Sök:

Sökresultat:

3173 Uppsatser om Heating systems - Sida 9 av 212

Energivinst vid hybridisering av hydrauliskt system

Today's high oil prices and more stringent environmental requirements have led to that manufacturers of mobile construction equipment try to make their products more energy efficient. With this in mind a project about hybridization of hydraulic systems has been formed. The purpose of this project was to analyze the savings that can be achieved by hybridization of hydraulic systems. A reach stacker truck (Kalmar DRD450-80S4XS) were simulated in some load cases with conventional hydraulic systems and with three types of hybridized hydraulic systems. Different parts of the hydraulic systems were also analyzed separately.

Analys av energiförbrukning, Akzo Nobel Functional Chemicals AB

The main purpose of this project was to make a survey of the steam and electricity consumption at Akzo Nobel Functional Chemistry AB and give suggestions of how to minimize them. These three different areas were focused on. First to make a survey of all the most important consumers, second to find the electricity consumption of the air compressors and the amount of waste heat produced from them. The third area was to calculate a model of how much fresh water that is used during a cooling sequence in the water based heating/cooling system of the reactors and give a suggestion of a suitable reuse for this water.The main result is a total survey of the energy consumption in steam and electricity. The survey shows that the second largest group after drying is heating of ventilation which gives big potentials of reducing the total steam consumption if there is a way of being self supporting in ventilation heat.

OSE och Linux : En studie om prestanda

There are some key elements which distinguish a general operating system, such as Linux, from a Real Time operating system, such as OSE. The later belongs to the category of soft Real Time systems while Linux is a general operating system, with significantly improved real time properties after version 2.6. These improvements make it interesting to compare the two systems.When comparing two operating systems, there are a number of issues which have to be considered. One way to measure the performance of the systems is by studying the time consumption for the same functionality and hardware.During the study, the items that appeared as the most important for the performance of the systems, were: process primitives, system primitives, interprocess communication, context switches and interrupt latency.This work demonstrates that it is possible and reasonable to do performance testing on two different operating systems. The implemented tests cover a number of basic functionalities, which appeared to be the most crucial ones for the performance of the systems..

Geotermi i Ungern : Undersökning av Ungerns energisituation inriktat på geotermi samt kapacitetsfaktorn för det största geotermiska värmeverket i Mellaneuropa.

Hungary?s share of renewable energy in 2010 was 7.9 %, and their renewable energy goal for 2020 is 14.65 %. Geothermal energy is one option that could help to achieve the goal, since Hungary has favorable bedrock, the temperature gradient is above average and thepermeability is high. Today Hungary is importing just over half of its primary energy supply. Because of political conflicts between nations Hungary wants to expand its own production of energy.

TILLFÄLLIGA EFFEKTTOPPAR I FJÄRRVÄRMEN : Kan man med hjälp av lagrad värme undvika att de uppstår i betonghus?

Climate and environmental issues is now high on the agenda. We live in a generation that must try to solve some major environmental problems. Buildings and habitations account for approximately 40 % of Sweden's total energy today. To reduce this figure, as needed, more research in the field of energy efficiency is required.This thesis concerns the heating of buildings. The load on district heating is heavy during certain times of the day.

Energikartläggning vid biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production. The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with the measured time of usage.

Energikartläggning av biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production.The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with thenmeasured time of usage.

Geotermisk fjärrvärme i Gunsta

Gunsta is situated about 10 km east of Uppsala. Today there are plans to establish 1000 new households in Gunsta before year 2030. The required energy for heating houses and water would be distributed via a district heating system, which also includes 200 existing residences. The annual required energy, according to this study, would be 16.2 GWh with a maximal peak effect of 6.9 MW. To meet this need, the study suggests a system with heat pumps to upgrade the 31?C water from a 1.8 kilometre deep borehole.

Den ekonomiska lönsamheten för solvärme i Sverige

The sun is an endless energy source and the heat it produces can be used to heatup our homes. This technology is relatively old and was introduced in the late70-s. There are two kinds of solar collectors that are most frequently used todayand these are plain solar collectors and vacuum solar collectors. The plain solarcollectors are the once that are used the most but the vacuum solar collectorshave increased more as a percentage the last couple of years.The biggest question asked regarding an investment in solar heating is if theplant is economically profitable. This question has no direct answer because itis dependent on a couple of prerequisites.

 Solenergi En del i ett långsiktigt, hållbart byggande

The sun is essential to life on earth and no matter where you are, there is a constant need ofenergy. Nearly 800 000 years ago man learned for the first time to use fire in a controlled way.Since then, fire has given us the opportunity to inhabit places despite a cold climate. In Swedenthe resident sector accounts for a major part of the total consumption of energy. In a time whenenvironmental issues and greenhouse effects are increasing, we also see a future of rising energyprices. With this perspective, we have in this bachelor thesis in the Building Environment at theRoyal Institute of Technology, KTH, in Stockholm decided to focus on the renewable energysource, solar energy.The energy from solar radiation is a free resource and does not have any negative effects uponthe environment.

Electrolux och patenten. En studie av Electrolux patentstrategiska agerande 1950-1970.

Application Lifecycle Management (ALM) is a genre of computerized systems which allows system development corporations to efficiently and more easily manage, maintain and handle the applications lifecycle. These ALM systems have a wide variety of tools which can be integrated to enable and support collaborative work, while they act at the core of the organisation. Todays ALM systems support flexible system development methods throughout the entire development process. This paper focuses on a case-study of a Swedish business- and technology corporation and their use of two ALM systems with an aim to unravel the differences between these systems and their functionality to serve as a basis for decision making regarding their utilization of best practice with their ALM-Systems. Meanwhile we studied their approach to ALM systems to see if they were using them according to the initial idea of ALM systems.

Jämförelse av solhybrider

Research in solar energy is taking big steps in both solar heating and solar electricity. It´s not only the technologies alone, but also the combination of both solar electricity and solar heating which is what is called a solar hybrid. The idea of a solar hybrid is that a solar cells efficiency decrease with increased temperature and can with help from a solar collector be cooled and the heat can be utilized. This thesis report compares heat production and electricity production with respect of, in first hand, a solar hybrids geometry in the cooler. The theory chapter describes solar heating and how different solar cell technologies work and their environmental impact at the production and how compatible these technologies are for the solar hybrid.

Kyla i Nyköping och Motala : Kartläggning av kylapotential för Vattenfall Värm

The Swedish energy company Vattenfall is currently the owner of the district heatingsystems in Nyköping and Motala. To be able to also offer cooling solutions tocustomers are becoming more and more important. This report describes the resultsof an investigation of the cooling market in the two cities and the potential needs forcooling today and in the coming 20 years. The total potential for the coming 20 yearsis estimated to be roughly 17 MW for Nyköping and 9 MW for Motala.Two possible district cooling systems for each of the two city centers was modeledand a comparison was made between different cooling techniques namely absorptionand compressor chillers.Absorption chillers driven with district heating during the summer is one way ofincreasing the load in a combined heat and power plant and thereby the possibleelectricity generation. The cost of heat production must be low for absorption chillerto be able to compete as an alternative.

MOLNU : Att utveckla ett gemensamt gränssnitt

Climate and environmental issues is now high on the agenda. We live in a generation that must try to solve some major environmental problems. Buildings and habitations account for approximately 40 % of Sweden's total energy today. To reduce this figure, as needed, more research in the field of energy efficiency is required.This thesis concerns the heating of buildings. The load on district heating is heavy during certain times of the day.

Metoder för lastprioritering i fjärrvärmecentraler

A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.

<- Föregående sida 9 Nästa sida ->