Sökresultat:
1825 Uppsatser om Hydraulic transport capacity - Sida 1 av 122
Grundvattenmodellering i Badelundaåsen
Over an extended period of time there have been plans to establish a shared facility in Lennheden to extract groundwater from the Badelunda esker to provide drinking water for the cities of Borlänge and Falun. The city of Falun is dissatisfied with the quality of its drinking water and the city of Borlänge is concerned about the risk of contamination of its existing groundwater supply at its current location. To provide a basis for a decision on this issue, the company Midvatten AB has been commissioned to perform hydrogeological investigations in the area of Lennheden.The purpose of this thesis is to design a functional groundwater model of the area between Lennheden, place of planned extraction, and Övre Tjärna, place of existing extraction, to get a better understanding of the groundwater situation in the area. A groundwater model enables simulations of different scenarios in risk assessment and contaminant transport. The aim of the thesis is that the model can be used as an aid in Midvatten?s investigations in Lennheden and that it also can be used in future projects in the area.The model has been made in Processing Modflow 5.3 and encompasses an area of 19,5 × 11 km along the Badelunda esker and the river Dalälven between Djurmo and Frostbrunnsdalen.
Energivinst vid hybridisering av hydrauliskt system
Today's high oil prices and more stringent environmental requirements have led to that manufacturers of mobile construction equipment try to make their products more energy efficient. With this in mind a project about hybridization of hydraulic systems has been formed. The purpose of this project was to analyze the savings that can be achieved by hybridization of hydraulic systems. A reach stacker truck (Kalmar DRD450-80S4XS) were simulated in some load cases with conventional hydraulic systems and with three types of hybridized hydraulic systems. Different parts of the hydraulic systems were also analyzed separately.
Skogsåkeriägares inställning till organisationsförändringar :
There are two groups of haulage contractors in roundwood transport , those who are contracted direct by the transport buyer and those who are connected to a freight company which in its turn is contracted by the transport buyer. Today the roundwood haulage is dominated by contractors with one to two lorries. The effort of coordinating transportation for a transport buyer is dependent on how many communication contacts that must be managed (how many individual haulage contractors the transport buyer has to work with). A structural change in the sector that leads to a decrease in the number of haulage contractors but an increase in the capacity of each contractor, makes it possible for a transport buyer to coordinate transports with fewer communication contacts. The reason why a company reaches a certain size can be explained by the number of contracts it makes and manages.
Vätning på mikroskala
Individual cellulose ?bers were studied to identify the transport and absorbtion phenomena as well as the in?uence of drying. A Chalmers University of Technologydeveloped method within ESEM (Enviromental Scanning Electron Microscope) has been used in this study. The results from the laborations gave the following conclu-sions: The transport of water occurs in ?bers in the ?ber wall surface and the lumen.
Styrtransmission för bandfordon
The purpose of this master thesis is to construct a steering transmission, for a trackedvehicle, containing two hydraulic circuits which are connected. The steeringtransmission should be mechanical to avoid steer-by-wire.BAE Systems Hägglunds has in an earlier study examined a system with two hydraulicpumps and one hydraulic motor, but the safety of the system wasn?t sufficient.To achieve sufficient redundancy there must be two hydraulic motors, which arecontrolled separately. When the two systems are connected in one point, this point is acritical part of the system because it directly affects both circuits. If one of the hydrauliccircuits fails the other should be able to operate independently as a steeringtransmission.
Transporttidsmodellering vid provpumpning i heterogen jord : spårämnesförsök i en isälvsavlagring
When protection zones for wells are delineated, it is important to acquire good knowledge about possible travel time from different points in the catchment area to the well. Often, simple analytical methods are used for estimating travel times and the assumption is made that the hydraulic conductivity is relatively homogenous within the aquifer. Nevertheless, many aquifers are strongly heterogeneous which may lead to differences between estimates and actual travel times. As a part of the process to develop improved methods for delineating protection zones for groundwater supply wells, a tracer experiment was performed in a glaciofluvial esker formation in Järlåsa. On the basis of the experiment, a numerical flow model was created for the test site.The purpose of this master?s thesis was to apply the flow model to an aquifer where the hydraulic conductivity shows great variability and should be described by a stochastic distribution.
Sensor för hydraulolja
This is the final documentation of the basis that can be the foundation of how to solve theproblem with leaking hydraulic oil in a shoe press at the company Albany InternationalAB in Halmstad, Sweden.The project has been performed at Halmstad University as a degree project commissionedby Albany International AB. The purpose of the degree project was to find a way ofdetecting the hydraulic leak of a shoe press. The reason is that the shoe press runsunattended during nights and weekends, this can cause an extensive decontaminationwork and production stop if leak. The hydraulic oil could be leaking in large amounts orslowly as a fine mist. The development of a working system that can detect a hydraulicoil leak and stop the machine before a large amount of hydraulic oil leaks out wouldconsiderably reduce the cost of the decontamination work.
Buntning av grot med lastbilsmonterad utrustning :
During the transportation of logging residues (LR) the material´s low density is a problem that results in low use of pay-load capacity. Comminution or compression of LR are possible methods to increase pay-loads. In the present thesis studied a bundling machine which was mounted on a truck chassis, and the subsequent transport and crushing. The truck bundler created bundles that were larger and longer than other bundling equipment on the market. The objectives were to determine the total time consumption and its allocation over work element and machinery, to measure dry matter (DM) content of green and brown LR-bundles.
Provning av parallellkopplade hydraulpumpar i hjullastare
Volvo Construction Equipment is a world leading company in construction machinery. Tomaintain the best products, development is prioritized. The master thesis regards sound reductionof the hydraulic system on a wheel loader. The background to the master thesis is asimulation made on the hydraulic system, performed autumn 2005. The result of the simulationshows that the energy of the pressure ripple is reduced when the paralleled hydraulicpumps are phase shifted and reduces each others pump pulsations.
Geografisk prioritering av CTI-utrustad virkestransportkapacitet
Previous studies of central tire inflation (CTI) in truck transport of roundwood have shown potential benefits to include more even wood flow and reduced road damage. The greatest benefits are found to be during periods of low bearing capacity such as spring thaw. No previous studies have examined geographical variations in the potential benefit of CTI-equipped trucks. The aim of the study was to develop and use a simple method for geographically prioritizing the use of CTI-equipped trucks within a forest company´s sector of activity.The host company for the study was Holmen Skog. The area studied consisted of Holmen Skog?s entire sector of activity extending from the province of Västerbotten to the province of Småland.
Föroreningsspridning via ledningsgravar : en fältstudie på Köpmanholmens industriområde
Sewer trenches usually contain material with a higher hydraulic conductivity then the adjacent soil. Thus they can serve as paths of preferential flow in a polluted area. Wastewater from factories can also leak from wastewater pipes and pollute the soil in the sewer trenches.The purpose of this project was to investigate pollutions in sewer trenches and in sewer pipes in the industrial area of Köpmanholmen, 20 km south of Örnsköldsvik in the north of Sweden. To make an estimation concerning the potential of transport of pollutions in sewer trenches, hydrological calculations were performed.Leakage to any greater extent did not seem to be a problem in the area. This is the case both for the concrete and the wooden pipes that have served as factory wastewater pipes.
Busshållplatsers kapacitet : Utvärdering av tillämpbarhet av modell från Highway Capacity Manual 2000 med uinderlag från busstrafik i Stockholms innerstad
Stockholm is growing with almost two fully loaded SL-buses a day. One of the consequences that derive from this is the increase of public transport travelers who put the regionally governed public transport up to the test in terms of its capacity. The Transport administration in Stockholm County initiated 2015 a project with the purpose of simplifying the calculation of bus stop capacities. A hypothesis (set up by the Transport administration) based on that a model for calculation of bus stop capacities could be calibrated for Stockholm conditions is being researched in this bachelor?s essay.The study is implemented by self-collected traffic data from bus stops located in the Stockholm city center.
Två nya trailerkoncept för transport av rundvirke hos Stora Enso : en analys av prestation och flexibilitet
The need for roundwood transport capacity vary throughout the year. The need during a period is influenced mainly by the volume transported the period, the number of days during which transport can be carried out, seasonal variations in road conditions and the weight of the roundwood, and the origin of the wood (private forest owners/ forest companies). The need for transport capacity generally increase during the winter and in spring, after thawing. Lack of logging trucks combined with a lack of drivers for these trucks make it hard to hire extra help during periods of increased transport capacity needs. It is also very expensive to keep logging trucks for use only during these periods.
In this thesis, two new concepts based on the partial transport by truck tractors have been examined, to find out the possibility for increased performance and flexibility.
Skattning av den integrerade hydrauliska konduktivitetens variation kring Tunåsens infiltrationsanläggning : En utredning av påverkan från möjliga osäkerheter i befintlig information
Estimation of the variation in the integrated hydraulic conductivity around the Tunåsen infiltration facility - An investigation of the effects of uncertainties in existing informationAlmost half of Sweden?s drinking water volume is produced from groundwater. The main fraction of this is extracted from eskers, some of which allow for very large extraction rates. Despite this, the groundwater volume is not sufficient in some areas. This has led to an extensive use of artificial recharge.In Uppsala, the total volume added through artificial recharge is divided between four infiltration facilities.
Planseparerad spårtrafik i Göteborg
The City of Gothenburg has an urgent need to upgrade its public transport. The capacity of its light rail transit (LRT) has reached maximum capacity within the inner city limits years ago. The construction of an underground metro will be very expensive and time consuming due to the soft clay beneath the city. The apparent need of developing another type of mass rapid transit (MRT) is urgent. An elevated metro have turned out to be a success in Greater Vancouver, but is it possible for the system to operate well in Gothenburg with its narrow streets and current land use; will its route coexist with the current LRT or will the noise disturb people too much?.