Sök:

Sökresultat:

1343 Uppsatser om Flow simulation - Sida 10 av 90

Opera i Stockholm : Stadsgårdskajen

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

Mätning av abrasivflöde för vattenskärningsmaskiner

The content of the following report is the summarized result of three students thesis at Blekinge Institute of Technology in co-operation with Water Jet Sweden AB. This report will give the reader a description of principles how to measure the abrasive mass flow in a waterjet cutting system. The work began with a visit to Water Jet Sweden AB to get a closer look at the problem. When the analysis of the problem was done the criteria were defined in the form of demands and desires. The main task of the criteria was to guide the search for the solution. The work proceeded with an extensive search for abrasive flow meters along with obtaining information about flow measurement in general. When the search for abrasive flow meters resulted in nothing all the efforts were concentrated on finding a principle of measurement that could cope with the criteria.

Optimering av OTEC-system

Ocean Thermal Energy Conversion, OTEC, is a sustainable energy conversion technology that is not yet commercialized. OTEC is a technology that utilizes the temperature difference in oceans between the warm surface water and the cold water at 1 000 m depth to run a Rankine Cycle. This technology can produce electricity and provide synergies like fresh water, air conditioning and aquaculture. A simulation program for three alternative OTEC systems has been created in order to decide which OTEC system is most profitable; closed, open or hybrid system. In this simulation a production cost analysis is performed in order to investigate and decide which one of the three systems that has the lowest production cost. The production cost analysis also analyzes if the profitability is affected by the size of the facility. After these analyzes, the most profitable of the three different OTEC-systems is expanded by an installation of solar collectors in order to see if the thermal efficiency is improved. The result shows that the most profitable system varies with the size of the facility.

????Att lösa reglertekniska problem med Modelica

Modelica is a multi-domain and equation-based modeling language. Modelica is based on object-oriented principles and non-causal modeling. The language is constructed to facilitate reuse and decompose models. The models and the modellibrary can modified to design a new nonlinear components.Object-oriented modeling is an excellent way to analyze and study large complex heterogeneous physical systems. The object-oriented modeling approach build on reusing and decomposition of models and non-causal modeling.Modeling physical systems often leads to a DAE system with index 2 or 3.

Information ochmaterialflödesförbättrings analys

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Läcksökning med penetrant ? kvalitetssäkring av

Vacuum box leak testing is, because of geometrical problems, not always possible andtherefore an alternate test method with dye penetrant is used. DEKRA Industrial has identifieda need for quality assurance of the method and development of a written procedure withguidelines that lead to more uniform ways of testing.A literature study was done to get a general overview of nondestructive testing (NDT) and tosee how the method is used in different applications. European and American standards werestudied. Analytical and numerical solutions, involving Flow simulation, were deemed to berather difficult and beyond the scoop of this project. Thus the problems had to be solved byusing experimental methods.

Översvämningsrisker längs Funboån

Flooding events are no longer rare, floods occur all over the world. Accordingly, it is vital for the society and different authorities to work with flood mapping. To meet the goal of Uppsala kommun to map the risks of floods in Uppsala län, a map of the different areas around Funboån which are inside the area of risk for flooding have been developed.In the work, cross sections and the water flow have been measured. Moreover, an echo-sounding have been carried out in Funboån to map the bottom topography. From the bottom map and laser scanned data covering the study area, a terrain model was created.

ITS under byggtid - utvärdering med dynameq : Fallstudie: Intunnling av E4/E20 Tomteboda - Haga södra

Essingeleden in Stockholm is the most heavily congested road segment in Scandinavia and it is ofgreat importance for as well traffic within the city as for transit traffic. The capacity of Essingeledenand Norra Länken is not enough to accommodate all traffic. At times it is not moving at all, whichresults in long queues and an augmented risk of accidents. Consequently measures for increasing thecapacity on E4/E20, which will reduce congestion and the risk of accidents, are implemented byTrafikverket. In fall 2012 one lane of three at Pampas will be closed and so will the exit fromEssingeleden to Norra Stationsgatan, called Parkeringsbron.

Cykeltidsoptimering av sjuaxligt robotsystem

This master thesis studies how much the cycle time, i.e. the time it takes for an industrial robot to perform a given task, can be reduced if an extra degree of freedom (DOF) is added to the robot system. The extra DOF consists of a linear track, which is supposed to be used in an optimal way. The problem has been studied using simulations in the robot simulation tool RobotStudio. To be able to run an optimization in Matlab, with the RobotStudio simulation cycle time as the object function, communication between Matlab and RobotStudio has been set up with an interface written in Visual Basic.

Energianvändning i badhus : Simulering och jämförelse av gamla och nya system

Every year new premises are built in Sweden, and even if they are made as energy efficient as possible, this will not reduce the energy demands, but the rate of the increase of the energy use will be reduced. One type of facility in Sweden that is a major energy user is public baths, and this makes public baths an interesting facility to study more closely. There are around 500 public baths in Sweden and about 75 % of those can be seen as older baths with large need of renovation, and they all require a high level of energy efficiency measures. To show how the energy demand increase or decrease depending on the changes chosen to be made, the simulation application IDA Indoor Climate and Energy was used. Simulations were made and compared for several cases, with two extreme cases as starting points.

Del projekt inom ClampCal - Utvärdering av mätmetoder för temperatur, viskositet och densitet samt röregenskaper

The dissertation were performed on SP, Technical Institute of Sweden. The dissertation were carried out on the measurement technical department, this dissertation is a part of a bigger project, project ClampCal. One of SP?s returning assignments are flow-measurement. When flow-measurement is performed, the flow has to be stopped so that a meter can be installed in the pipes where measurement is going to take place. At every stop there is time delay in the flow which causes the customers to loose money. This is why SP wanted to find a better solution so that measurement can be done without any stops in the flow. Usage of a so-called Clamp-on meter was considered, but since the measurement uncertainty is too large it takes some investigation on the parts where the largest uncertainties occur and thus find a solution that can diminish the uncertainty as much as possible. The parts that were considered to have an opportunity to reduce measurement uncertainties were the fluid temperature, its characteristics and the pipe geometry and its characteristics. For the fluid temperature a Pt100-sensor with four different radii for various pipes was used.

Simuleringsmodell över Ålö AB

During year 2004 Ålö AB made significant change in their production process. The production of front loaders is nowadays highly automated with short operation times. To be able to control their process in a better way Ålö recently decided that they needed a tool for simulation of their production and to shift patterns. This final thesis started with a pilot study in Ålö?s factory in Brännland.

Förslag till energieffektivisering och energideklarationsunderlag : Munkebergsskolan och Bredängens äldreboende i Luleå

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Design för Flow : En analys av designkriterier för användbarhet

Human Computer Interaction (HCI) handlar om att utveckla produkter med god användbarhet. Med användbarhet menas att system ska vara lätta att använda och lära. Jakob Nielsen är en av förgrundsfigurerna när det gäller riktlinjer för hur detta ska uppnås. Han har utvecklat tio kriterier som kan användas för att ett så bra system som möjligt ska kunna utvecklas.På senare år har forskare börjat se till, inte bara tekniska aspekter utan även till de känslor som användaren kan tänkas uppleva under det att denna interagerar med en webbsida. Ett flertal forskare har utvecklat teorier kring begreppet Flow.

Akustisk design av studiorum för musikinspelning

Detta projekt genomfördes i samarbete med akustikern Erling Nilsson på företaget Ecophon i Hyllinge. Uppdragsgivare var musikproducenten Magnus Ågren som äger studion Flow Music i Malmö. Uppgiften var att förbättra akustiken i ett av Flow Musics studiorum. Rummet hade före projektet en hård och obehaglig akustik. För att komma fram till ett åtgärdsförslag specificerades först hur enskilda akustiska egenskaper skulle påverkas för att ge ett så bra resultat som möjligt.

<- Föregående sida 10 Nästa sida ->