Sök:

Sökresultat:

2244 Uppsatser om Energy measurements - Sida 11 av 150

Social hållberhet genom medborgardialoger : exemplet Husby

Understensho?jden is Stockholm's largest eco-village which was built in the early 1990s with the vision of enabling ecological living for people. However the ecovillage is no longer considered as environmentally friendly because of its relatively high energy consumption, and non-updated energy system. The purpose of this study is therefore to investigate how Understensho?jden should reduce their energy consumption and upgrade its energy system by using Blower-Door, IR-camera and Design Builder.

En intervjustudie om sjuksköterskors upplevelser av teamarbete på en akutmottagning

Pre-workout (PWO) is one, fast-growing, supplement on the market that promise fat burning, bigger muscels and energy and by buying these expensive supplements, you can get your dreambody faster than others. This study is mainly about researching why people use PWO and what experiences they have about using these supplements. By using a qualitative method I have found out that the participants mainly uses PWO to get energy and focus. This study also shows that my participants thinks that there is a difference in energy between using and not using PWO..

Det självförsörjande passivhuset

The housing sector uses 40 % of the energy in Sweden and half of the electricity usage. Theuse of energy is the main reason to the increasing rate of carbon dioxide in the atmosphere.This is the main motive but also a wish of higher safety, that is a higher rate of selfsufficientenergy production in Sweden, we want to decrease the need of using fossil fuel. Now whenthe energy price rise, the interest in energy issues increase and more people discuss thepossibility of reducing the usage of fossil fuel. A change to renewable energy such as sun,wind and water is the only solution where we can get a sustainable development.One way to contribute to a better use of energy is to build in the principle of passive house.The house is being built with a thick and tight insulation. If you use a heat-exchanger withhigh degree of efficiency and a final heating battery on the ventilation system, the heat fromlamps, devices and the ones living in the house should be enough to fulfil the criteria ofliving.

Bergvärme och solenergi i flerbostadshus : En förstudie över Kv. Uppfarten

The society strives for sustainable development, in the construction industry it is expressed through sustainable building. Energy and LCC analyzes increases the ability to make conscious decisions in the process. A problem in the construction industry is that energy and LCC analysis is not used to the desired extent, as they are perceived as complicated and time consuming. The report aims to achieve a more sustainable building through increased use of energy and LCC analyzes.The goal is to show how BIM can be used to improve the efficiency of the energy and LCC analyzes.The study was conducted with a literature review and a case study to answer which information that is required in a BIM model to perform energy and LCC analyzes. The study also shows which software can be used in BIM based energy and LCC analyzes and how the analyzes can be carried out efficiently.The result shows that effective analyzes may be performed if the BIM-model contains the relevant information for making analyzes.

Metoder att förhindra nedisning av vindkraftverksblad

ABSTRACTMany wind turbines have problems with icing and there is still no effective method to de-ice without stoppage of production and power loss. Here I therefore consider other methods than those available today, and particularly, I consider how these methods could be applied to wind turbines of the company Oxel. A surface where the water droplets do not attach might be the basis for a useful method. If no water attaches, no ice could form. To accomplish this a hydrophobic surface is nessesary, for example wax.

Studie av Karlskogas fjärrvärmenät för att sänka returtemperaturen

A district heating plant has the advantage that it can take advantage of the waste heat from industries and use of cheap fuels to produce heat. But for the long term is competitive requires that energy is also saved in district heating plants. One way to save energy in a district heating system is to increasing cooling to the return temperature. This leads to less power needed to drive the distribution pumps,  and that more energy could be extracted from the same amount of fuel by an improved flue gas condensation.In Karlskoga the return temperature into the district heating plant is high. They would therefore reduce the return temperature in order to extract more energy from the flue gases.

Utvärdering av strömmätningar vid Höga Kusten : Strömmars betydelse för lokalisering av odlingslokaler och utformning av kontrollprogram i kustområden

A study was made to evaluate how current measurementscould help to determine how particles from fish farms are dispersed. During sixweeks of the summer 2012, two different current measurements were conducted.One of them consisted of measurements each fifth minute at 5 m and 15 m atthree locations for 14-16 days each. The other consisted of profilemeasurements at each location at four times during the period of six weeks. Forthe current measurements two instruments (model RCM 9) were used. A two weekmeasurement can give enough data to make an evaluation of how the currents at alocation will transport litter from a fish farm.

Lönsam energieffektivisering : Ett samarbete mellan ÅF och kund

This thesis project has focused on studying ÅF?s business concept Energy Collaboration, which is their way of selling energy efficiency services. Thereforeongoing projects have been analyzed. The purpose was to determine achieved energy efficiency, costs and profitability for the studied projects. It was concluded that the Energy Collaboration is a good way of selling energy efficiency services, since the customer takes no risk and energy savings of about 15-25 % can be achieved with simple measures.

Lokalisering av vågkraftanläggningar : Metodutveckling med GIS och fallstudie Bohuskusten

In this thesis work a Geographical Information System (GIS) based methodology to identify locations suitable for the installation of wave energy converters has been developed. Parameters of importance have been identified and a GIS-database has been set up, containing data about the marine environment. In a case study of the Swedish west coast the methodology has been applied, resulting in a number of maps showing possible areas. The results show that large areas are suitable for installation of wave energy converters, from a technical and economical point of view. When consideration is taken to other interests in the area, such as navigation, fishing and environmental protection, the size of the suitable area diminishes considerably.

En studie av sex ISA-system

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utvärdering av effektstyrningssystemet EnergiDirigent® ur ett miljöperspektiv

Energy Director is a control and measuring system for energy consumption and is part of the product portfolio of E.ON AG for more efficient use of energy, offered to business customers. As of today, the system has only one parameter of control, namely power, and the objective of this essay has been to investigate whether other ones could be added. The emphasis is on the environmental perspective, which is why carbon dioxide has served as an example for this parameter in question.Parallel with the study of Energy Director electricity on the margin, calculations of carbon dioxide equivalents and also the Swedish trade of electricity have all been highlighted. Results indicate that when reductions in energy are made it is endorsed to omit from electricity on the margin rather than some mean distributed electricity, under certain conditions, and in addition the calculations of the reductions should be modified regarding the efficiency of the power stations fuelled by lignite and bituminous coal. Sweden practices trade with the Nordic countries as well as Poland and Germany.

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 11 Nästa sida ->