Sök:

Sökresultat:

2096 Uppsatser om Equipment for precision measurements in 3D for underwater applications - Sida 16 av 140

Kommunikation på byggarbetsplatsen : Förbättringsmöjligheter med modern teknik

This Thesis in Military Technology deals with experiences drawn from the forced introduction of Weapons Station 01, 2009. The work aims to identify the experiences regarding the forced procurement of military equipment to see how they can develop normal and fast procurement of equipment. The main conclusions of  this work, is to achieve greater capability and increase the military utility, are: -          Common objectives and priorities of stakeholders-          Response and joint types shall determine requirements for system-          Ensure an integrated project team also at lower levels-          Engage the integrated logistic support early in the materiel process-          Include Armed Forces staff as early as possible in the testing and validation-          Prioritize work to facilitate the rapid development of decision on use (BOA)-          Provide back up for increased redundancy in the mission area .

Regressionsmodellering av dynamiska råemissioner från statiska mätningar

By using steady-state measurements for predicting emissions under a dynamic drive cycle wouldsave a lot of time and money for the exhaust aftertreatment specialists at Volvo cars. The idea forthis thesis has been to investigate if statistical regression models can be used with good accuracy.Questions included are for example if common operating variables such as engine speed, air-fuelratio etc. is sufficient to predict engine-out emissions over the engine operating range with goodaccuracy. Focus was set on the modelling of warm engine, but also the more complex engineheat-up phase was investigated since it is a great contributor to total emissions. While NOxcouldnot be measured because of malfunctioning measurement equipment, only HC, CO andtemperature at inlet of first catalytic converter has been modelled.

Virtualiseringsproblematik i företagsmiljö

The purpose of the study was to identify and analyse the implications of client virtualisation in company environments. The study chose to focus on the aspects of the current hardware, license management, application management, maintenance work and the implications virtualization would have on these. The work in the study was chosen to limit itself to a Windows environment.The background to the study was due to a growing need to be more flexible and mobile in company environments and in collaboration with the University of Jönköping a problem description and the framing of questions was defined. The essay tooka qualitative initiative to comprehend the complexity of the problem at hand. The empirical data was collected from interviews, literature studies and laboratory work testing applications.

Högfrekventa tryckvariationer under de senaste århundradena

Long time-series of pressure measurements often have high quality because the early instrumentsare more or less the same as the modern ones. A time-series from Lund consisting of three dailymeasurements from 1780-1997 has been homogenised and is therefore suitable for analysingpossible influences of the enhanced greenhouse effect. According to a two-layer model of theatmosphere one finds a shift in the frequency of baroclinic instability due to an increasedtemperature gradient caused by the increasing CO2. Baroclinic instability over the Atlantic Oceanis the main cause for frontal zone production, causing cyclonic activity over the southern part ofScandinavia. Changes to the baroclinic instability would therefore be traceable in the time seriesfrom Lund.

Ett steg närmare Just-in-Time : En studie av JIT-försörjning vid GGP Sweden AB

This study looks into the possibility, and profitability, of expanding a pilot project that has been put into action at GGP Sweden AB in Tranås, a manufacturing company that produces front mowers. The pilot project is meant to give GGP Sweden AB a more precise control of the flow of goods from their suppliers, and its essence has proven to be quite similar to the Japanese Just-in-Time philosophy.The study has been divided into four separate areas; mapping, supplier selection, supplier evaluation and cost analysis. These areas represent a holistic perspective on the expansion of the pilot project and cover topics varying from methods of finding suitable JIT-suppliers, constructing Key Performance Indicators (KPI) to reviewing costs and assessing profitabilities.In this report, the reader will initially take part in the works of mapping GGP?s manufacturing unit, pilot project and supplier base, which results in a list containing the most suitable suppliers for a Just-in-Time based collaboration. Afterwards, the reader will be led into the area of supplier evaluation, where five KPI?s are created with the purpose of ensuring that GGP will be able to evaluate their suppliers and pilot project in an effective way.

The Lake

The purpose of ?The Lake? was to create an experience with music and visuals working with no budget.A personal purpose was that I wanted to explore new areas in design, like scenography, and combine them with my previous knowledge and skills. My method was to keep my hands busy at all times and use new materials. I also wanted to work with other creators and learn from their methods. Together with a musician I created the music and the concept for the project.

Reglering av matarsystem vid höghastighetskapning

Today small metal parts are mass-produced as for example rollers in cylinder bearings. At high velocity cutting the metal is cut with a great force in a scissor-like device. Both precision and repeatability is important to be able to guarantee good quality, but from an economical point of view it is also important to keep a great manufacturing capacity. The part of the process that is most time consuming is when the metal bar, that is about to be cut, is fed to the right position. Therefore it is interesting to examine if the time used for positioning can be reduced.

Framtidens meny för ett IT-system

The mission was to create a prototype of a menu system for the companySystem Andersson AB. The instructions were that it has to be as interesting andmodern now as in 20 years. We had to look at technology from the cutting edgeof development to make our prototype survive in the future. WindowsPresentation Foundation (WPF) was the technique we focused on. There areonly a few applications that take advantage of WPF today, but it is predictedthat WPF will be the next generation method for developing applications to theWindows platform.To make our menu visually appealing, easy to use and at the same timefunctional, we followed the clear path and guidelines that are available ininteraction design.

En bra plats för lek : kreativ och tillgänglig lekplats i Hedemora

For an outdoor environment to function optimally as a playarea requires that it is flexible, that is, contains places and elements that give room for the imagination and for own interpetretations, and also that the children in some way can influence and change their surroundings. It is also important to have variety, both in the sense that the playground has a unique character that distinguishes it from other places, and that it allows many different games and activities. There should for example be room for both wild games of running and moving around where many children can participate, and calm corners to withdraw to for rest or quiet play. A good playground should surprise, challenge and encourage children to discover their surroundings. One way to achive this is to use plants and materials from nature, whose irregular forms and structures can become interesting elements to explore. Vegetation also gives sence-experiences of various kinds, materials like twigs and leafs to play with and a place to play house.

Lean inom sjukvåren : Effektivisering av patientflöde

This report describes the planning and the accomplishment of the final diploma workat the study program Mechanical Engineering, Department of Engineering Sciences, Uppsala University. Two students carried out the diploma work at GE HealthcareHusbyborg in Uppsala.The aim of the diploma work was to develop and improve existing processequipment for 11C-radiochemistry in PET. The process equipment was to be dividedinto smaller independent modules to make it more flexible. Part of the existingprocess equipment is an oven that is supposed to perform a specific chemicalreaction. One of the main goals was to study and improve this oven.The work could be divided into three main phases: 1.Present concepts for one module, and interface between different modules.

Akustik och säkerhet i inomhusarenor

The background to the study is that within the next ten years about 50 new multi-purposeindoor arenas will be built. These are used for various events such as sports, concerts, etc. In order to achieve a high level of security in the case of danger alarm signals and alarmmessages must be heard well by the visitors. ÅF-Ingemansson wanted to show builders the importance of good speech perception and that it is not observed in arenas today. They conducted technical tests on two large multi purpose indoor arenas to develop parameters that affect speech perception in the arena.To get a subjective view of how these arenas are experienced a survey was created.

Framtida markbaserade precisionsbekämpningssystem i den nya Försvarsmakten

Uppgiften är att utarbeta ett förslag på inriktning vid val av ett framtida markbaserat precisionsbekämpningssystem för den nya Försvarsmakten. Uppsatsen tar avstamp utifrån RMA, även kallad ?den nya krigföringen?, som antas vara den vision som gäller när det nya försvaret skall formas. Inledningsvis studeras de trender och pågående projekt som föreligger. Dessa får sedan lägga grunden för ett antal spelkort som bedöms utifrån de förväntade krav som kommer att ställas i framtiden.

Underhåll av Turbomin 100

AbstractStudents at Mälardalen University have long performed their lab on a small turbojet engine in the course Aircraft Engine Technology. Since 2011, the engine has been dysfunctional. This was due to lack of maintenance. Since the lab has been an important element in teaching, the University had decided to get the engine functional again. This thesis project has been a request of Mälardalen University.The task we were assigned to was:1.

Visualiseringsverktyg för Sykedjor

This thesis has been done in order to ease the process of drawing schematics ofelectrical wiring. The need arose after demand from the government due to a seriesof incidents that took place during the revision of the nuclear power plant in year2009.The task of the project has been to create a computer program that can generate agraphical representation of the electrical components relations. The basis for theprogram has been an example of how the client wants the graphical representation tolook. During the course of the project weekly meetings have occured in which theclient has reviewed the work.The result of the project is a program written in Visual Basic Applications that can berun in Microsoft Excel. The program is capable of generating graphics for a majority ofthe cases.

Framtagning av nytt mätsystem för mätning av energiförbrukning i mikrovågsugnar

The report describes a measuring method for analysis of energy consumption measurement in microwave ovens. Concurrently that the awareness of the environment evolves the demands are growing for more power saving products. This is also counting within the Home Appliance business, which is Whirlpools business area. Whirlpool is therefore interested of launching microwave ovens with documented low power consumption. To be able to implement this, both asserted measuring equipment, that fulfils all demands, and a standard procedure is required.

<- Föregående sida 16 Nästa sida ->