Sök:

Sökresultat:

2488 Uppsatser om Frequency controlled operation - Sida 24 av 166

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Emotionell förberedelse avbarn inför operation : - Barnets omvårdnadsbehov- Sjuksköterskans metoder

Syftet med denna systematiska litteraturstudie var att beskriva barnets emotionella omvårdnadsbehov i den förberedande fasen inför operation. Vidare var syftet att beskriva sjuksköterskans metoder vid förberedelse av barnet för att skapa trygghet.Artikelsökningarna genomfördes på databaserna Elin@dalarna och Cinahl med sökorden operation, preoperative, children, preparation, information, nursing, care och nurse. Sökorden fanns i artiklarnas abstract. Artiklarna var vetenskapliga, skrivna på engelska och publicerade år 1997 till 2007. Endast primärartiklar söktes och deras relevans bedömdes efter titel och abstract.

En longitudinell studie av tidig talutveckling hos barn med isolerad gomspalt

The present study examines in a longitudinal perspective earlyspeech development in children with partial isolated cleft palate comparedwith children with unilateral cleft lip and palate and children with typicaldevelopment. The groups were compared regarding consonant production at18 months, 3 and 5 years. The results showed that speech development inchildren with isolated cleft palate did not differ significantly from that inchildren with typical development except for production of oral fricatives at18 months. The children with unilateral cleft lip and palate had significantlymore speech deviations at all ages. The children in both cleft palate groupshad significantly higher hearing thresholds at all ages.

Lean & Kaizen -dröm eller verklighet? : En kvalitativ studie med kundperspektiv i fokus

This qualitative study involves the implementation of Lean and Kaizen methods in a Swedish service industry. Lean philosophy is based on a method to achieve more with less. In practical terms this means that the use of an organization's resources is improved. The origin of Lean is the Toyota Production System. Now, Kaizen methods give managers and employees a better more efficient system to reach their goals within the organization or company.

End of line test : En studie av företaget Emotrons linjetestning i produktionen

Emotron is a company specialised in developing, producing and marketing equipment to con-trol, monitor and protect processes and machinery driven by electric motors, with an applica-tion focus. Examples of uses for their products are fans, pumps, lifts and cranes.The project is to look at Emotrons end of line test. The company has seen that at the final test-ing there is a bottleneck that restricts the outflow and prevents an increase in the number of tested products.The purpose of this project is to review how Emotrons end-of-line test works today and if there is a possibility to make the test more efficient in such a way that the quality is not at risk, while increasing the outflow of tested products.The projects first step is to look at and analyse what is causing the bottleneck at the end-of-line. When the analysis is complete, the next step is to review whether there is a possibility to solve the bottleneck and if so in what way can this be done. Emotrons most overall objective of the project is to increase the outflow of the number of tested products without jeopardizing the quality.An analysis has been made on frequency inverters, soft starters and shaft power monitors.

Patienters upplevelser vid postoperativ smärta

Bakgrund: Bristfällig postoperativ smärtlindring är ett stort problem på många vårdavdelningar. Patienter fortsätter att uppleva obehag och smärta efter operation trots att utvecklingen i postoperativ smärtbehandling har gått framåt. Syfte: Syftet med studien var att belysa patienters upplevelser vid postoperativ smärta. Metod: Litteraturstudien byggde på sju artiklar, alla med kvalitativ forskningsansats. Studierna granskades och analyserades efter Malteruds (1998) analysprocess, med avsikt att komma fram till olika teman.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Bostadsbyggande i Skövde fram till år 2025

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Arbetsterapeuters erfarenhet av bedömning av barns aktivitetsförmåga i skolan : En kvalitativ intervjustudie

Höft- och knäprotesoperationer är idag en vanlig operation vid artros i höft- och knäled. Trotsminutiösa infektionsförebyggande förberedelser inför operationen drabbas ändå en delpatienter av postoperativa infektioner. Vid ortopedisk proteskirurgi är postoperativainfektioner ett direkt hot mot den nya inopererade leden och kan leda till långabehandlingstider som påverkar patientens livskvalitet under lång tid.Syftet med studien var att utforska patienters möjlighet till delaktighet i tidig upptäckt avpostoperativ infektion utifrån given information vid operation för höft- eller knäprotes.Semi-strukturerade intervjuer genomfördes med tio patienter med diagnostiserad postoperativinfektion efter höft- eller knäprotesoperation. Transkriberade intervjuer analyserades medinnehållsanalys. Journaler granskades för att beskriva patientens tidigare sjukdomar.Resultatet visade att första tecknen på infektion kan beskrivas med temat: Vad är normalt ochvad är inte normalt.

Ortopeders upplevelser av vilka faktorer som motiverar en främre korsbandsoperation och sjukgymnastens roll i beslutfattandet

Främre korsbandet är en av knäledens viktigaste stabiliserande strukturer. En korsbandsskada är den vanligaste ledbandsskadan som drabbar knäleden och kan i vissa fall medföra permanenta funktionsnedsättningar. Idag råder delade meningar om vilka individer som ska opereras respektive behandlas konservativt och det finns flera faktorer att ta i beaktande innan beslut om operation kan tas. Oavsett behandlingsval är sjukgymnastisk rehabilitering nödvändig i syfte att förbättra patientens välbefinnande och fysiska kapacitet. Dessutom är sjukgymnastens roll i detta sammanhang oklar och behöver förtydligas.

Uppföljning av EcoDrivingutbildning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 24 Nästa sida ->