Neutral bolagsskatt? : Analys om SOU 2014:40 skapar neutralitet mellan lånat och eget kapital

This paper examines the power producing dams along the Ume-river as an integral part of and a result from the urbanization process in Sweden during industrial capitalism. The aim of the paper is to contribute to the knowledge of the urbanization process in Sweden in general and of its traces along the Ume river in the county of Västerbotten in particular. The paper applies the theory of concentrated urbanization and extended urbanization put forward by Neil Brenner and Christian Schmid (2015) and argues that the building of power producing dams along the Ume-river is part of an extended urbanization process. This becomes particularly evident when examining the vast physical structures that is the dams, situated in an otherwise remote and sparsely populated area. These vast physical structures are also very well connected to a nation wide electric grid that has connections to bordering countries as well.

Energieffektivisering av modern tillbyggnad till äldre skola : fallstudie från Österbyskolan i Österbybruk

The Swedish government has introduced a goal to reduce the energy intensity by 20% to the year 2020. To reach this goal actions need to be taken throughout the energy sector which includes residential and commercial buildings. This thesis considers the possibility to reduce the energy usage in a building located close to Uppsala. The analyzed building is a combined office, cafeteria and entrance and was completed about half a year before this project started. Therefore the measures presented for a more energy efficient building are presented as measures for future constructions.Simulations have been made in VIP-Energy, a dynamic energy calculation program.

Kollaps av GC-bro S950 i Kil. En analys av brons verkningssätt

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

Dimensionering av en bågbro i limträ. Konstruktion och utformning

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

Uppföljning av förstärkningsobjekt utfört med aktiv design

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

Konsten att förutspå konjunkturen - Hur användbara är enkätbaserade snabbindikatorer?

Foreseeing future changes in economic activity is of up most importance to a wide array of actors. The time lag in the presentation of official GDP statistics means that to somewhat accurately capture a tendency of where the business cycle is heading one need turn to qualitative sentiment indicators such as Purchasing Managers? Index (PMI) and official sentiment indicators for valuable clues. This thesis uses in-sample and out-of-sample methods to evaluate how well PMI and official Business Tendency Surveys (BTS) in Sweden and Denmark fair against the year-on-year growth rate of industrial production. Moreover, various Swedish regional sentiment indicators get examined and a case study of the indicator for the Öresund region is performed.

Fuktens påverkan på utegipsskivor under byggtiden

This thesis is a study of humidity at Knauf Danogips external plasterboard. The study is performed at the building project Kv. Maskinen in Jönköping in cooperation with NCC Construction AB and Knauf Danogips. The measuring was performed during five winter/spring months to see how the weather influenced the plasterboard.The measuring was performed at a small two-storied building and a larger fourstoried building. From the buildings` placement were a couple of measuring dots selected and to get a good result was the dots located in the four cardinal points.

 En jämförelsestudie av koldioxidsläpp för en byggnad med trä- respektive betongstomme ur ett livscykelperspektiv

The goal with this examination thesis is to investigate the difference in carbon dioxide emissions between a building with a wooden versus concrete carcassing from a life cycle perspective. The huge amounts of carbon dioxide released into air from human activities must be reduced to prevent serious consequences. A way to limit this issue is through performing a comparative study where the result shows which of two products with the same function has the lowest emission of carbon dioxide, whereof the product with the lowest carbon dioxide pollution can be chosen.To be able to perform a study like this an object has been chosen and studies about life cycle analyses have been done. The rental square meter, the thermal conductivity value, the energy requirements and the placement of the building has been set equal in both framework types. There were solely dissimilarities of the two buildings taken into account when this comparison study was performed.The result of the study is that a building constructed with a wooden carcassing has the lowest amount of carbon dioxide emissions.

Energieffektivisering av fastighet från 1930-talet : Utredning av energianvändningen och energieffektiviseringsåtgärder för Tången 2

Tången 2 is a building situated in Stockholm, Sweden. It´s built in the 1930s and contains both residences and businesses. The property owner, Diligentia AB, wants to lower the energy use in Tången 2. This report consists of an energy audit which clarifies the specific circumstances linked to Tången 2. Collected knowledge is then used, together with the results from the literature study, to decide energy measures to proceed with.

ABL:s utvidgade värdeöverföringsregler då ett aktiebolag är komplementär i ett kommanditbolag : Utgångspunkt ur NJA 2014 s. 604

This paper examines the power producing dams along the Ume-river as an integral part of and a result from the urbanization process in Sweden during industrial capitalism. The aim of the paper is to contribute to the knowledge of the urbanization process in Sweden in general and of its traces along the Ume river in the county of Västerbotten in particular. The paper applies the theory of concentrated urbanization and extended urbanization put forward by Neil Brenner and Christian Schmid (2015) and argues that the building of power producing dams along the Ume-river is part of an extended urbanization process. This becomes particularly evident when examining the vast physical structures that is the dams, situated in an otherwise remote and sparsely populated area. These vast physical structures are also very well connected to a nation wide electric grid that has connections to bordering countries as well.

Dimensionering och konstruktion av Villa X

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

A-måttet - En slitageanalys på spårvägsrälsen i Göteborg

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

Lägenhetsskiljande massivträbjälklag Projektering av bjälklag med förbättrade ljudisolerande egenskaper

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

Lågenergihus : Att bygga energisnålt

A large proportion of the energy consumption is in the building industry and a large part goes to heating our homes and premises. In the developing countries' development now threatens the large consumption of energy in our earth's climate. It is in the West world that we must be good role models in terms of energy efficiency. One solution to reduce energy consumption for heating of buildings may be to continue to build low energy houses and passive houses, but it is also about rebuilding the buildings that currently have high energy consumption such as the old Million program Houses. These buildings will be standing many years and their energy consumption will not diminish over time by itself and energy prices will certainly not diminish in the future.

Vägförvaltningssystem. Sammanställning i databas av system från Vägverket och kommunerna i Sverige

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.