Sökresultat:
2244 Uppsatser om Energy measurements - Sida 13 av 150
Projekteringshandbok i praktiken. En studie om hur en projekteringshandbok används och kan förbättras
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Koffeins påverkan på osmolariteten i tårfilmen
Purpose: The purpose of this study was to investigate if there was a difference in the tear film?s osmolarity before and after drinking coffee. 'Method: All subjects in this study were asked to fill in a questionnaire to diagnose factors in their subjective symptoms, the questionnaire TERTC-DEQ. The subjects with a total graduated points of over 17 were not allowed to participate in the further measurements. In the study there was a total amount of 38 subjects, were 5 participated twice for both measurements, coffee and water.
Mätning och undersökning av elkvalitén i elnätet på reningsverket GRYYAB, Göteborg
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Uppföljning av räckesreparationskostnader inom Vägverket Region Norr/Sydöst
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ekonomiska konsekvenser för energisparande åtgärder vid ombyggnad. Upprustning av miljonprogrammet
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Effektiviseringsåtgärder i tryckluftsystemet hos Vattenfall Värme Uppsala
In this work an assessment of the compressed air system in the facilities of Vattenfall Heat Uppsala has been conducted. The facilities constitutes, among others, a combined heat and power plant, and two waste incineration plants. The compressed air is supplied primarily by seven rotary screw compressors and yearly electric energy consumption in these has been determined. Furthermore, the usage of compressed air has been mapped in order to find processes with energy savings potential. Several suggestions how to reduce the usage of compressed air have been presented, resulting in decreased need of electric energy and reduced CO2-emissions.The results show that total need of electric energy in the compressors, during a standard production year, amounts to 5.83 GWh.
Solenergi på Nordvästra Kungsholmen
The energy that the earth receives from the sun hourly has potential to cover a year?s energy demand in the world. Further, this type of energy is environmentally friendly, natural and free of cost. This report covers solar energy in an urban environment and consists of a case study of installations of photovoltaic cells in a part of the city of Stockholm. It is mainly the economic aspects that are covered but there is also a discussion about the practical consequences and the sustainability as a result of integration of solar energy in an urban environment. The aim of the study is to present results from economic calculations for utilization of solar energy in chosen buildings in Kungsholmen in Stockholm.
Anläggningsmätning med moderna metoder. Från projektering till färdig anläggning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Passivhusteknik i ett svenskt klimat - en byggnadsfysikalisk riskinventering och erfarenhetssammanställning av befintliga passivhusprojekt
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Industriellt byggande på arbetsplatsen - En jämförelse mellan olika produktionsmetoder för trähus
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Förhöjda havsnivåers påverkan på trafiksystemen. En analys av riskläget i Göteborgs innerstad
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Den kollektiva missuppfattningen. En studie om missuppfattningar om färdmedelsalternativen bil och kollektivtrafik, för boende i Hjuvik
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Samverkansanalys mellan påle och kohesionsjord. Studie av FE-programmet PLAXIS 3D FOUNDATION
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Sommargården - Hållbara uppvärmningsalternativ för stugbyn Sommargården, Finnhamn
Finnhamn is a group of islands that are located in the middle north part of Stockholm?s archipelagos. On the main island Stora Jolpan there is a camp called Sommargården, which consists of eleven different buildings in various sizes. The assignment given by the Archipelago foundation (Skärgårdsstiftelsen) is to analyze if it?s benefited to replace Sommargårdens current heating system that consists of electricity radiators, with a more energy efficient heating system. This research is done with help of the literature review and a visit to Finnhamn in order to map Sommargården?s current state and its energy usage.
Energieffektiv byggnad i stadsmiljö
This report will present an energy efficient building in the centre of Kalmar city. It willbecome energy efficient because of the worldwide goal to reduce our energy using in ourbuildings.The values of architecture have been given a great part in this report. The building is supposed to be placed in Kvarnholmen in a unique environment in centre of Kalmar city.Because of the placement it is very important to show respect to the surroundings and the history of Kalmar..