Implementing a receiver in a fast data transfer system : A feasibility study

This report is an outcome of a master degree project at Linköpings University in co-operation with Micronic Laser Systems AB. The purpose with this master degree project was to investigate how to implement a receiver in a data transfer system. The system consists of several data channels, where every channel consists of three parts: driver, transmission lines and receiver. The driver send low amplitude differential signals via the transmission lines to the receiver that amplifies and converts it to a single-ended signal. The receiver has to be fast and be able to feed an output signal with High voltage swing.

Pilotinstallation av fast och fjärravläst nätstationsmätning : Identifiering av för- och nackdelar med nätstationsmätning, Mälarenergi Elnät AB

Today?s electrical grid companies understand that better knowledge of and information about their grid can help realize a smart grid network. One way to gain better knowledge and information about the low voltage network is to install measuring equipment on the substation transformer´s secondary low voltage side that measures the low voltage network losses for that specific substation. By doing so, grid companies can, due to the calculation of the low voltage network losses, identify and address issues such as illegal power dissipation, unmeasured power outtakes, and unsatisfied technical documentation for the substations low voltage network.During 2012, Mälarenergi Elnät AB had a total electrical network loss (both medium and low voltage network losses included) of three to four percent of their total distributed electrical volume. Converting this energy volume into a monetary figure this accounts for a loss of around 30 million Swedish crowns.

En studie av sex ISA-system

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Prognostisering av höga grundvattennivåer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Bostadsbyggande i Skövde fram till år 2025

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Strategier hos de stora svenska byggföretagen 1992-2006

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.