Sök:

Sökresultat:

110 Uppsatser om Faults - Sida 1 av 8

Identifiering av parametrar för tillståndsbedömning av en vattenkraftstation

The report begins with a general inventory of possible technical Faults in a hydropower plant and of possible fault indicating measurements. Then an investigation is made concerning a few different Faults. Based on this investigation a choice on seal box condition and water leakage is made as problem for a more thorough examination, in which it is concluded that the turbine water leakage is larger when the turbine is put into operation. The examination ultimately results in a computer alarm for Faults related to the seal box. Finally a few things are mentioned about flow measurement and pressure measurement in relation to the project as a whole..

Feldiagnos för RM12 baserad på identifierade modeller

The jetengines of today are growing in complexity. Reliability for aircraft engines are of extreme importance, mainly due to safety reasons but also economical ones. This master thesis deals with faultdiagnosis in the turbine section of RM12, the engine used in Saab/BAe's Gripen. Three different Faults which can occur in the turbine section was studied. These Faults are: clogged fuel nozzle, hole in outlet guide vane and sensor fault.

Hur ökad fukthalt påverkar pannor

This report is a description of a developed educational simulator over rail vehicles and its components. The simulator is a hardware-based prototype over a door system on rail vehi- cles. System specialists and technicians will use the prototype. The Simulator should give the user a technical demonstration on how components work in a door system. The proto- type consists of motor, switch, relay and sensor.

Utbildningssimulator av funktioner i spa?rfordon : Ha?rdvarusimulator med felso?kning pa? do?rrsystem

This report is a description of a developed educational simulator over rail vehicles and its components. The simulator is a hardware-based prototype over a door system on rail vehi- cles. System specialists and technicians will use the prototype. The Simulator should give the user a technical demonstration on how components work in a door system. The proto- type consists of motor, switch, relay and sensor.

Optimering av prioriteringsverktyget Werner

E.ON Elnät has in their project Operational Performance developed a priority tool forconstruction and operation. The tool will help the users to increase the capability to prioritybetween new development projects and removal of Faults. The tool can be seen as a measuringfor different bay?s reliability, size and the community usefulness. The result of the priority isdirectly connected to which calibration that is chosen in the tool.The priority tool is still under development and there is therefore an uncertainty about howsensitive the tool is for changes in the calibration.

Felisolering av hytt- och chassikomponenter på tunga fordon

This master of science thesis is focusing on how the fault handling on hardware connected toa control unit on a Scania vehicle is working. To the hardware counts buttons levers, sensorsand CAN. The work has been concentrated upon how the fault handling is working and if it ispossible to find any new fault modes.The control unit that has been studied is called the Coordinator and is the core in Scanias threenetworks of control units. The Coordinators work is to transmit messages between the threenetworks and to process signals from buttons, levers and sensors. The values is then usedinternally or is sent to other control units on the CAN networks.

Oljepriset och Investeringsbeslut

It is easy to see that oil has a big part in our economy, by looking at the repeated news from the media and at the stock market, where they follow the oil price very closely. Behavioral finance is about investors making small or big mistakes in the stock market. Behavioral finance describes the importance of understanding your own Faults, as well as others investor?s Faults. Behavioral finance emphases the importance of not assuming that the financial market is a flawless environment, but to understand the psychology behind investment decisions.

Ett flervariabelt feldetekteringssystem för övervakning av bärlagertemperaturen i vattenkraftturbiner

The purpose of this thesis work was to develop an automatic fault detection system for surveillance of bearing temperature in hydropower turbines. The parameters used except the bearing temperature were cooling water temperature and cooling water flow. A simple static model based on data sampled every minute was developed to estimate the bearing temperature. Then a detector for detection of change in bearing temperature based on the CUSUM-algorithm was designed. Since the amount of data was very small the developed model was too uncertain to be used in a working system.The designed fault detection system showed to work well for the available data.

Analys av fördelningssystem för bostadshus

The purpose of this project is to analyze earthing systems for houses. By practical measurements and theoretical analyzes consequences of possible Faults, that can occur within the facility and in the low-voltage distribution network, is illustrated.  The reason for this project is that nowadays one has to arrange with a main equipotential bonding system for buildings. Apart from that, if necessary, bathrooms must be provided with a supplementary equipotential bonding system.The practical measurements verify that potential differences in facilities may be due to voltage drops in the PEN conductor between the origin of the electrical installation and the power transformer.Based on the theoretical analyzes of possible Faults, it is considered that the requirement for  supplementary equipotential bonding systems for bathrooms in most cases can be questioned, when basic insulation, fault protection, residual current devise and main equipotential bonding system already provides an adequate level of protection.A PEN conductor loss may result in a situation where metallic parts attached to the equipotential bonding system starts working as earth electrodes. Equipotential bonding system may also increase the incidence of stray currents. If TN-C-S systems is provided with a local connection to earth a redundant system against PEN conductor loss is obtained.

Sesam, öppna dig! : rariteter i de svenska forskningsbibliotekens skattkammare

The essay deals with the patterns of storytelling in Selma Lagerlöfs novel "Körkarlen". The focus is on the relationship between idea and form. Selma Lagerlöf tries to show how the drinker David Holm comes to insight about his own shortcomings and Faults without knowing that he is in fact educated by his old friend. The author of this essay tries to show that Selma Lagerlöf use the same method in relation to the reader of the novel. Selma Lagerlöf wants to enlighten the reader without actually preaching.

Industrialiserat byggande

The industrialization of construction is increasing in Sweden which leads to higher demands of prefabricated components and cells. But what does the business of construction think of the industrialized business and what can be done in order to decrease Faults and errors with these products? Today we have many manufacturers who have different technical solutions which might lead to difficulties when assembling components and cells at the building site. But by trying to make a more opened market, with possibly standardized connections details and improving the communication between the different participants, the prefabricated components and cells can be made and assembled with less errors. This is something that needs to be done in order to establish a more secure business, and especially when working with new companies and methods, when using industrialized products..

Nollföljdsmodellering av transformator-Beräkningar av följdproblem vid ökad kablifiering på mellanspänningsnivå

Historically transformers with system earth equipment have been modeled as open circuits in zero sequence. This approximation has been satisfying, but lately it has been discovered that equipment on one side of the transformer have responded to Faults that occurred at the other side. Most of these problems took place when the majority of the system on the secondary side of the transformer contained cables. These findings have led to questioning whether or not the former model of the transformer in zero sequence is correct. This report investigates if it is necessary to represent the transformer in zero sequence in another way than it is usually done today.

En studie av sex ISA-system

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Selma Lagerlöfs konstnärliga metod, en studie av idé och gestaltning i Körkarlen

The essay deals with the patterns of storytelling in Selma Lagerlöfs novel "Körkarlen". The focus is on the relationship between idea and form. Selma Lagerlöf tries to show how the drinker David Holm comes to insight about his own shortcomings and Faults without knowing that he is in fact educated by his old friend. The author of this essay tries to show that Selma Lagerlöf use the same method in relation to the reader of the novel. Selma Lagerlöf wants to enlighten the reader without actually preaching.

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

1 Nästa sida ->