En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Föroreningstransport med dagvatten - Utveckling av reningsmoduler för modellverktyget Mike Urban SWQ (Storm Water Quality)

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Inventering av bitumenbundna lager med hög stabilitet ?hård asfalt? anpassade för stora hjultryck på industri- och hamnytor

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Effektivisering av dataflödet mellan anläggningsmodell och maskinstyrning - En översikt av flödet från konsult till entreprenör

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Bärighetskontroll av obundna granular material. En jämförelse mellan olika bärighetskontroller samt en alternativ utvärderingsmetod av bärighet med Lätt Fallvikt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency Harmonics.

Elkvalitéproblem vid varvtalsstyrd motordrift i industrimiljö

Övertoner orsakade av varvtalsstyrda motordrifter ger problem i industrisystem. Syftet med studien är att identifiera problemen och ge rekommendationer för att undvika dem. Studien utfördes som examensjobb på KTH för konsultföretaget Ramböll. En litteraturstudie i ämnet kombinerades med elkvalitémätningar på drifter hos Sandvik Mining.Elkvalitéproblem orsakade av varvtalsstyrda motordrifter kommer till stor del av att frekvensstyrningen ger olinjärt strömuttag som, om nätet inte är tillräckligt starkt, påverkar spänningskvalitén. Problemen kan vara driftstopp, störd utrustning och ökat slitage på utrustning för att nämna några.Denna studie visar att vid ändringar i system innehållande övertoner kan framtida övertonshalter approximeras för vissa fall.

vindkraftens påverkan på elkvaliten

This thesis concerns how the power quality in the grid is affected by the connection of wind power plants. As things are at present, Fortum Distribution AB has a number of wind turbines and wind parks connected to the own grid. As the pressure on building and connecting additional wind power is increasing, so is also the interest of how the already existing wind power generation affects the power quality in the nearby distribution grids. The study is performed by direction of Fortum Distribution AB and is limited to the 10 kV/40 kV-grid in Bohuslän, Sweden. The methods for calculation of power quality are compared to the results of a number of measurements.

Statuskontroll av Paradisskolans elektriska belastning

In this thesis is studied the electrical load of Paradisskolan with respect to power quality and energy consumption. The school's owner Trollhättans Tomt AB is also interested to know if they can reduce their costs by changing to smaller meter fuses. A recurring ground fault that?s been recorded from powerpanel A1A has been investigated. The school's equipped with an electrical bonding system, harmonic filters for the third harmonic currents, TN-S system from feeding transformer and groundfault monitoring.

Effektmätning i pump

The interest for power and energy measurement has greatly raised with todays increasing electricity prices and enviromental awareness. In the search for energy efficient solutions, the measurements are more complex due to increasing of non linear components. Harmonics and non sinusoidal voltages put high demands on sampling and filtering. Meanwhile, the price must be controlled so the customer still will find it interesting to invest in smaller plants. ITT W&WW asks for a robust, heat resistant power meter with compact dimensions to allow mounting inside the casing of a pump.

Tryckpulsgenerering för funktionskalibrering av mätsystem

The running of gas turbines with low emissions causes high pressure pulsations to arise in the combustion chamber. These pulsations are high amplitude sound vibrations. At some frequencies these are harmful to the gas turbine. Hence these pulsations are monitored to avoid operating conditions where pulsations are specifically harmful. It is necessary to expose the system of known pulsations to verify the functionality of the monitoring process.

Övertoner i elnät vid Skellefteå lasarett : Harmonics in power grids at Skellefteå Hospital

The goal of this paper is to find out how solar cells can improve energy efficiency on-board M/S Sydfart. The paper is based on a number of energy measurements on board the M/S Sydfart. The solar surface is calculated by measuring the available space for installing solar panels. Global radiation data is taken from STRÅNG's database, the data is then used to calculate the theoretical power produced by the solar cells. Energy efficiency is analysed in two ways.