Sökresultat:
2370 Uppsatser om Equipment cost estimation - Sida 11 av 158
Försäkringsbolags kostnader för reparation av fuktskadade badrum
The purpose of this report is to compile and examine the cost of renovation of moisture-damaged bathrooms, to derive a target price. The target price can then be used by insurance companies to estimate the ultimate cost of future bathroom renovations. The method is based on the compilation and comparison of the cost of repairs of previous water damage in bathrooms. The calculations compiled based on repair estimates for different insurance losses from one of the leading insurance companies in Sweden. The result shows the average price per square meter of floor area for different sizes of bathrooms. The average price is the basis for the estimate of future renovation costs of bathrooms. The results further show that the bathroom finishes, area and the distance between the entrepreneur and the location of the renovation have great impact on the final repairing cost.
Prismodeller för Facilities Management-tjänster
A study has been conducted on how organizations in Sweden administer costs of facilities management services internally. There are three main theoretical methods for administering costs. In the first method, costs are maintained on a central level; in the second method, costs are allocated and in the third method, internal transfer pricing is used. The aim of the study is to identify which methods are applied in practice, to evaluate whether the methods fulfill their intended purposes and to study the relationship between the methods used and the cost level of facilites management services. In practice, a large diversity of methods are used for facilities management costs.
Gäddan & fisket i Ringsjöholm : en osteologisk metodstudie i säsong & bevarande
This paper presents the results from an osteological method study of the Ringsjöholm fishbone material. Ringsjöholm is located in Scania, southern Sweden and is 14C dated to 5960-5200 B.P. The aim of this paper is to critically analyse methods used on fish bone material in estimations of season. Three different approaches were used to estimate the fishing season at the Ringsjöholm settlement; 1) identified species, 2) size estimations of the pike based on Enghoffs (1994-95) regression formulae of os dentale, and 3) growth rings of the pike vertebrae.The identified species and the size estimations of the pike points to the fishing being active both during spring and summer. Growth rings analysis of the pike vertebrae didn?t give any quantitative results because of fragmentation.
Konsekvenser av oplanerade verksamhetsavbrott orsakat av fel på medicinteknisk utrustning : En studie inom Länssjukhuset i Kalmar med fokus på drift, säkerhet och kvalitet
Title:The issue of unplanned stoppages caused by failure in medical technology equipment ? A study within the hospital of Kalmar with a focus on manage-ment, security and quality Author:Anna Förster, Ambika Linder, Sandra Nyqvist Tutor:Thomas Karlsson Institution:Linnaeus School of Business and Economics - Linnaeus University Kalmar Date:2011-01-14 Purpose:The purpose of this study was to examine unplanned stoppages caused by medical technology equipment failure in the healthcare operation within the hospital of Kalmar. Our study is based on a number of specifically selected incidents which show the consequences these disruptions cause in management, security and quality within the operation. Our intention was also to examine what role the medical technology department of the hospital plays in the care production operation during these unplanned stoppages. Method:Through a qualitative study we have generated material from a number of interviews with staff working in the hospital of Kalmar.
Totalkostnadsmodell för distributionsnätverk med internationella containertransporter
Purpose ? The purpose of this thesis is to develop a total cost model for container transports and create a tool that calculates a suitable transport quantity from an economic view, which fulfills the demands on delivery service. To achieve this purpose the following questions will be answered:Which costs are affected by the decision between the two transport alternatives LCL and FCL? How does the decision of sending product LCL or FCL influence the delivery service? How can a tool be constructed to simplify the decision-making process regarding the choice of sending products LCL or FCL? Method ? A total cost model was developed. This model is supported from existing literature.
Buntning av grot med lastbilsmonterad utrustning :
During the transportation of logging residues (LR) the material´s low density is a problem that results in low use of pay-load capacity. Comminution or compression of LR are possible methods to increase pay-loads. In the present thesis studied a bundling machine which was mounted on a truck chassis, and the subsequent transport and crushing. The truck bundler created bundles that were larger and longer than other bundling equipment on the market. The objectives were to determine the total time consumption and its allocation over work element and machinery, to measure dry matter (DM) content of green and brown LR-bundles.
Emballage för väggelement i trä : Paketering, hantering, lager och transport
As a company it is required to work with strategies to minimize costs such as packaging and logistic costs. The increased market of industrial produced wooden buildings results that the time and the cost which the packaging of prefabricated building elements consume, is experienced to be in greater need of development than before and demands a better solution. The aim with this dissertation was to discover how the development of the handling of the packaging can improve the packaging process. The goal was to present improvement proposals for a simplified and thereby a more efficient production in time and cost perspective.The packaging process which includes packaging, handling, storage and transport were studied. Interviews were made with participants from the market for manufacturers of wooden houses and a case study was made at the company A-hus.
Utveckling av nytt koncept för positioneringsslid
A manufacturing machine at the engineering company Sandvik Coromant has a positioning table which task is to move an item linearly. The positioning table has a linear motor capable of high velocity and acceleration. This makes it possible to achieve short cycle times and a more profitable production.The purpose of this thesis is to bring forward a new concept which is more adapted to the requirements of the positioning table. The reason is that the current positioning table provides an unnecessarily positioning accuracy of 0.01 mm, while the requirement for the positioning accuracy is just 0.1 mm. The goal is to reduce manufacturing and component costs.To develop a suitable solution an approach for the concept development process has been performed.
Pressning och hantering av halm som energiråvara
I?ve tried to find the most effective and cost effective way to harvest straw for energy recovery.You can choose between round bales and big square bales. Square bales are the cheapest way to produce straw for fuel recovery because you can optimize the length of the bales so they fit the transportation equipment.In the Malmö area the average days of harvesting hay is 55. The effectively of transportation depends mostly of the speed, the distance and density of the bales. To increase the capacity of bale transportation larger loads and higher density of the bales is necessary.
Prestationsmätning ur ett kostnadsledarstrategiskt perspektiv : En fallstudie på Gekås Ullared AB
Bachelor thesis, Business Administration and Economics Programme, School of Business and Economics at Linnaeus University in Va?xjo?.Spring of 2015 Title: Performance measurement from a cost leadership perspective - A case study on Gekås.Authors: Adrienn Csiszer, Hannah Lundberg & Helena WennerströmTutor: Eva GustavssonExaminer: Karin Jonnergård Keywords: Performance measurement, Performance measurement systems, Generic strategy, Cost leadership strategy, Financial and non-financial measurements. Purpose: The purpose of this study is to examine how a company with a clear cost leadership strategy chooses to work with performance measurements, with a view to comparing a practical example to theorethical approaches. Methodology: The method chosen for this paper is a case study on Gekås AB. The presented data were collected through interviews conducted with four employees on Gekås. Conclusion: The study concludes that for a business with cost leadership strategy the financial measurements are more important than non-financial meausurements. For Gekås it is important to keep the performance measurement simple and understandable for the employees. They only use three measurements (sales, hours and sales per hour) in planning and in evaluation.
ATP bioluminescence to establish a test procedure for hygiene testing of liners and tubes on farm level : an investigation of the effect of ageing on the hygienic status of rubber liners and tubes
When rubber equipment in a milking system ages, physical and chemical deterioration occurs and cracks, crevices, as well as deposits of organic and inorganic material is formed on the surface. Bacterial colonization can accumulate, especially on ageing rubber equipment and if the cleaning procedure is not functioning properly. Formation of biofilm in milking equipment could in turn cause bacterial contamination of bulk tank milk. ATP bioluminescence is a fast and easy way to determine the hygienic status of a surface based on its ATP content, and results are given in relative light units (RLU). The method measures both bacterial contamination as well as residues from other organic material.
Kostnadsallokering genom ABC-kalkylering – en empirisk studie av OMX
As IT service departments in organisations are becoming more complex and customised, the indirect costs are increasing in relation to the total costs. The difficulty of fully estimating and identifying the spread of the cost in the IT service department is increasing. As a result, firms tend to budget the business unit as a total cost rather than as a spread of defined costs. In order to deal with this challenge an ABC calculation will be applied. The Time Driven ABC model will be conducted in OMX´s Servicedesk unit within the IT services.
Optimerade material för optiska komponenter i koncentrerande solfångare
The energy consumption continues to increase as the use of electronics and energy consuming equipment increases. The use of fossil fuels has to be phased out for this to be sustainable in the long run while the use of renewable energy continues to increase. A renewable energy source is solar energy but the production of heat and electricity are today very expensive compared to other energy sources and an important task for the solar energy market to grow is therefore to minimize the production cost of the solar collectors while increasing its efficiency to produce heat and/or electricity. One way to convert solar energy into heat is by using solar collectors and electricity can be produced by utilizing the produced heat, or by applying solar cells.This thesis aims to recommend a reflective material for the next generation solar collectors from Absolicon and to recommend a commercially available coating for the receiver tube of the solar collector. A market study has been carried out to investigate the cost-related aspects along with the optical and durable aspects for the optical material of the solar collector.
Hållbar Ö ? en analys av möjligheterna att försörja ett modellösamhälle i Stilla Havet med solel
The goal of this paper is to provide a model for a sustainable electricity system to an island, in the Pacific Ocean near the equator.The method which has been used is to model supply and demand of electricity in the computer program Stella, through the creation of a dynamic system that balances them against each other. The result from the model will then be used to calculate the electricity price per kWh for the island.The result of the work is that electricity from solar energy is comparable with electricity produced from oil, if the oil pays for all its external costs, and the potential for pumped hydro storage plants is located. It also requires that consumers of electricity can be their own producers to avoid the expenditure of tax and reducing the cost of distribution. But since oil is a finite resource and has had a rising cost in recent years, while solar energy has had a declining cost, perhaps this will be a more competitive solution in the future.
Tillförlitlighet hos trafikolycksklassificering
Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.