Sök:

Sökresultat:

2016 Uppsatser om Frequency altered feedback - Sida 20 av 135

Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Sagan om informationsflödet av feedback från marknaden som inte nådde franchisegivaren : Studie om problem och möjligheter som finns inom klädbranschen när det gäller att säkerställa att informationsflöde gällande feedback från marknaden når franchisegiva

Informationsteknologin och ett alltmer multifunktionellt internet är en orsak till den så kallade ?informationsrevolutionen?. Ingenting i ett företag sker utan att det föregåtts av någon form av utväxling av information. Information är till för att underlätta för företaget att göra affärer. Det är säljaren som möter kunden har en viktig roll då denna person verkar som koordinator mellan det egna företaget och dess kunder.

Ursäkta, var är toaletten? Patienters upplevelse av att få en tillfällig loop-ileostomi nedlagd efter rektalcancerbehandling

Introduction: Reversal of a temporary loop-ileostomy is the final step after a long treatment for rectalcancer, an event that the patient has been looking forward to for a long time. Studies have shown that patients often have a significant impact on the bowel function after reversal of the stoma.Aim: To describe how the patient experienced the first time at home after reversal of a temporary loop-ileostomy due to rectalcancer. Method: Qualitative semi-structured interviews, with 15-20 patients who have undergone reversal of a temporary loop-ileostomy due to rectal cancer, will be conducted. The interviewes will be analysed using qualitative content analysis according to Graneheim & Lundman (2004). The patients will be recruited from the colorectal unit at Sahlgrenska University hospital/Östra and from the surgical unit at Kungälvs hospital.

Uppföljning av EcoDrivingutbildning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Visioner på hällar : teorin om förändrat medvetandetillstånd på sydskandinaviska hällristningar under bronsåldern

In this paper I discuss the theory of altered states of consciousness. Some of the rock art of the san-people in southern Africa and the lakota people in South Dakota, USA have been inspired by experiences during trance. The question is if some of the rock art in southern Scandinavia also have been inspired by trance experiences, and if archaeological scientists by investigating this theoretical view might find a better understanding as far as the Bronze Age in Southern Scandinavia is concerned..

Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Strategier hos de stora svenska byggföretagen 1992-2006

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

En studie av samspel inom säljcoaching

Titel: En analys av samspelet inom säljcoaching ur ett företagsekonomiskt perspektivNivå: C-uppsats i FöretagsekonomiFörfattare: Andreas Dahlström & Lars StenerydHandledare: Lars-Johan ÅgeDatum: 2013-06Syfte: Säljcoaching är idag ett välkänt begrepp och ett viktigt verktyg som finns tillgängligt för att förbättra försäljningsprestationer, maximera produktivitet och uppnå ökad lönsamhet för företag. Huvudsyftet med uppsatsen är att belysa samspelet mellan säljcoachen och personen som blir säljcoachad med avseende på de tre säljcoachingkonstruktionerna - feedback, coachen som en förebild och ömsesidigt förtroende och respekt mellan dessa parter.Metod: En kvalitativ deduktiv metod med ett hermeneutiskt synsätt där analys av empirisk data sammankopplat med teori ska skapa förutsättningar för förståelse av samspelet inom säljcoaching. Empirisk data insamlas med hjälp av sju intervjuer som genomförts med ett företag som arbetar med att sälja tjänster, fastighets-förmedlingsföretaget Fastighetsbyrån. Sedan data insamlats och transkriberats, har en passande kvalitativ analysmetod utvalts med utgångspunkt av syftet.Resultat och slutsats: Studien visar att feedback behöver framföras på rätt sätt, rätt frekvens (hur ofta feedback ges), vid rätt tillfälle och av rätt person, oavsett om det avser feedback för att förhöja en prestation (positiv feedback) eller för att ändra ett beteende (negativ feedback). Vikten av att lyssna innan sändning av feedback har uteslutande framkommit i studien, såväl som ett öppet sinne för olika personlighetstyper och preferenser.

Projekteringshandbok i praktiken. En studie om hur en projekteringshandbok används och kan förbättras

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Faktorer som påverkar Vänerns öppna sandstränder och möjligheterna för hög biologisk mångfald ? med mossor som indikatorer på igenväxning

The sandy beaches of Vänern are threatened by overgrowth and thereby the biodiversity is at high risk to decline. This study is based on an inventory of vegetation of overgrowth character and mosses. The frequency and spread of mosses is perceived as an indication of initial or present overgrowth. External factors that have been taken into consideration are wind-, wave- and ice erosion, the slope of the beach, wear and grade of exposure. The purpose of the investigation is to control the beaches grade of overgrowth and find out which external factor is of most importance for the maintenance of the biotope. The results show that the beaches environment is affected by the slope of the beach, grade of exposure, size, wear and overgrowth.

<- Föregående sida 20 Nästa sida ->