Sök:

Sökresultat:

1564 Uppsatser om Heating water - Sida 3 av 105

Ljudisolering i prefabricerade betongstommar. En fältmätning av luft- och stegljudsisolering.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Varmt Sköljvatten

In cooperate with Asko Cylinda we have developed a new heat system too short the processtime and reduce the energy consume in a dishwasher and still have it too be a class AAA.The environment and quality is important for the company too still be the number one onthe market, If they want too keep that position the product developed of new innovations willbe very important. The systems we have developed are more effective and reduce energy uptoo 25 %. The process time is reduced too less than two hours, from the today two andhalf-hour. The solutions are too heat up the rinse water and the dishwater at the same time,with a new heating system and it make are solutions unique and effective. Its good for thedish and the environment.

Skadliga nollflödespunkter i Fortum Värmes fjärrvärmenät i Stockholm : En analys av dess förekomst och effekter

When several production units provide a district heating network, water is pumped from different directions. When the flows from the plants finally meet in the network, the water can be completely still. These places are called zero flow zones. In district heating networks with several plants, which also have different supply temperatures, large and frequent temperature fluctuations can occur when the zero flow zones move. This may cause wear on the pipes, a phenomenon called low cycle fatigue.For this reason it is important to examine where and when zero flow zones that cause temperature changes occur.

Energikartläggning av biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production.The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with thenmeasured time of usage.

Energikartläggning vid biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production. The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with the measured time of usage.

Uttorkningsmöjligheter i ett fuktskadat badrum med hjälp av spaltmetoden

Buildings today are built to maintain a healthy indoor environment and an efficient energy usage which is probably why damages caused by dampness has increased since the 1960?s.A study between year 2008 and 2010 showed that 26 percent of the 110 000 examined houses had damages and flaws caused by dampness that could prove to be harmful later on. This means that one out of four bathrooms risk the chance to develop damages by dampness. Approximately 2 percent of the houses had already developed water damages. It is here where the problems appear.

Luft/luftvärmepump : - Med möjlighet till återvinning

Sweden has long had access to low electricity prices due to the wide availability of hydro and nuclear power. This has now changed because of today's rising electricity rates resulting in increasing heating costs for properties, especially in the properties with electric heating systems."Ankaret" is a parish for "Svenska Alliansmissionen", which is located at "Gullbrannagården".The parish has installed electrical radiators and an exhaust ventilation system that makes the energy demand high due to the large ventilation flows. The building was built as the price of electricity was still low and would reduce energy use today by combining its heating system with an air/air heat pump. The heat pump delivers more heat into the room than the electrical energy that it uses. This lowers the electricity needs.

Fällning av kisel från avloppsvatten vid Hellisheidarvirkjun - experimentell studie

This report is about the experiments with mixing of the separated water and the vacuum pump seal water at Hellisheiði power plant. This is done to prevent silica scaling and clogging in pipes and reinjection wells as well as eliminating vacuum pump seal water from the plant. The experiments were done in four stages: the first stage comprised of tests with different flows of separated water at 70°C, the second stage was carried out by mixing the separated water at 70°C and the seal water with different amounts of the seal water, the third and the fourth stages were like the first and second but with the separated water at 120°C. The results show that this method is good if the mixture is around 50/50 separated water and seal water, to control the silica scaling in the separated water and to be able to reinject the seal water with the separated water. This does not eliminate the silica scaling in all of the separated water because the amount of separated water is much more than the amount of seal water that comes from the plant. .

Småhuset ? val av bergvärme, fjärrvärme eller pellets

This thesis describes the new construction of a small house and it includes studies of three heating systems: geothermal heating, district heating and pellet. The purpose of this thesis is to project a small house which can manage Building Regulations, BBR conditions and then examine three possible heating systems for the small house. This thesis is a literature study which gives an understanding of the heating systems technical structure, properties and costs. An empirical study completes the literature study by giving a deeper understanding of district heating costs and pellet costs. The empirical study contains two interviews, one of which was conducted in a district heating corporation and the other interview was conducted in a pellet corporation.

Bergkyla och bergvärmeutredning för industrilokalen Rödbergsmyran 5 i Umeå, Västerbotten.

Grubbe Ventilation AB is a sheet metal and ventilation company who provides design, installation, service, and repair of ventilation. The company is expanding their business by building a new facility in Umeå, Västerbotten. The property is designed to be used for both office and industrial work.Grubbe Ventelation AB has not yet decided upon wish system which is to be established to provide the building with heating and cooling. The consulting firm Umeå Projekt Team has therefore been asked to investigate the possibilities to invest in geothermal- heating and cooling.If the investigation of a geothermal heating- and cooling system would provide favorable results it would be a very appropriate alternative that provides energy at low costs and are an environmentally friendly option as the energy comes from stored solar energy in the ground is provided by stored solar energy in the ground.The facility ´s heating and cooling consumptions are calculated in the program BV2 and the result indicate a heating demand of 185 000 kWh per year due to thermal transmittance, transmission losses, heating of warm water and a cooling requirement of 5500 kWh.Three different systems of geothermal heating and cooling were tested in the computer program Energy Earth Design. The results show no difference in the dimensioning of the drill hole if merely heating were to be used or both heating and cooling were to be established.

Solvärme på Utö

The guest harbor on Utö, Utö Gästhamn, is currently using electricity for heating all of the water used in the showers and taps. Because of the large amount of visitors, especially during the summer months, the hot water usage gets very high and that is also the case for the electrical bills. During the year of 2011 the cost of electricity for Utö Gästhamn reached a total of 257 500 kr. Out of these 257 500 kr approximately 142 000 kr, 55 % of the total cost, were because of the water heating.The report is the result of a cooperation with Skärgårdsstiftelsen, the Green Islands-project and Utö Gästhamn where the mutual goal is to dimension a solar energy system, to promote the sustainable development.Initially the different techniques for the solar energy system are researched. The techniques are plane solar collectors, evacuated tube collectors, pool collectors and photovoltaic cells.

Solenergi : en lönsam investering för ett lantbruk?

A possible way to reduce pollution and slow down the process of global warming is to increase the usage of renewable energy sources. One of these renewable energy sources is solar power. With the aid of solar panels and solar cells the energy from the sun can be transformed into both heating and electricity. The requirement to use the sun in this fashion is a suitable surface, for example a big roof, an angle between 40-60 degrees and that the surface should be exposed to the south. Almost every farm meets these requirements.

Metoder för lastprioritering i fjärrvärmecentraler

A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district Heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.

Energieffektivisering av skolbyggnad från 60-talet : Studie av Hållsta skola i Eskilstuna

In June 2006 the Swedish government decided that the use of energy in buildings should be reduced by 20 percent until 2020, compared to the level of energy used in 1995. To contribute to this goal, the real estate company ?Eskilstuna Kommunfastigheter AB?, set up own goals for their buildings. In 2009, the goal for schools was to have a maximum energy use of 118 kWh/m2year for heating and hot water.The school ?Hållsta skola?, just south of Eskilstuna, exceeds the limit since it used 270 kWh in 2008.

Utveckling av ny produktfamilj med handskar för användare inom street- outdoor segmentet. : En liten bit av naturen till staden, en liten bit av staden till naturen

This thesis describes the new construction of a small house and it includes studies of three heating systems: geothermal heating, district heating and pellet. The purpose of this thesis is to project a small house which can manage Building Regulations, BBR conditions and then examine three possible heating systems for the small house. This thesis is a literature study which gives an understanding of the heating systems technical structure, properties and costs. An empirical study completes the literature study by giving a deeper understanding of district heating costs and pellet costs. The empirical study contains two interviews, one of which was conducted in a district heating corporation and the other interview was conducted in a pellet corporation.

<- Föregående sida 3 Nästa sida ->