Sökresultat:
2856 Uppsatser om European Parliaments Energy Directive - Sida 56 av 191
Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Prognostisering av höga grundvattennivåer med Chalmersmodellen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Rationell plattläggning. Studie av ett arbetsmoment
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av Vikan Kross och Asfalt
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Bilden av Sverige i morgondagens EU : offentlig diplomati i en föränderlig värld
Purpose/Aim: The purpose of this paper is to describe how a number of strategically selected employees at the Swedish Institute, with the purpose to promote Sweden in the world, look at the challenges facing Sweden concerning nation branding in the new era of cooperation within the European Union. I examine how these people look upon the work of public diplomacy and nation branding in order to actively participate and influence the EU's common communications platform.Material/Method: The method used in this thesis is qualitative interviews. The reason why I chose this method is because I consider it to be the most appropriate in order to collect information about how these selected employees at the Swedish institute regard the challenges that lay ahead in terms of nation branding within the European Union.Main results: On the basis of the results I have gained by dint of the analysis, it can be concluded that it is of utmost importance to take the societal changes, which are a result both of the worldwide globalization and the EU cooperation, into consideration when designing a future communication strategy for the Swedish Institute. The nation-state continues to play an important role in Sweden, but its importance is declining as the EU cooperation is progressing. The citizens? identity plays a crucial role in designing a nation?s communications strategy, and from the analysis I conclude that we move not from a Swedish to a European identity, but towards a pluralistic union where multiple identities meet under one umbrella; the EU..
Torkning och pelletering av organiskt hushållsavfall - en konstruktionslösning
The research in this paper aims to producing a home version machine thatcan dry and make biological waste into compact pellets. This product ismade primarily for those who want to improve the environment and reducethe energy consuming process of separating the biological leftovers fromother waste in the large processing plants and save money due to reducedpickups of waste. Since there is no commercially available product thatdoes what we want to achieve we had to start from the beginning with boththe design and the mechanical aspects. The result is a machine, that fits inour homes, and in an easy and inexpensive way reduces the amount ofbiological waste that needs to be collected by the public wastetransportation system. This is done without reducing any of the energy inthe waste and it can still be used to compost or by large-scale plants that usethe waste to make electricity.
IMPLEMENTERING AV ARBETSMILJÖLAGENS ÄNDRINGAR, GÄLLANDE FRÅN 090101, PÅ BYGGARBETSPLATSER
In the EU there are EC Directives that Member States of EU should follow. Sweden has undertaken to transpose EC Directives regarding the working environment to Swedish Provisions. In 4 April 2006, the European Commission had some criticism against the Swedish implementation of the Construction Sites Directive. The Swedish Work Environment Authority has in response to this criticism reworked the Work Environment Act and related provision about building and civil engineering work. The changes came into force 1 January 2009.These changes have resulted in some working methods and even new responsibility subjects must be reviewed. The purpose of this exam project was to investigate if contractors and clients in the construction sector, had have time to update themselves on this front and adapt to these changes.
Lönekartläggning och handlingsplan : - en undersökning om det aktiva arbetet för jämställda löner
Swedens membership in the European Union have resulted in an internationalcharacterized labour market. The construction sector is the area who employs mostposted workers among the 7400 employees who monthly enters the market. It?s alsothe sector where a big part of the work-related deaths occurs. The purpose of this studyis therefore to contribute to a greater understanding of the regulation regarding postedworkers, their work environment and the consequences of it.
Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Bostadsbyggande i Skövde fram till år 2025
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Uppföljning och analys av Stockholms stads solcellsanläggningar
During 2007 the City of Stockholm installed five grid connected photovoltaic systems. The aim of this master thesis is to quantify the amount of produced energy and recommend routines to collect and analyse production data, to make production data accessible by the public and to gain experience for future installations.The total amount of produced energy until March 2009 is 227 000 kWh, with an annual rate of 150 000 kWh. The expected annual rate was 148 000 kWh.All system owners are positive about their plants and see economical benefits in scaling up such systems.The installations need very little attendance and maintenance, however it is recommended that an alarm function is installed for automatic feedback in case of a system failure. All future systems should be inspected during full operation to determine if the actual capacity is matching the installed capacity..
Hållbara uppvärmningsalternativ för hotellstugorna på Grinda : En kvantitativ studie gällande hållbara uppvärmningsalternativ på en skärgårdsö
Skärgårdsstiftelsen, which is responsible for several of the archipelago islands in Stockholm, has chosen to explore the possibilities for more sustainable heating systems in buildings on the islands in collaboration with KTH. A reduction of energy use and improving the efficiency of existing heating systems are included as part of the environmental work. This report studies the island of Grinda, which is located outside the area of Vaxholm in Stockholm. The study area consists of a guesthouse consisting of a restaurant as well as conference facilities and four neighboring cottages used for overnighting. The cottages now run solely on direct electricity, both for heating and hot water.