Sökresultat:
8093 Uppsatser om Indirect operator time - Sida 43 av 540
Capacity studies on DeLavals sort gate DSG10
In the dairy production it is necessary to be able to sort cows. Dairy cows are sorted for many different reasons i.e. regrouping into production strings or for treatments i.e. inseminations, pregnancy and health checks, vaccinations or hoof trimmings. One labour saving way of conducting sorting is by using an automatic sort gate.
Skogsentreprenad idag och i framtiden : en kvalitativ studie av skogsmaskinentreprenörersverksamhet och framtidsvisioner
The Department of Forest Products and Management, Swedish University of Agricultural Sciences has received means from Vinnova for a preliminary study of the organisation of logging work of today and how a better logging organisation should be brought about. This thesis reports results from qualitative interviews with nine forest machine contractors regarding the situation of their companies. The interviews have been analysed with respect to the genesis of the companies, which tasks they perform or that they could consider perform-ing, business relationships of the companies, relationships between the different partners of the companies, and the state of competition experienced by the contractors. The companies have developed either from the contractor previously being machine operator employee or from that the contractor in making has owned a machine and needed work. Their primary business is mechanised logging.
Byte av kontaktdonsgränssnitt för Scania bromssystem
This master thesis was carried out at Scania in Södertälje, Sweden. It investigates the possibility of changing a connector interface that is used when there is a need for splicing the wheel speed sensor and thereby determine the consequences.The problems that exist with the current connector interface occur during assembly, as more time is required to complete a connection in a reliable manner. A complete connection requires joining the male and female connector, insert the connection into a protective retainer and then strap a cable tie on each end of the retainer. This process makes it more time consuming and it requires 20-30 seconds to complete the connection. Solving this problem would save time and enable easier assembly, therefore resulting in economical benefits.This thesis was accomplished through discussions with different sections at Scania, studying available documentations, observations during assembly, writing a requirement specification and contacting suppliers.The aforementioned methods resulted in four connector suggestions, the DT and DTMH connector from Deutsch, MCON connector from TE connectivity and MLK connector from Kostal, each of them compliant with the set demands of the surrounding environment.
Projektplanering inom konsultföretag : en modell för planering, budgetering och uppföljning
BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.
Optimizing amount of straw for growing-finishing pigs : considering time spent in manipulative behaviour
In support to a decision to be made by the Swedish central competent authority on a minimal amount of straw for conventional growing-finishing pigs, a study using 168 pigs provided 7 different amounts of straw (20, 40, 60, 80, 100, 200 or 300 grams/pig/day) was performed. The straw was provided either once or four times per day. Detailed behaviour observations were made using focal animal sampling and continuous recording for one hour between 9 and 10 am and again between 3 and 4 pm. The data analysis is presented in three ways: broken stick model, polynomial trend line and logarithmic trend line. No method was suitable on its own but the use of all the methods simultaneously was found to portray the data in the best way.No significant differences were found when comparing pens provided with straw once or four times per day.
Införande och systemanpassning av Process Engineer i målerifabriken, Saab Automobile AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Vad är ett lyckat projekt ur ett intressentperspektiv? : En studie av Trainee in TIME
AbstractThe concept project is today used in several contexts and has different meaning in different contexts. Lately, projects have been seen as a form of organization and more companies convert from traditional organizing to organizing in a project form. The purpose and focus of today?s project is not only to increase quality and competence development for management but also to integrate different actors in order to e.g. increase customer value.LänsTeknikCentrum AB (LTC) in Jönköping is running different projects in order to support companies in Jönköping County.
?I valet och kvalet? Urvals- och inköpsstrategier på svenska folkbibliotek
This essay focuses on strategies for acquisitions in Swedish publiclibraries. The topic has been occuring in the public debate off andon since the70s. The dominant view has been that librarians haveallowed demand direct the purchases of media and thus haveignored quality literature.This debate has caused me to reflect on the librarians constantdilemma when purchasing media. Are they supposed to chooseliterature that are in demand, or should an evaluation made bylibrarians be the decisive?The previous research has shown that the library profession istraditionally characterized by a non-judgmental approach.
Automatisk rengöring av Primary Charge Roller : Invegon Equip AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
En friskare arbetsplats : Faktorer som påverkar vi friskvårdsarbete
Bakgrunden till undersökningen är att arbetsplatsen är en viktig arena att arbeta hälsofrämjande på, eftersom en stor del av befolkningen nås via denna och olika hälsobeteenden kan påverkas innan ohälsa uppstår. En framgångsrik strategi för att skapa hälsosammare arbetsplatser är att arbeta med friskvård. Om människor ska kunna leva hälsosamt krävs att de får möjlighet att göra det även på arbetsplatsen, då hälsa bör ses ur ett helhetsperspektiv. EduTainer har utarbetat en metod för att arbeta med friskvård på företag. Ett företag som arbetat efter denna metod, med gott resultat, är Måleriproduktion AB.
INFORMATIONSSYSTEM FÖR PALLHANTERING : Pallet management software
BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.
Ständiga förbättringar hos Drive Sol Worldwide AB
The purpose with this report is to give structure to the storage area betweenproduction and packaging at Spaljisten AB in Åseda. The purpose is also to givesuggestions for improvements of work tasks and thereby simplify and improve thematerial handling at the packing process.The background of the task is that Spaljisten AB is going to increase theirproduction and thereby they also need to increase the packing rate of theirproducts. They will manage this by installing a new automated packing line andincrease the efficiency of the old manual one. The theoretical background ismostly obtained from literature which contains relevant facts for our report.The storage area has been studied visually in order to search for improvements oftoday?s layout.
Design och implementation av konfigurationsverktyg för funktionsblock
Abstract In high voltage substations there is an increasing demand for computerized equipment, and automation of operation and supervision. The future primary equipment will provide the possibility to collect more information and to provide better control for improved effectiveness. Since ABB has got a large customer target, each product must be custom made to fulfil the customers (often from different countries) demands. Later these products will be configured by engineers who may not be familiar with the tools used at ABB. This is a very expensive and time consuming.
RA Detect - Antikollisionsskydd förlantbrukssektorn
SecRePac is a household appliance that simplifies sorting of packaging such as milk, juice and yogurt containers. By shredding the packages SecRePac reduces its volume uptake both in the home and at the recycling station. This leads to minimization of both transports to the recycling stations and truck transport for emptying the containers at the recycling station.The greenhouse effect deteriorates and becomes worse and worse leading to extreme climate changes and natural disasters such as floods as an example. Carbon dioxide emissions are the major reason for this and at least 30 percent of all these emissions come directly from transports. In the EU carbon emissions has decreased in the past few years.
Nedskräpade återvinningsstationer - En studie om fördelning av ansvar
In Sweden, responsibility for the collection and recycling of packaging and newspapers lies with the producers. Therefore, the major producers created a jointcollection with 5800 recycling stations. The stations are the responsibility of a coordinating body, Förpacknings och Tidningsinsamlingen (FTI) which ensures Government regulations are adhered to by the producers.In 2006, the Swedish Environmental Protection Agency (EPA) carried out an evaluation of the collection of packaging and newspapers. EPA´s research showedthat 80 percent of households were satisfied with the collection but that there were also shortcomings, including problems with littering at the recycling stations.We have tried to approach the litter issue from different angles in order to suggestpossible measures to reduce the problem. An important aspect proved to be uncertainties regarding the concept of operators.As there are currently many parties involved in the collection process this lead to the issue of who is legally considered as the operator of the recycling stations.