Sökresultat:
919 Uppsatser om Heat storage - Sida 19 av 62
Inverkan av foders växtöstrogener på fysiologiska processer hos produktions- och sällskapsdjur
Phytoestrogens are secondary metabolites produced by plants. Among the plants that make phytoestrogens are soya, red clover and some types of grass. The name phytoestrogen is a collective term for compounds such as genistein, daidzein, biochanin A and formononetin. These compounds are similar to oestradiol-17? in their chemical structure.
Utvärdering av viabilitet hos selekterad hingstsperma med hjälp av fluorometri :
There is considerable variation between stallions in semen quality and fertility due to the fact that selection of stallions for breeding is not based on fertility or semen quality but on performance. The increasing use of cooled semen for artificial insemination has resulted in decreasing pregnancy rates. Therefore the equine breeding industry needs new methods for evaluation and development of sperm quality and fertility. This study is a part of such a project and is performed by SLU in cooperation with Flyinge AB. Ten stallions at the Flyinge National Stud were used in the study and three ejaculates were collected from each stallion.
Fjärrstyrd undervattensfarkost
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Optimering av B-stolpe
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Primärenergianvändning av passivhus i Sverige : Med fokus på Kvarteret Trettondagen
The building sector accounted for around a fourth of the total energy usage in Sweden in year 2010 (Energimyndigheten, 2012). Therefore it has become very interesting to achieve a lower energy usage in residential buildings. One way to achieve that is to build so called passive houses. By being very well insulated and have low leakage through the walls, they can reduce the energy usage for heating with a substantial amount. The first passive house was built during the 90?s in Germany; and in Sweden the first passive house was built in Gothenburg 2001.
Kan detektorer förebygga tågurspårning?
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Pelletering av tallspån : grundläggande studier
Wood pellets are an upgraded product of residuals from several wood processing industries, for example saw mills and pulp industries. The pellets are produced by pressing the milled and dried sawdust to cylindrical units with a higher density than the initial raw material. Pellets have great benefits compared to the raw material: high energy per volume, good transport and storage properties and homogeneity.
Several parameters collaborate in the whole process, which makes it complex. Wood is a heterogeneous material, chemically and structurally dependent on wood parts, habitat and storage procedures.
Ombyggnation till passivhus
Energy issues are constantly increasing attention in today's society. People's impact on Earth isentered in more contexts. Many discussions are about how the entire social structure needs to bestreamlined in order to achieve sustainability. The residential and service sector accounts for 39 % oftoday's total energy consumption in Sweden and the increasing electricity prices have made buyersmore interested in energy issues.There are many buildings in need of refurbishment today, including all the apartments that werebuilt in the 1970s to reduce the housing shortage at the time. 650 000 apartments of one millionapartments were built during the so-called the one million program and is currently in need ofrefurbishment.
3D-byggnadsmodeller utifrån takkonstruktioner : Lagring, hantering och bearbetning
A growing number of cities and municipalities in Sweden begin to work with city models in 3D. For the most part the models are used for visualizations of ongoing planning processes, but also for the analysis of noise, shadow studies and environmental disaster simulations.Gothenburg continues to develop the use of 3D maps in municipal operations and is demanding a way to create building elements (walls), which generates in 3D buildings, from roof constructions that are mapped from the primary map. A method has been investigated in the present study. The results are then presented as a 3D model of buildings, along with a terrain map that will facilitate the localization of the area. The created 3D buildings are then compared with roof-data from the primary map to see how well they harmonize with each other.
Hunnebergs Gård ? en förstudie av möjliga verksamheter
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Modellering och verifikation av hjulupphängning för ett ultralätt elfordon
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Lagringsmätning för AD-information
Målet med detta projekt var att hjälpa IT-Mästaren att kunna fakturera sina kunder på ett smidigare sätt. Deras dåvarande lösning av kundernas dataanvändning var tidskrävande och ineffektivt, därför ville de automatisera systemet. Det nya systemet skulle användas för att administrera kundernas servrar med hjälp av ett grafiskt gränssnitt och sedan kontakta dem för att få fram olika värden för respektive kund som ska presenteras på IT-Mästarens hemsida. På så sätt skulle de kunna fakturera sina kunder på ett mer effektivt sätt och även få bättre överblick av kundernas användning. I och med utvecklingen utav detta system så fördjupande jag mig dels i egna kända områden men jag lärde mig också nya kunskaper. Det gällde inte enbart teknisk utveckling utan också undersökning av exempelvis hämtningen av alla data som skulle göras.
Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Brännskuggat fanér - en metodanalys
This thesis is about a part of the marquetrytechnique, scorching. Scorching is made by heating up something, put a veneer into the heated substance and make a controlled burning. This technique is old but still used today and have according to me great potential for development. In my work I wanted to give the scorching greater room then I earlier have seen. I wanted the scorching to be the dominant ingredient for a decorative element in a piece of furniture or an interior.
Avvikelser i energiprestanda
Calculated and measured energy in residential buildings is going to differ. The reason to this may be due to many factors. In this study there is a study on how these factors affect the energy use in a building. To get an insight in what defines energy, there is first a description of energy supply both worldwide and used in Sweden, followed by a description of the energy balance. In this study energy will be studied in residential buildings only.