Sök:

Sökresultat:

3664 Uppsatser om Energy-efficient building - Sida 24 av 245

Hunnebergs Gård ? en förstudie av möjliga verksamheter

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Energikartläggning av biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production.The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with thenmeasured time of usage.

Energikartläggning vid biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production. The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with the measured time of usage.

Jämförelse mellan gamla PBL och nya PBL : Med fokus på bygglovets överklagande och möjlighet att vinna laga kraft

This thesis provides a comparison of the old Planning and Building act (PBA) from 1987 with the new PBA, which entered into force in May 2011. The essay consists of a descriptive part that presents the regulation of both laws. The new PBA consists of several differences compared to previous regulation. This thesis will, however, primarily be centred around the regulation regarding building permit appeals and the possibility of building permit, to gain legal force.In the old PBL, there were no regulations that result in a building permit decision could be made effective. Instead, a building permit could, long after the decision had been made, be over-challenged.

Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Energideklarationer - Marknad och Kundkytta

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Bygga hus i traditionell härjedalsstil

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Infallsvinklar och angreppssa?tt fo?r en svensk livsmedelsstrategi : En utredning av angreppspunkter och betraktelsesa?tt hos livsmedelsstrategi-intressenter samt ha?llbarhetsaspekter av dessa.

Understensho?jden is Stockholm's largest eco-village which was built in the early 1990s with the vision of enabling ecological living for people. However the ecovillage is no longer considered as environmentally friendly because of its relatively high energy consumption, and non-updated energy system. The purpose of this study is therefore to investigate how Understensho?jden should reduce their energy consumption and upgrade its energy system by using Blower-Door, IR-camera and Design Builder.

Företags informationsförmedling i en bostadsköpprocess

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Utformning av förfrågningsunderlag vid totalentreprenader

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hur påverkar energi- och proteinrik kost intaget av energi och makronutrienter?

Today 70 percent of the people residing in nursing homes are undernourished. One way to avoid that an individual is affected by malnutrition it is a necessity that the meals is customized after special needs current among other things as energy and protein. Food record is a method that can be used to examine and evaluate if an individual is getting sufficient nutrition and energy to cover the daily needs. For those suffering from malnutrition it is recommended to eat energy and protein enriched diet.AimsThe aim is to compare the intake of energy and macronutrients in a group of elderly people living in a nursing home in southern Sweden before and after the introduction of an energy and protein enriched diet based on newly developed recipes.MethodsFood record was made during four days. Food record means that everything that is consumed by an individual is noted precisely.

Fastighetsunderhåll : Arbete med underhållsplaner i stora fastighetsbolag

Background: The standard of living should be the same for everyone, whether the apartment is placed in an old or new building. The residential properties that were built from 1965 until 1974 is now beginning to become old and in need of restoration. The financial crisis during the nineties contributed to the lack of maintenance on the buildings in Sweden. As the public buildings gets older more and more defects occurs. The coordination and maintenance will therefore have a more significant role in the housing company ?s work.The increasing interest about how old a building can be, attract much attention.

Passivhus med prefabelement : En jämförelse mellan en platstillverkad konstruktion och prefabelement från Masonite Lättelement AB

This thesis conducted at the University of Uppsala investigateshow well a prefabricated building component from the manufacturerMasonite Lättelement AB can be incorporated into ahouse projected to accomplish the demanding criteria of a passivehouse. The thesis is organized as a comparison betweenthe prefabricated elements and an on-site built component fromthe passive house area of Oxtorget in Värnamo, Sweden. Theaspects investigated were air leakage, energy, moisture, economyand noise conditions.Results of the comparative analyzes shows that the prefabricatedproducts were capable of accomplishing the requirementsof passive houses and therefore this thesis should beviewed as a basis to confirm that the technology of prefabricatedbuilding components today in Sweden are mature enoughto be a significant part of the passive houses that are to be builtin the near future. The development of prefabricated technologyis of crucial significance if we are to accomplish the goalsof reduced energy consumption by the year 2020..

Utredning av primärluftförvärmning till två avfallseldade pannor

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

<- Föregående sida 24 Nästa sida ->