Sök:

Sökresultat:

3696 Uppsatser om Gross motor test - Sida 9 av 247

Passivhusteknik i ett svenskt klimat - en byggnadsfysikalisk riskinventering och erfarenhetssammanställning av befintliga passivhusprojekt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Industriellt byggande på arbetsplatsen - En jämförelse mellan olika produktionsmetoder för trähus

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Förhöjda havsnivåers påverkan på trafiksystemen. En analys av riskläget i Göteborgs innerstad

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Samverkansanalys mellan påle och kohesionsjord. Studie av FE-programmet PLAXIS 3D FOUNDATION

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kartering av föroreningskällor i urbana avrinningsområden

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Översättning och utvärdering av det bildbaserade förståelsetestet TACL-3 - en pilotstudie

Test for Auditory Comprehension of Language -3 is an American picturebasedtest developed to examine children?s auditory comprehension of language.The aim of the study was to create a translation and to examine if the test wouldcontribute to the information about a child´s language comprehension received bysimilar tests that are used today. In the present study the test items were translatedinto Swedish. The translation was evaluated with 32 children in three different agegroups at a school in central Gothenburg. A linguistic examination of thetranslation and a list of the grammatical structures that are tested were made.

Verifieringsplattform i SystemVerilog

Our task was to create a virtual test bench for verifying memory addresses in our commissioning body?s models. The purpose with the testbench was that it should be created in such a way that it would be easy to change the device under test without any major changes in the testbench.To solve the problem that the testbench had to be able to verify different devices we had to create a general enviroment for how the testbench had to be composed. By doing an analysis of which com-ponents that are usually included in a testbench and which components that were necessary in our project we came up with a generall enviroment for the testbench. Our result was a testbench with the follwing basic functions:* Read from a file that contains read and write operations to the Device Under Test (DUT).* Apply the stimulus to the device* Read the results from the device* Compare the results with wanted values* Generate a log file which contains information about the simulation result..

En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Motorisk förmåga : Utifrån ett MUGI-test med förskolebarn

Detta examensarbete behandlar barns motoriska förmåga på tre olika förskolor, utifrån ett MUGI-test. Vårt syfte var att undersöka om det går att utföra ett MUGI-test på femåriga barn. Vi har observerat barnen som utförde övningar i MUGI-testet. Vi har kommit fram till ett resultat, som vi sedan har diskuterat och analyserat. Resultatet visar att nästan alla övningar är för svåra för barnen att genomföra, därför blir vår slutsats att MUGI-testet inte går att genomföra med femåringar på grund av att de inte kommit så långt i sin motoriska utveckling..

Wobblerpump

The task was to design and manufacture a submersible displacement pump working with the wobble plate principle. The main task for the Wobble plate pump is to be used as a sewage pump for smaller households or dewatering pump in environments where small flows and high pressures are acquired. For these purposes ITT Flygt sell a screw pump, PC-Grinder 3068. The hydraulic part of the PC-Grinder is manufactured by a subcontractor. Therefore ITT Flygt wants to evaluate an alternative to their screwpump PC-Grinder, which can be entirely manufactured by them self.

Modeling of a step motor for position feedback in a climate system

Med detta examensarbete vill vi belysa problematiken runt tredimensionell fastighetsbildning. Som objekt har vi använt oss av ett bergrum på Liljeholmskajen i Stockholm..

Hur äventyrspedagogik tillämpas på en Reggio Emilia-inspirerad förskola : Reggio Emilia-pedagogers tankar om äventyrspedagogik

Syftet med det självständiga arbetet var att undersöka hur äventyrspedagogik tillämpas i en Reggio Emilia-inspirerad förskola. Genom att jämföra dessa pedagogiker kan man få syn på likheter och skillnader som motiverar tillämpningens betydelse för barns lärandeprocesser. Undersökningen fick sitt praktiska utförande i en skogsmiljö på en av förskolorna, där två förskollärare hade teoretiska kunskaper inom äventyrspedagogik och Reggio Emilia. Tio pedagoger och en förälder deltog som observatörer i äventyret. Utöver dessa deltog två studenter från förskollärarutbildningen, Stockholms universitet som också är författarna till denna undersökning.

<- Föregående sida 9 Nästa sida ->