shelter and food it does not come without problems. In captivity cheetahs become chronically ill and also develop stereotypic behaviours. Neither of these are problems in wild populations and both can be linked to stress in captivity.
Dynamisk simulering av avfallskraftvärmeverk
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Effektiv fastighetsförvaltning : En beskrivande jämförelse av goda exempel i praktiken och tillämpliga teorier
Bachelor thesis within Business AdministrationTitle: Effective estate managementAuthor: Joacim StåhlPatrik StyrbjörnTutor: Gunnar WramsbyDate: 2008-06-05Subject terms: Estate management, efficiency, key figure, good examples, manager, real estate Abstract:Background: Concerning the global economy and the picture given in real estate business that efficiency and profitability are needed to survive is it intresting to study and search for good example to reach an effective and profitable estate management.Purpose: The purpose of the thesis is to describe the work of real estate concern to reach efficiency and profitability from the owner/manager perspective.Method: Through qualitative interviews with eight respondents in four different real estate concerns describe good examples on effective estate management and with this fulfil the purpose of this essay. Two interviews per company were made, one at the company and one over phone to reach better security concerning the answers.Theory: The theory is divided in to four mainparts were the first two explains estate management and financial control. Thereafter comes an impression concerning efficiency and how efficiency is secured in estate mangement from a theoratical perspective.Empiri: This part of the essay is about the interviews made and through them show how real estate concern works with efficiency by focusing on good examples in which the companys find themself efficient.Analysis: Comparing the theories and the empirical research to analys and try to describe efficient estate management.Conclusions: Efficient estate management is about controlling the costs and especially about the opreating costs. Important to reach operative efficiency is therefore to continuosly follow up the costs and to do readings every month. To compose and continuosly work with budget and action plans for each estate is important in order to reach efficiency in the management of estates.
Tillämpning av kNN-Sverige i Södra Skogs verksamhet : behovsinventering, databearbetning och förberedelse för praktisk implementering
The digital map product kNN-Sweden contains nationwide data of the country?s forest land. The estimated forest variables are mean age, mean tree height, volume per tree species and total volume. Today Södra Skog?s assessments of timber potentials are mainly based on experience rate and subjective assumptions.
Implementering av International Baccalureate Diploma Programme vid fyra skolor i Sverige : En utvärdering av motstånd och möjligheter
The aim of this essay is to analyze the implementation process of the International Baccalaureate?s Diploma Programme in four of the approximately 30 schools currently offering the IB at upper secondary level in Sweden. The starting point is a comparison between definitions in fundamental documents in the national programmes for Natural Science (NV) and Social Science (SP) on the one hand, and the IBDP on the other. The evaluation, based on Program theory, focuses in particular on the consistencies in the Organizational plans of each system. The basic assumption is that the IB due to a deviating organizational system, different structures, aims and objectives makes a challenge for the dominating educational discourse, to use a concept by Michel Foucault, and that resistance against the IB therefore is to be expected.As a second part of the evaluation five people who either play, or have played the role of coordinators of the IB, and who thereby are responsible for the implementation, have been interviewed. The questions have been focused around in what sense the informants can confirm resistance in their implementation work due to the differences found in the first part of the evaluation, and in what ways it manifests itself.Finally, Michel Foucault?s power structures in connection to discourse analysis have been applied on the results of the two previous parts of the essay.
Energianalys av Vikan Kross och Asfalt
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Rationell plattläggning. Studie av ett arbetsmoment
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Prognostisering av höga grundvattennivåer med Chalmersmodellen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Zakrisdal : Område i förvandling
Zakrisdal and the west coast region of Karlstad was at one time a protected area where the ammunition factory AmF Zakrisdal 1941-1994 was situated. This factory manufactured explosives for the Swedish armed forces and for export. In this context it is an interesting paradox that the production of ammunition, mines and armorpiercing grenades for more than 50 years has preserved the environment surrounding the factory.The factory is now gone and the production is moved to Karlskoga. Plans are being made to build housing for 3-4000 residents and other enterprises within the area. The area now stands before yet another change, most likely the most profound to date.The inspiration for this work comes from the economic historic Jan Jörnmark.
Bostadsbyggande i Skövde fram till år 2025
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.