Sökresultat:
4540 Uppsatser om High-voltage connector - Sida 5 av 303
Konstruktion av förstärkare och insamplingssteg till en PSAADC i 0.25 um CMOS
The aim and goal of this work has been to design and implement a voltage reference network for a 12-bit PSAADC, Parallell Successive Analog to Digital Converter. A chip containing the design has been sent away for fabrication. Because of the long processing time, no measurement data are presented. The main specifications for the voltage reference generator is to generate stable reference voltages with low noise and a good PSRR. Efforts has also been made to minimize the power consumption..
Frekvens och spanningsskalning i en inbyggd mikroprocessor; for att mojliggora implementationen av schemalaggning med stod for dynamisk frekvens- och spanningsreglering for energihantering.
Minimizing power consumption is a critical part of many embedded design projects. Thechallenge is to limit the power consumption of the system and at the same time providesatisfactory service to the user. With regards to microprocessors, the main way of limiting powerconsumption during program execution is to adjust the frequency and the voltage at which theprocessor operates.To enable the implementation of real-time scheduling with support for dynamic voltage andfrequency scaling, an exhaustive study of the Freescale i.MX31 embedded microprocessor isperformed. Specifically, the power consumption relationship to all relevant frequency andvoltage settings is investigated. In addition, to enable frequency and voltage scaling in a real-timeenvironment, a complete timing analysis of proposed voltage and frequency scaling methods isperformed and their suitability for use in real-time systems is evaluated.To integrate voltage and frequency scaling capability into OSE RTOS, a software module hasbeen developed for this operating system.
Selektivitet mellan hög- och lågspänningssäkringar ? I anläggningar med transformatorer ? 500 kVA
Göteborg Energi AB är ett bolag med höga ambitioner att säkerställa ett stabilt distributionsnät för sina kunder. Med ett säkerställande följer åtgärder i form av beräkningar för komponenter som transformatorer av olika märkeffekt, hög- och lågspänningssäkringar och andra kritiska skyddsanordningar som t.ex. reläskydd. Vid ett flertal tillfällen under de senaste åren har det uppmärksammats en problematik där ett fel i lågspänningsnätet har löst ut anslutande transformator. Felet har grundat sig en svag selektivitet mellan transformatorsäkring och lågspänningssäkring.
Implementing a receiver in a fast data transfer system : A feasibility study
This report is an outcome of a master degree project at Linköpings University in co-operation with Micronic Laser Systems AB. The purpose with this master degree project was to investigate how to implement a receiver in a data transfer system. The system consists of several data channels, where every channel consists of three parts: driver, transmission lines and receiver. The driver send low amplitude differential signals via the transmission lines to the receiver that amplifies and converts it to a single-ended signal. The receiver has to be fast and be able to feed an output signal with high voltage swing.
Pilotinstallation av fast och fjärravläst nätstationsmätning : Identifiering av för- och nackdelar med nätstationsmätning, Mälarenergi Elnät AB
Today?s electrical grid companies understand that better knowledge of and information about their grid can help realize a smart grid network. One way to gain better knowledge and information about the low voltage network is to install measuring equipment on the substation transformer´s secondary low voltage side that measures the low voltage network losses for that specific substation. By doing so, grid companies can, due to the calculation of the low voltage network losses, identify and address issues such as illegal power dissipation, unmeasured power outtakes, and unsatisfied technical documentation for the substations low voltage network.During 2012, Mälarenergi Elnät AB had a total electrical network loss (both medium and low voltage network losses included) of three to four percent of their total distributed electrical volume. Converting this energy volume into a monetary figure this accounts for a loss of around 30 million Swedish crowns.
En studie av sex ISA-system
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Dynamisk simulering av avfallskraftvärmeverk
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Prognostisering av höga grundvattennivåer med Chalmersmodellen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Rationell plattläggning. Studie av ett arbetsmoment
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av Vikan Kross och Asfalt
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Bostadsbyggande i Skövde fram till år 2025
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.