
Sökresultat:
21 Uppsatser om Forsmarks Kraftgrupp AB - Sida 2 av 2
Att göra mål : en jämförande studie mellan Flygvapnets och Forsmarks sätt att sätta upp mål för säkerhetsarbete
I chose to study how the Swedish Air force carries out their work with setting goals for their work to improve flight safety and compare this with how the Swedish nuclear power plant Forsmark performs their work with improving nuclear safety. The study showed that both organisations have a lot to improve on in their ways of how to work. Especially when it comes to engaging the employees in the process, both in letting the employees be a part of coming up with areas to work on and in letting the employees evaluate which progress that has been made. It also showed that both organisations need to improve their methods for evaluating the work that has been done. This is especially important for the Air Force which evaluates on many levels and locations and did not have a set standard for how to conduct the evaluation.
Dokumentation av underhållssimulatorer för utbildning i vardagssäkerhet
At Forsmark nuclear power plant a new course called "education in everyday safety" has been started in an attempt to improve the safety culture. The goal is to spread the of expectations and approach the maintenance management has set, to all employees working at the plants. During the course, theory is mixed with practical tasks to reach a common view how work should be done to achieve safety for the plant and the people that work there.The practical tasks are done inside "maintenance simulators". They are built inside 20 ft containers which contains two dummy pipe systems. On the pipe systems some valves, a flow meter and a pump has been installed.
Transientanalys för Forsmark block 2 och 3 : Studie av hur val av driftpunkt och pumpreglering påverkar torrkokningsgränsvärdet
The dry out criterion (MCPR) has been calculated for the most limiting H2-events for Forsmarks unit 2 and 3, at operating points that are normally not analyzed before each cycle. The operating points that normally are regarded as the ones with the lowest margin to dry out are the ones where the thermal power is the highest at agiven recirculation flow. This report shows that this is not the case for Forsmark 3. MCPR-values at partial power operating points are higher for the limiting case inside rather than on the boundary of the region of operation. It is therefore recommended that the method for determining the dry out criterion for Forsmark 3 is revised to account for this effect.
Analys ac konstruktionsprocessen inom FTC
This thesis work was made to optimize the writing of the construction specificationsat FKA. These construction specifications are created before each plant modificationsthat is started because requirements from the Swedish radiation safety authority(SSM) and internally on Forsmarks nuclear group as constructions / implementationdocumentationThe study was done through seven interviews of two people at three different groupsinvolved in the construction specification and an interview from the group accreditedverification. The four selected groups were selected through an extensive analyticalwork resulted in an elimination matrix where these four groups was considered to bemost involved with the construction specification.The questions asked to these individuals were based on the instructions and sampletext that are described in the construction specification. To ensure the quality of thethesis were to limit itself to the chapters that were considered most relevant toimprove. The analysis revealed a number of points that should be improved, partlyinto the routines when writing the construction specification and when ether sampletext or suggestions should be changed and complemented.
Verksamhetsanalys Jämförelse mellan IAEA och OKG AB inom E.ON-koncernen
The safety and safety work on OKG, Oskarshamns Kraftgrupp, is supervised by SKI, Swedish nuclear power inspectorate. The task of SKI is to inspect that the nuclear power plants of Sweden runs in a safe way. The proprietor of the permit who runs nuclear power plants has the responsibility to maintain the required safety to run a plant. SKI publishes a number of statue books that OKG has to meet to be able to run the plants. SKI recommends in SKIFS 2 004:1, that OKG work with the safety requirements of IAEA.
Systematiskt arbetsmiljöarbete: en metod för årlig uppföljning av det systematiska arbetsmiljöarbetet inom Vattenfall Norden Sverige
Detta examensarbete har utförts på uppdrag av Vattenfall Norden Sverige. Vattenfall beslutade år 2006 att till slutet av år 2009 ska alla bolag inom Sverigedelen av Vattenfall Norden befinna sig på steg 4 enligt Arbetsmiljöverkets fyrgradiga bedömningsskala för systematiskt arbetsmiljöarbete. Syfte och mål med arbetet har varit att genomföra en utvärdering av Vattenfalls systematiska arbetsmiljöarbete och att redogöra för hur steg fyra enligt Arbetsmiljöverkets bedömningsskala kan mätas i koncernen. Även resultatet från den årliga utvärderingen av det systematiska arbetsmiljöarbetet inom Vattenfall Sverige för år 2006 skulle redovisas och den fyrgradiga skalan tydligare beskrivas. Tillsammans med Vattenfall beslutades det ganska omgående att undersökningen skulle göras genom en enkät som skulle skickas ut till Vattenfalls bolag inom Norden Sverigedelen.