Sökresultat:
3523 Uppsatser om Frequency inverter control - Sida 28 av 235
Effekter av rTMS på benämningsförmåga och språkförståelse: en placebokontrollerad studie av åtta personer med afasi
The purpose of this study was to evaluate the effect of bilateral repetitive transcranial magnetic stimulation (rTMS) on language ability in eight participants with aphasia. All participants underwent two periods of treatment and five periods of evaluation. During one treatment period high frequency stimulation was given to the left hemisphere and low frequency stimulation to the right and in one other period placebo stimulation was given. Boston Naming Test and Token Test were used to assess the effects of treatment on naming ability and language comprehension. Results showed that no significant effects were found on group level.
Flervariabel reglering av industrirobot
The goal of this Master thesis has on the one hand been to create a simulation environment for robots, where not only the simulations in this work can be performed, but also similar robot simulations, and on the other hand to study regulators that can increase the possibilities of rejecting disturbances on an industrial robot. The robot model used has three degrees of freedom, corresponding to the three main links on ABB:s IRB7600. The simulation environment is created using Matlab, Simulink, and Robotics Toolbox. It is constructed in a general way and can be used for simulations of other robot objects created in Robotics Toolbox. A gain scheduling is added to the LQ-regulator, where the feedback matrix is varied depending on the arm position in the workspace.
Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Animal welfare in Ethiopia: handling of cattle during transport and operations at Kera Abattoir, Addis Abeba
The main objective of this study was to evaluate animal welfare situation in Ethiopia during slaughter and to investigate chain activities between animal markets and Kera abattoir in Addis Abeba. In total, 442 animals were observed within 52 groups of cattle; both ox and
calves with different breeds. The study was divided into four different sets of data collection; behavioural observations, recording of slaughter process, observation during transport and interview. During the behavioural observations, an ethogram was used with 46 behaviours
observed, categorised into 5 different groups. The data was calculated using Excel and SAS.
The results indicated that a significant correlation (p-value.
Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Det är ju samma arbete fast annorlunda : marknadsmekanismers inverkan på hemtjänstpersonalens arbetssituation
Many organizational changes have been accomplished in elder care since the 1980's and many of those have been influenced by market mechanisms. The purpose of this study is to examine how the implementation of these market mechanisms has affected three important aspects in the work situation for personnel. These aspects are, demand, control and support. To attain the purpose of this study, five qualitative interviews with home care personnel have been carried out. The interview material has been analyzed and structured with the help of Karasek and Theorells demand-control-support model.
Kappa Control with Online Analyzer Using Samples from the Digester's Mid-phase
In the pulp industry, digesters are used to disolve lignin in wood chips. The concentration of lignin is measured and is called the Kappa number. In this thesis, the question of whether an online Kappa sensor, taking samples from the mid-phase of the digester, is useful or not is analyzed. For the samples to be useful, there has to be a relationship between the measured Kappa at the mid- phase and the measured Kappa in the blowpipe at the bottom of the digester. An ARX model of the lower part of the digester has been estimated.
Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Tryckpulsgenerering för funktionskalibrering av mätsystem
The running of gas turbines with low emissions causes high pressure pulsations to arise in the combustion chamber. These pulsations are high amplitude sound vibrations. At some frequencies these are harmful to the gas turbine. Hence these pulsations are monitored to avoid operating conditions where pulsations are specifically harmful. It is necessary to expose the system of known pulsations to verify the functionality of the monitoring process.